About this file

This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract issued by the Bureau of Reclamation's Upper Colorado Region for contract 140R4025R0016. The amendment updates two key elements: Specification 01 61 10 Buy American and Clause 52.211-10 Commencement, Prosecution and Completion of Work. The contract requires the contractor to commence work within 21 calendar days of receiving the award notice, prosecute work diligently, and complete the entire construction project for use by May 21, 2028, with a total project completion timeline of 909 calendar days.

The amendment includes multiple attachments totaling nine different documents, such as specifications, drawings, geology logs, wage determinations for San Juan County, New Mexico, past performance questionnaires, project experience documentation, key personnel information, and a subcontracting plan template. Attachment #1.4 specifically contains the 2-page Buy American specification update, while the project involves a comprehensive set of technical and administrative documents for what appears to be a significant infrastructure project involving a pumping plant.

View the file

Other files for this federal contract opportunity

Other files attached to NGWSP PUMPING PLANT 1, newest first.
File Type Posted
Sol_140R4025R0016_Amd_0005.pdf PDF
140R4025R0016_Attachment_1_4_-_01_61_10_-_Buy_American_0004.pdf PDF
140R4025R0016_Attachment_1_3_-_00_00_01_NGWSP_PP1_AMD_No__003_Combined_Specs_0003.pdf PDF
140R4025R0016_Attachment_2_1_-_00_00_02_Drawings_Revised_11x17_08-01-2025_0003.pdf PDF
Sol_140R4025R0016_Amd_0003.pdf PDF
Solicitation_Clarification_Questions___Responses_0003.pdf PDF
Sol_140R4025R0016_Amd_0002.pdf PDF
Sol_140R4025R0016_Amd_0001.pdf PDF
PP1_Site_Tour_Sign-In_0001.pdf PDF
140R4025R0016_Attachment_3_-_00_00_02A_GeologyLogs-B2_G7-G41_NGWSP-PP1_11x17_06-13-2025.pdf PDF
140R4025R0016_Attachment_9_-_Subcontracting_Plan_Template.docx DOCX document
140R4025R0016_Attachment_1_2_-_00_00_01_Specs-_B2_Volume2_NGWSP-PumpingPltNo_1_06-16-2025.pdf PDF
140R4025R0016_Attachment_6_-_Past_Performance_Questionnaire.pdf PDF
140R4025R0016_RFP_PP1_16JUN25.pdf PDF
140R4025R0016_Attachment_1_1_-_00_00_01_Specs-_B2_Volume1_NGWSP-PumpingPltNo_1_06-16-2025.pdf PDF
Sol_140R4025R0016.pdf PDF
140R4025R0016_Attachment_5_-_WD_NM20250046_Building_-_San_Juan_County__NM.pdf PDF
140R4025R0016_Attachment_4_-_WD_NM_20250040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4025R0016_Attachment_8_-_Key_Personnel_Form.docx DOCX document
140R4025R0016_Attachment_2_-_00_00_02_Dwgs-B2_001-189_NGWSP-PP1_11x17_06-14-2025.pdf PDF
140R4025R0016_Attachment_7_-_Experience_Form.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R4025R0016 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Salt Lake City UT 84138

R40

125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation

06/16/20250004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/16/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This solicitation amendment is issued to:

*Update the following Specification:

01 61 10 Buy American

*Update the following clause:

52.211-10 Commencement, Prosecution and Completion of Work April 1984

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Ashton Jones

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

F.2 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK APRIL 1984

The Contractor shall be required to

(a) commence work under this contract within 21 calendar days after the date the Contractor receives the award notice:

(b) prosecute the work diligently, and

(c) complete the entire work ready for use not later than 909 calendar days after the contractor receives the Notice to Proceed issued in accordance with (a) above. The time stated for completion shall include final cleanup of the premises.

1) Complete the construction for use by May 21, 2028.

(End of Clause)

SECTION J – List of Attachments and Exhibits

Attachment Number Description Number of Pages Attachment #1 Specifications

Attachment #1.1 00 00 01_Specs-B-B2_Volume1_NGWSP- PumpingPltNo.1_06-16-2025

Attachment #1.2 00 00 01_Specs-B_Volume2_NGWSP- PumpingPltNo.1_06-16-2025

Attachment #1.3 (Amendment 0003) 00 00 01_NGWSP PP1_AMD No. 003 Combined Specs

Attachment #1.4 (Amendment 0004) 01 61 10 – Buy American 2 Attachment #2 00 00 02_Dwgs-B_001-189_NGWSP-

PP1_11x17_06-14-2025

Attachment 2.1 (Amendment 0003) 00 00 02_Drawings Revised_11x17_08-01-

Attachment #3 00 00 02A_GeologyLogs-B2_G7- G41_NGWSP-PP1_11x17_06-13-2025

Attachment #4 WD NM20250040 Heavy – San Juan County, NM

Attachment #5 WD NM20250046 Building – San Juan County, NM

Attachment #6 Past Performance Questionnaire 4 Attachment #7 Project Experience 1 Attachment #8 Key Personnel 2 Attachment #9 Subcontracting Plan Template 9