This document is a Price Schedule (Section B) for the Navajo-Gallup Water Supply Project's San Juan Lateral - Pumping Plant No. 1, detailing a comprehensive construction contract with numerous line items spanning multiple technical divisions. The price schedule includes 95 Contract Line Item Numbers (CLINs) covering a wide range of construction activities and materials, including mobilization, document management, electrical systems, concrete work, metal fabrications, fire suppression, HVAC, piping systems, earthwork, fencing, seeding, valves, and specialized equipment like vertical turbine pumping units and a gantry crane.
The contract involves detailed specifications for each line item, with most items priced as lump sum and some with specific quantities, such as 170,000 lbs of concrete reinforcing, 1,450 cubic yards of concrete, and 38,400 linear feet of conductors and cables. The pricing structure allows for comprehensive cost tracking, with items ranging from preparatory work and temporary utilities to final drawings, operations and maintenance manuals, and specialized system installations. The total project appears to be for a water supply pumping plant infrastructure, with precise engineering and construction requirements across multiple technical disciplines.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo-Gallup Water Supply Project Amendment No. 003 San Juan Lateral – Pumping Plant No. 1 Solicitation No.
Revised Price Schedule
B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
SAN JUAN LATERAL – PUMPING PLANT NO. 1
NAVAJO-GALLUP WATER SUPPLY PROJECT, NEW MEXICO
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against Government for overruns or underruns. Contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
(f) Note: In accordance with Section 7-9-3.3 of New Mexico Statutes Annotated (NMSA) 1978 and Section 402 of Navajo Nation’s Business Activity Tax Statute, it is Contractor’s responsibility to ensure that all applicable New Mexico Gross Receipts Tax and Navajo Nation Gross Receipts Tax are included in their price proposal.
(g) In accordance with FAR 52.232-5 (Payments under Fixed-Price Construction Contracts) (b)(2), payment may be approved for materials delivered to Contractor at locations other than the site if Contractor obtains CO approval prior to making arrangements for obtaining the materials. Contractor shall also be required to complete a “Materials on Hand Certificate” which will certify:
(1) Materials described for use on identified contract.
(2) Materials are clearly marked to identify that they belong to contract cited.
(3) Full title for those materials vested in Prime Contractor sited.
(4) Materials are free of liens and encumbrances.
(5) Materials are properly store, secured, and protected against loss or damage.
B - 2
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
1 WBR
1452.232-
Mobilization and Preparatory Work
For the lump sum of $
2 01 31 30 Contract Document Management System
For the lump sum of $
3 01 51 00 Construction Temporary Electric Power
12 months $ $
4 01 51 00 Testing and Commissioning Electric Power
1 month $ $
5 01 51 00 Construction Water 12 month $ $
6 01 56 15 Utility Crossing Investigation For the lump sum of $
7 01 78 30 As-Built Drawings For the lump sum of $
8 01 78 30 Final Drawings For the lump sum of $260,000
9 01 78 30 Operations and Maintenance (O&M) Manuals
For the lump sum of $260,000
10 01 80 15 Commissioning For the lump sum of $200,000
11 03 20 00 Concrete Reinforcing 170,000 lbs $ $
12 03 30 00 Concrete 1,450 cu yds $ $
13 03 35 10 Concrete Floor Hardener 13,500 sq ft $ $
14 03 48 00 Plant-Precast Concrete Structures
For the lump sum of $
15 04 22 10 Reinforced Concrete Unit Masonry Assemblies
For the lump sum of $
16 05 50 00 Metal Fabrications For the lump sum of $
17 06 82 10 Fiberglass Reinforced Plastic (FRP) Fabrications
For the lump sum of $
18 07 19 20 Silane Water Repellent For the lump sum of $
B - 3
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
19 10 14 00 Signage For the lump sum of $
20 10 44 20 Fire Extinguishers For the lump sum of $
21 13 34 21 Metal Building System For the lump sum of $
22 21 25 00 Hybrid Water Mist Fire Suppression System
For the lump sum of $
23 22 13 16 Plant Piping Systems For the lump sum of $
24 22 14 30 Sump Pumping Systems For the lump sum of $
25 23 00 00 Heating, Ventilating, and Air- Conditioning (HVAC) System
For the lump sum of $
26 25 00 01 System Control and Monitoring For the lump sum of $
27 26 05 10 Conductors and Cables 38,400 lin ft $ $
28 26 05 13 Medium-Voltage Power Cable 4,900 lin ft $ $
29 26 05 13 Medium-Voltage Power Cable Accessories
For the lump sum of $
30 26 05 20 Ground Cable 1,750 lin ft $ $
31 26 05 20 Ground Rods 4 ea $ $
32 26 05 20 Electrical Ground Resistance Test
For the lump sum of $
33 26 05 33 Electrical Conduit 9,500 lin ft $ $
34 26 05 33 Fabricated Sheet Steel Boxes, Wiring Troughs, and Precast Handholes
For the lump sum of $
35 26 05 36 Cable Trays 530 lin ft $ $
36 26 12 19 Pad Mounted Transformer (Installation Only)
For the lump sum of $
37 26 17 20 Metal-Clad Switchgear Assembly
For the lump sum of $
B - 4
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
38 26 18 39 Medium-Voltage Motor Controllers
For the lump sum of $
39 26 22 12 Dry-Type Transformer For the lump sum of $
40 26 24 13 Switchboards For the lump sum of $
41 26 24 41 Distribution Panelboards For the lump sum of $
42 26 26 10 Transformer Load Center For the lump sum of $
43 26 27 40 Wiring Devices For the lump sum of $
44 26 32 10 Diesel Engine-Generator Set For the lump sum of $
45 26 42 00 Corrosion System(s) For the lump sum of $
46 26 42 15 Galvanic Anode Cathodic Protection for Welded Steel Tanks
For the lump sum of $
47 26 51 00 Interior Lighting For the lump sum of $
48 26 52 00 Emergency and Exit Lighting For the lump sum of $
49 26 56 00 Exterior Lighting For the lump sum of $
50 27 30 01 Telephone System For the lump sum of $
51 28 10 01 Security and Surveillance System
For the lump sum of $
52 28 31 00 Fire Detection and Alarm For the lump sum of $
53 31 02 10 Water for Dust Abatement 140 Mgal $ $
54 31 02 30 Dust Palliative 3.0 acres $ $
55 31 03 33 Removal of Water from Excavation
For the lump sum of $
56 31 23 10 Common Excavation for Site and Structures
18,500 cu yd $ $
B - 5
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
57 31 23 10 Rock Excavation for Site and Structures
100 cu yd $ $
58 31 23 10 Compacted Backfill for Site and Structures
37,000 cu yd $ $
59 31 23 10 Processing of Site and Foundation Materials
18,500 cu yd $ $
60 31 23 15 Access Road Investigation and Design
For the lump sum of $
61 31 23 15 Access Road Construction For the lump sum of $
62 31 23 50 Earthwork for Roads For the lump sum of $
63 31 37 00 Riprap 570 cu yd $ $
64 32 15 10 Gravel Surfacing 1,200 cu yd $ $
65 32 31 01 Fence Grounding For the lump sum of $
66 32 31 10 Chain Link Fence 1,000 lin ft $ $
67 32 91 60 Erosion Control Blanket 2,300 sq yd $ $
68 32 92 20 Seeding 0.9 acre $ $
69 33 09 13 Flowmeter Systems For the lump sum of $
70 33 12 71 Vertical Turbine Pumping Units
6 ea $ $
71 33 16 14 Air Chambers and Air Compressors
For the lump sum of $
72 33 42 50 Reinforced Concrete Pipe Culvert (Refer to drawings)
For the lump sum of $
73 35 21 95 Steel Manifold Piping For the lump sum of $
74 35 22 14 Air Valves; 6-inch 2 ea $ $
75 35 22 14 Air Valves; 3-inch 13 ea $ $
B - 6
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
76 35 22 14 Air Valves; 3-inch; high pressure
6 ea $ $
77 35 22 14 Automatic Ball Drip Valves 3 ea $ $
78 35 22 14 Ball Valve; 18-inch 6 ea $ $
79 35 22 14 Ball Valve; 6-inch 3 ea $ $
80 35 22 14 Ball Valve; 3-inch 18 ea $ $
81 35 22 14 Ball Valve; 2-inch 11 ea $ $
82 35 22 14 Ball Valve; 3/4-inch 15 ea $ $
83 35 22 14 Butterfly Valve; 42-inch;
manual
2 ea $ $
84 35 22 14 Butterfly Valve; 20-inch;
manual
6 ea $ $
85 35 22 14 Butterfly Valve; 18-inch;
manual
5 ea $ $
86 35 22 14 Butterfly Valve; 18-inch;
motor operated
1 ea $ $
87 35 22 14 Butterfly Valve; 14-inch;
motor operated
2ea $ $
88 35 22 14 Butterfly Valve; 12-inch;
manual
4 ea $ $
89 35 22 14 Butterfly Valve; 6-inch;
manual handwheel
2 ea $ $
90 35 22 14 Butterfly Valve; 6-inch;
manual buried, Class 250B
3 ea $ $
91 35 22 14 Check Valve; 18-inch 6 ea $ $
92 35 22 14 Globe Valve; 2-inch 8 ea $ $
93 35 22 14 Pressure Sustaining Valve;
14-inch
1 ea $ $
B - 7
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price Amount
94 41 22 12 Gantry Crane For the lump sum of $
95 33 14 19 Fire Hydrants For the lump sum of $
TOTAL FOR PRICE SCHEDULE $_________________
END OF SUPPLIES OR SERVICES AND PRICES
B - 8
This page intentionally left blank.
Navajo-Gallup Water Supply Project Amendment No. 003
Revised Table of Contents
00 01 10 - 1
SECTION C - DESCRIPTION/SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 12 10 Other Contracts 01 14 10 Use of Site 01 14 12 Work Restrictions and Limitations 01 31 04 Partnering 01 31 19 Project Management and Coordination 01 31 30 Contract Document Management System 01 32 10 Construction Program 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 33 28 Fire Alarm Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 46 25 Special Inspections 01 51 00 Temporary Utilities 01 52 10 Field Office 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 15 Protection of Existing Utilities 01 56 20 Existing Fences 01 56 32 Temporary Safety Fence 01 57 10 Cross Drainage 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 40 Pesticides 01 57 50 Tree and Plant Protection 01 57 60 Protected Species 01 57 90 Preservation of Historical and Archeological Data 01 60 00 Product Requirements 01 61 10 Buy American 01 64 40 Government Furnished Products 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents 01 80 15 Commissioning
Navajo-Gallup Water Supply Project Amendment No. 003
00 01 10 - 2
DIVISION 03 - CONCRETE
03 11 10 Concrete Forming 03 20 00 Concrete Reinforcing 03 20 60 Concrete Anchors 03 30 00 Cast-In-Place Concrete 03 35 10 Concrete Floor Hardener 03 48 00 Plant-Precast Concrete Structures 03 62 20 Nonshrink Grout 03 63 00 Epoxy Grout
DIVISION 04 - MASONRY
04 22 10 Reinforced Concrete Unit Masonry Assemblies
DIVISION 05 - METALS
05 12 10 Structural Steel 05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 05 51 30 Metal Ladders 05 52 20 Fall Protection Rail System
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 82 10 Fiberglass Reinforced Plastic (FRP) Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 19 20 Silane Water Repellant 07 21 13 Sound Control Batt Insulation 07 21 20 Extruded Polystyrene Foam Insulation 07 21 50 Spray-Applied Polyurethane Foam Insulation 07 41 13 Insulated Metal Roof Panels 07 42 13 Insulated Metal Wall Panels 07 72 30 Roof Hatches 07 92 00 Joint Sealants and Masonry Joints
DIVISION 08 - OPENINGS
08 11 10 Steel Doors and Frames 08 31 25 Floor Access Hatches 08 33 20 Roll-Up Doors 08 41 10 Aluminum Framed Entrances and Storefronts 08 45 13 Structured-Polycarbonate Panel Assemblies 08 71 00 Door Hardware
DIVISION 09 - FINISHES
09 29 00 Gypsum Board 09 65 10 Rubber Wall Base
Navajo-Gallup Water Supply Project Amendment No. 003
00 01 10 - 3
09 96 20 Coatings
DIVISION 10 - SPECIALTIES
10 14 00 Signage 10 44 20 Fire Extinguishers
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 21 Metal Building System
DIVISION 21 - FIRE SUPPRESSION
21 13 13 Automatic Fire Sprinkler Systems 21 25 00 Hybrid Water Mist Fire Suppression System
DIVISION 22 - PLUMBING
22 13 16 Plant Piping Systems 22 14 30 Sump Pumping Systems
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 00 00 Heating, Ventilating and Air-Conditioning (HVAC) Systems 23 05 13 Common Motor Requirements for HVAC Equipment 23 05 29 Supports for HVAC Duct 23 05 53 Identification - HVAC 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 09 00 Instrumentation and Control for HVAC 23 31 00 HVAC Ducts 23 33 00 Air Duct Accessories 23 34 00 HVAC Fans 23 37 00 Air Inlets and Outlets 23 73 13 Packaged Air-Conditioning Units 23 81 26 Split System Air Conditioners 23 82 39 Electric Heat Units
DIVISION 25 - INTEGRATED AUTOMATION
25 00 01 System Control and Monitoring
DIVISION 26 - ELECTRICAL
26 05 02 Basic Electrical Materials and Methods 26 05 10 Conductors and Cables 26 05 13 Medium-Voltage Power Cable System 26 05 20 Grounding and Bonding 26 05 33 Raceways and Boxes 26 05 36 Cable Trays 26 05 90 Wiring Checkout and Tests 26 12 19 Pad Mounted Transformer
Navajo-Gallup Water Supply Project Amendment No. 003
00 01 10 - 4
26 17 20 Metal-Clad Switchgear Assembly 26 18 39 Medium-Voltage Motor Controllers 26 22 12 Dry-Type Transformer 26 24 13 Switchboards 26 24 41 Distribution Panelboards 26 26 10 Transformer Load Center 26 27 40 Wiring Devices 26 32 10 Engine-Generator Sets 26 41 13 Lightning Protection for Buildings 26 42 00 Cathodic Protection Systems 26 42 15 Galvanic Anode Protection for Welded Steel Tanks 26 51 00 Interior Lighting 26 52 00 Emergency and Exit Lighting 26 56 00 Exterior Lighting
DIVISION 27 - COMMUNICATIONS
27 30 01 Telephone System
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 01 Security and Surveillance System 28 31 00 Fire Detection and Alarm
DIVISION 31 - EARTHWORK
31 02 10 Water for Dust Abatement 31 02 30 Dust Palliative 31 03 33 Removal of Water from Excavation 31 11 00 Clearing and Grubbing 31 14 10 Topsoil Stripping, Stockpiling and Placement 31 23 02 Compacting Earth Materials 31 23 10 Earthwork for Site and Structures 31 23 15 Access Road Improvements 31 23 22 Pipe Trench Earthwork 31 23 39 Disposal of Excavated Materials 31 23 50 Earthwork for Roads 31 23 70 Controlled Low Strength Material (CLSM) 31 31 30 Soil-Applied Herbicide 31 37 00 Riprap
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 22 Asphalt Concrete Pavement 32 15 10 Gravel Surfacing 32 31 01 Fence Grounding 32 31 10 Chain Link Fence 32 91 60 Erosion Control Blanket 32 92 20 Seeding
Navajo-Gallup Water Supply Project Amendment No. 003
00 01 10 - 5
DIVISION 33 - UTILITIES
33 09 13 Flowmeter Systems 33 12 71 Vertical Turbine Pumping Units 33 14 19 Fire Hydrants 33 16 14 Air Chambers 33 42 50 Reinforced Concrete Pipe Culvert
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 21 95 Steel Manifold Piping 35 22 14 Valves and Equipment
DIVISION 41 – MATERIAL PROCESSING AND HANDILING EQUIPMENT
41 22 12 Gantry Crane
DIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 10 Permit Applications 51 00 20 I/O Points List 51 00 35 Site Specific Revegetation Plan for Navajo-Gallup Water Supply Project 51 00 50 Electronic Media Release Form 51 00 80 BLM Pesticides
DIVISION 52 - DRAWINGS
52 00 00 Drawings
DIVISION 53 - GEOLOGIC INVESTIGATIONS AND RECORDS
53 10 00 Geologic Investigations 53 20 00 Records of Geologic and Subsurface Investigations
END OF CONTENTS
Navajo-Gallup Water Supply Project Amendment No. 003
00 01 10 - 6
This page intentionally left blank.
Revised Submittals
01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME)
1. ASME Y14.1-2020 Decimal Inch Drawing Sheet Size and
Format
B. National Institute of Building Sciences (NIBS)
1. NIBS NCS-2014 United States National CAD Standards, Version 6
1.03 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittal Types, as listed in Table 01 33 00A – List of Submittals:
1. A – Action:
a. Government will respond as to adequacy of submittal.
b. Action submittals: Considered to be “shop drawings” within terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction.
2. I – Informational:
a. Government will acknowledge receipt of Informational submittals.
b. Government may reject an Informational submittal when submittal does not comply with contract. Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.
c. Informational submittals: Considered to be “shop drawings” within terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction, except that approval by Government is not required.
D. CDMS: Contract Document Management System.
01 33 00 - 2
E. Record As-built Drawings:
1. Set of full-size, hard-copy drawings that contain both Government drawings furnished with this contract and Contractor-produced drawings necessary to clearly identify as-built conditions of the completed project.
F. Final Drawings:
1. Complete electronic set of drawings produced by the Contractor as required by these specifications, updated to reflect all changes made in the field during construction.
G. Operations and Maintenance (O&M) Manuals:
1. Final documentation for functional elements, equipment and systems installed in the finished work, including all information necessary for Government personnel to operate, maintain, and troubleshoot such elements, equipment and systems in a safe, clear, effective, and efficient manner. Include instructions, final drawings and equipment certifications for each element of work.
H. Design Calculations:
1. Calculations and verifications specified in the Government-furnished contract documents. Design calculation and technical requirements are described in relevant specification sections.
2. Design calculations shall be certified by a registered professional.
I. Schedule of Values (SOV):
1. Detailed cost breakdown for construction products and execution activities for each lump sum Contract Line Item Number (CLIN) shown in the Section B Price Schedule. Include separate SOV line items for each major product purchase, execution activity, and/or sequential processes required to complete the work associated with each lump sum CLIN. Do not include costs associated with RSN preparation and submission. The SOV will be used to accurately assess and confirm progress payment amounts for each CLIN.
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
1. Prepare in English.
2. Label with contract number, title, and RSN.
3. Measurement units: US Customary Units.
4. Provide unique transmittal number for each submittal.
01 33 00 - 3
C. Drawings:
1. Minimum identification in title block:
a. Contract number and title.
b. Contractor’s or supplier’s title and drawing number.
c. Date.
2. Reserve 3- by 3-inch space next to title block for review stamps.
3. Print Size: D size (22- by 34-inches) as defined by ASME Y14.1.
4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified:
a. Computer drafted drawings:
1) In accordance with NIBS NCS.
2) Electronic file format: Compatible with AutoCAD, Version 2018 or later.
3) Compile using “eTransmit” utility in AutoCAD.
b. Drawing prepared with drafting equipment, when allowed: Lettering shall be neat.
5. Drawings designated as “Government Format” in specifications:
a. Computer drafted.
b. Government will provide electronic AutoCAD format template.
c. Title block and sheet format:
1) As shown on Standard Drawing 40-D-7102.
2) Government will provide template.
3) Government will provide specific title block information to be used.
01 33 00 - 4
6. Final Drawings:
a. Computer drafted.
b. Government will provide electronic AutoCAD format template.
c. Show as-built changes, including revision dates, made during installation.
Indicate changes by clouding.
d. Electronic Files: On Reclamation issued USB Drive.
D. Product Data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets:
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
E. Certifications:
1. Certifications by a registered professional: Signed and sealed by registered professional:
a. Not required for non-design work.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
F. Manuals:
1. Copies:
a. Printed copies: Bound and indexed.
b. Electronic copies: Searchable Adobe .pdf on Reclamation issued USB
Drive:
1) Bookmark longer files to assist in navigating file.
2) Electronic files may be submitted as separate parts of a manual.
After each separate electronic file is approved, compile each approved electronic file to assemble an entire manual which shall be consistent with final manual submittal.
2. Contents:
a. Parts identification lists, lists of special tools, and accessories.
b. Schematics and wiring diagrams.
c. Detailed instructions for installing, operating, lubricating, and maintaining equipment.
01 33 00 - 5
d. As-built drawings, photographs, and test records or reports if required by specifications.
G. Photographs:
1. Digital files: In .jpeg or similar format.
H. Samples and Color Selection Submittals:
1. Label with complete manufacturer's product and color identification.
2. Include type and quantity of materials specified in the referenced section in each
“set” of samples.
3. Samples: Representative of product to be installed. Xerographic sheets for color selection are not acceptable.
4. Color Chips: Sample paint chips. Ink color reproductions are not acceptable.
5. Label each sample, sample kit, set of color chips, or color chart with contract number and title.
6. Government will select architectural color and pattern after product approval.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A – List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A – List of Submittals:
1. Submittals identified with “CDMS” in “Sets to be sent” column shall be submitted electronically in accordance with Section 01 31 30 – Contract Document Management System.
2. Submittals identified with “CDMS” in the top row of the “Sets to be sent” column require approval (Action) or acknowledgement (Informational) before sending required sets of hardcopy submittals.
3. Submittals identified with “CDMS” in the bottom row of the “Sets to be sent” column require submittal of hardcopy submittals before finalizing submittal in
CDMS.
D. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for each attached submittal.
3. Responsible code.
01 33 00 - 6
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
E. Resubmittal of submittals not approved:
1. Mark changes such that they are readily identifiable and show revision date.
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 28 days after receiving the comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 28 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through digital signature date stamp and upload date in CDMS.
B. Time in Excess of Specified:
1. CO may extend contract completion date to allow additional time for completing work affected by excess review time:
a. Time extension will be to extent that excess review time caused delay to contract completion date.
b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending contract completion date.
2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to extent that:
a. Approval was required under contract, and
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR
52.242-14, Suspension of Work; however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Return of Submittals:
01 33 00 - 7
1. Return of submittals will be by CDMS response or hard copy, as applicable.
2. Action Submittals: One set of submittals required for action will be returned either approved, partially approved, approved subject to identified changes and resubmit, or not approved:
a. Submittals that are not approved shall be revised and resubmitted.
b. Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.
c. Exception: Schedules will be either accepted, partially accepted or not accepted.
3. Informational Submittals: Government will acknowledge Informational submittals:
a. Informational submittals will not be returned when they comply with specifications.
b. Informational submittals that do not comply with specifications may be returned for resubmittal or additional information may be requested.
1.07 HARD COPY OF TRANSMITTALS
A. Addresses for codes listed in Table 01 33 00A – List of Submittals:
1. Contracting Officer, Bureau of Reclamation, Attn: UC-840, 125 South State St., Room 6107, Salt Lake City, UT 84138-1147.
2. Construction Engineer, Bureau of Reclamation, 1235 La Plata Hwy, Farmington, New Mexico, 87401.
3. Technical Service Center, Bureau of Reclamation, Attn: 86-68160, PO Box
25007, Denver CO 80225-0007; Express Mail: Sixth and Kipling, Building 67, Room 152.
4. Executive Director Gallup Joint Utilities, PO Box 1270, Gallup, New Mexico, 87305.
5. Navajo Tribal Utility Authority (NTUA), Attn: Operations Manager, PO Box 1749, Shiprock, NM 87420.
B. Send original transmittal letter with appropriate number of sets to office listed in “Responsible Code” column in Table 01 33 00A – List of Submittals:
1. Responsible codes starting with “86-6” are located in the Technical Service
Center. Send these submittals to the TSC address shown above.
C. Send copy of transmittal letter with appropriate number of sets to offices that are not the responsible code but show “No. of sets to be sent to” in Table 01 33 00A – List of Submittals.
D. Provide copy of transmittal letter on CDMS.
01 33 00 - 8
E. When “No. of sets to be sent to” is 0, send a copy of transmittal letter to that office.
F. Submittals required by the specifications, but not listed in Table 01 33 00A – List of Submittals:
1. Submit in accordance with this section.
2. Submit to CE, unless otherwise specified.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
01 33 00 - 9
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility Authority, and Gallup indicates the City of Gallup New Mexico.
*** R Code indicates Responsible Code.
RSN Clause or Section Title Submittals Required Due Date or
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
1 Schedule of Values Schedule of Values for lump sum CLINs
Submitted and approved before first payment
A CO CDMS
01 14 10-1 Use of Site Land Use and Landscape Rehabilitation Plan
At least 63 days before use of site
A CE CDMS
01 31 19-1 Project Management and Coordination
Written Summary Monthly once onsite construction begins.
A CE CDMS
01 31 19-2 Project Management and Coordination
Off ROW Land Use Coordination
At least 45 days before use of OFF ROW land
I CE CDMS
01 31 19-3 Project Management and Coordination
Key Personnel Within 7 days after receipt of Notice of Award
A CE CDMS
01 31 19-4 Project Management and Coordination
Replacement of Key Personnel
A minimum of 7 business days prior to work being performed by new personnel
A CE CDMS
01 31 30-1 Contract Document Management System
Approval Data Within 21 days of Award
A CE 0 1 0 0
CDMS
01 31 30-2 Contract Document Management System
Final Data Within 14 days of completion of work
A CE 0 2 2 0
CDMS
01 32 10-1 Construction Program
Representative Information
Within 7 days after receipt of Notice of Award
I CE CDMS
01 32 10-2 Construction Program
Baseline Schedule Within 21 days after receipt of initial Notice to Proceed
A CE CDMS
01 32 10-3 Construction Program
Updated Schedule Reports
Monthly or with Progress Payments
A CE CDMS
01 33 00 - 10
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
01 32 10-4 Construction Program
Time Impact Analysis
Within 28 days after CO directs a contract change, with any proposal for a future modification, with any value engineering proposal, or with any request or claim for an equitable adjustment to the contract.
A CE CDMS
01 35 10-1 Safety Data Sheets Complete LHM and
SDS
At least 14 days before jobsite delivery of hazardous material
I CE CDMS
01 35 10-2 Safety Data Sheets Updated LHM and
SDS
At least 14 days before jobsite delivery of hazardous material not previously listed
I CE CDMS
01 35 20-1 Safety and Health Safety Program Submitted and accepted before commencing onsite work.
Submit at least 45 days before beginning onsite work. See RSHS
A CE CDMS
01 35 20-2 Safety and Health Site Inspection Weekly I CE CDMS 01 35 20-3 Safety and Health Job Hazard
Analyses At least 7 days before commencing onsite activities for each phase of work
A CE CDMS
01 35 20-4 Safety and Health Monthly Accident Summary Report
First day of each month. See
RSHS
01 33 00 - 11
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
01 35 20-5 Safety and Health Respirator Users Documentation and Records
At least 45 days before beginning onsite work
A CE CDMS
01 35 30-1 Contractor’s Onsite Safety Personnel
Resume At least 45 days before beginning onsite construction;
resubmit upon personnel change
A CE CDMS
01 35 30-2 Contractor’s Onsite Safety Personnel
Safety Inspection Reports
At least once each week
I CE CDMS
01 46 00-1 Quality Procedures Definable Features of Work List
Within 21 days after receipt of initial Notice to Proceed
A CE CDMS
01 46 00-2 Quality Procedures Contractor Quality Control (QC) Plan
At least 45 days before beginning onsite work
A CE CDMS
01 46 00-3 Quality Procedures Contractor’s Daily Report
At least once each week
I CE CDMS
01 46 00-4 Quality Procedures Quality Control Supervisor (QCS) Resume
At least 45 days before beginning onsite work.
Resubmit upon personnel change.
A CE CDMS
01 46 00-5 Quality Procedures Contractor’s Quality Testing Plan
At least 45 days before beginning onsite work
A CE CDMS
01 46 00-6 Quality Procedures Summary of Monthly Test Results
Monthly, on or before 5th day of each month
A CE CDMS
01 46 20-1 Testing Agency Services
Testing Agencies Services Plan
At least 45 days before testing is required
A CE CDMS
01 46 25-1 Special Inspections Preconstruction Submittals
At least 45 days before special inspection is required
01 33 00 - 12
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
01 46 25-2 Special Inspections Test Reports Within 1 day of special inspection completion
A CE CDMS
01 46 25-3 Special Inspections Certificates At least 45 days before special inspection is required
A CE CDMS
01 46 25-4 Special Inspections Closeout Submittals Within 14 days of completion of work
A CE CDMS
01 51 00-1 Temporary Utilities
Water Storage At least 42 days before beginning onsite construction
A CE CDMS
01 52 10-1 Field Office Delivery Schedule At least 35 days before beginning onsite work
A CE CDMS
01 55 00-1 Vehicular Access and Parking
Preconstruction Digital Recording
At least 21 days before beginning onsite work
A CE 0 1 0 0
01 55 00-2 Vehicular Access and Parking
Post-Construction and Post-Repair Digital Recording
At least 21 days before leaving site.
A CE 0 1 0 0
01 55 20-1 Traffic Control Traffic Control Plan and Permit Applications
At least 70 days before affecting public traffic.
A CE CDMS
01 55 20-2 Traffic Control Permits At least 45 days before affecting public traffic
I CE CDMS
01 56 15-1 Protection of Existing Utilities
Utility Owner Acknowledgement
At least 45 days prior to submitting pipe laying diagram and at least 45 days prior to excavation
01 33 00 - 13
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
01 56 15-2 Protection of Existing Utilities
Utility Crossing Investigation
At least 45 days prior to submitting pipe laying diagram and at least 45 days prior to excavation
A CE CDMS
01 56 15-3 Protection of Existing Utilities
Work Plan within Utility Easements
With pipe laying diagram and at least 45 days prior to excavation
A CE CDMS
01 57 20-1 Environmental Controls
Copy of Applicable Air Quality Permit
At least 14 days before beginning onsite work
I CE CDMS
01 57 20-2 Environmental Controls
Dust Control Plan At least 14 days before beginning onsite work
I CE CDMS
01 57 30-1 Water Pollution Control
Stormwater Pollution Prevention Plan (SWPPP)
At least 45 days before start of onsite construction work
A CE CDMS
01 57 30-2 Water Pollution Control
Spill Prevention, Control, and Countermeasure (SPCC) Plan
At least 45 days before delivery or storage of oil
A CE CDMS
01 57 40-1 Pesticides Pesticide Use Plan At least 45 days before application of first pesticide
A CE CDMS
01 57 50-1 Tree and Plant Protection
Protection Plan At least 45 days before beginning onsite work
A CE CDMS
01 57 90-1 Preservation of Historical and Archeological Data
Alternate Use Area or Borrow Area
At least 45 days before beginning offsite work, if commercial site;
if non-commercial site then at least 6-months prior to use of land
01 33 00 - 14
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
01 61 10-1 Buy American Buy American Certificates
Prior to project closeout
I CE CDMS
01 64 40-1 Government- Furnished Products
Shortage Report Within 2 days of inspection
I CE CDMS
01 71 20-1 Surveying Surveying Plan Within 45 days after Notice to Proceed, and approved before beginning survey work
A CE CDMS
01 71 20-2 Surveying Resumes At least 45 days before beginning survey work;
resubmit upon personnel change
I CE CDMS
01 71 20-3 Surveying Accuracy Check Results
At least 45 days before beginning survey work
I CE CDMS
01 71 20-4 Surveying Completed and Reduced Survey Notes
Weekly I CE CDMS
01 71 20-5 Surveying Original Field Survey Books
Weekly I CE CDMS
01 71 20-6 Surveying Quantity Survey Notes and Computations
Accompanying progress payment requests
I CE CDMS
01 71 20-7 Surveying Workday's Survey Notes
At conclusion of workweek
I CE CDMS
01 74 00-1 Cleaning and Waste Management
Waste Production and Disposal Plan
At least 45 days before beginning onsite work
I CE CDMS
01 74 00-2 Cleaning and Waste Management
Waste Production and Disposal Records
Within 7 days of hazardous waste disposal
I CE CDMS
01 74 00-3 Cleaning and Waste Management
Environmental Consultant Resume
At least 45 days before beginning environmental assessment
I CE CDMS
01 33 00 - 15
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment
Within 14 days of completion of work
I CE CDMS
01 78 30-1 Project Record Documents
Electronic Media Release Form, Upon Request
Accompanying request for electronic media
I CE CDMS
01 78 30-2 Project Record Documents
Progress As-Built Drawings
Monthly once onsite construction begins
A CE CDMS
01 78 30-3 Project Record Documents
Final As-Built Drawings
Within 28 days of (and no earlier than 60 days prior to) Government issued substantial completion of work
A CE CDMS
01 78 30-4 Project Record Documents
Draft O&M Manual Within 28 days of Government issued substantial completion of work
A CE CDMS
0 2 2 2
01 78 30-5 Project Record Documents
Final Drawings Within 14 days of approval of
RSN 01 78 30-3
A CE CDMS
0 2 0 2
01 78 30-6 Project Record Documents
Final O&M Manuals
Within 14 days of approval of
RSN 01 78 30-4
A CE CDMS
0 2 2 2
01 80 15-1 Commissioning Qualifications Within 150 days after Notice to Proceed
A CE CDMS
01 80 15-2 Commissioning Test Plan At least 60 days prior to commissioning and no earlier than 120 days prior to commissioning
01 33 00 - 16
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
01 80 15-3 Commissioning Testing Procedures At least 60 days prior to commissioning and no earlier than 120 days prior to commissioning
I CE CDMS
01 80 15-4 Commissioning Test Reports Within 7 days of completing each test
I CE CDMS
01 80 15-5 Commissioning Discrepancy and Corrections List
Within 7 days of completing each test
I CE CDMS
01 80 15-6 Commissioning Post-Testing and Commissioning Documentation
Within 60 days of completing commissioning
A CE CDMS
03 11 10-1 Concrete Forming Formwork Design and Drawings
45-days before placing concrete
A CE CDMS
03 20 00-1 Concrete Reinforcing
Reinforcement Diagrams and Lists
45-days before placing concrete
A CE CDMS
03 20 60-1 Concrete Anchors Instructions 45-days before installation of anchors
I CE CDMS
03 20 60-2 Concrete Anchors Test Data and Results
Within 7 days of completing each test
I CE CDMS
03 30 00-1 Cast-in Place Concrete
Approval Data
At least 45-days before placing concrete
A 86-68530 CDMS
03 30 00-2 Cast-in Place
Concrete Placement Schedule
At least 45-days before placing concrete
A CE CDMS
03 30 00-3 Cast-in Place
Certifications concrete
A CE CDMS
03 30 00-4 Cast-in Place
Test Reports
Monthly A CE CDMS
01 33 00 - 17
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
03 35 10-1 Concrete Floor Hardener
Manufacturer's Instructions concrete
A CE CDMS
03 48 00-1 Plant-Precast Concrete Structures
Certificates before installing first structure
A 86-68120 CDMS
03 48 00-2 Plant-Precast Concrete Structures
Shop Drawings concrete
A 86-68120 CDMS
03 48 00-3 Plant-Precast Concrete Structures
Product Data and concrete
A 86-68120 CDMS
03 62 20-1 Nonshrink Grout for Equipment and Metalwork
Packaged Nonshrink Grout Data
At least 45-days before placing concrete
A 86-68530 CDMS
03 63 00-1 Epoxy Grout Approval Data before beginning grouting
A 86-68530 CDMS
04 22 10-1 Reinforced Concrete Unit Masonry Assemblies
Approval Data, Certifications, and Mix Design
At least 45-days before beginning construction of the wall
A 86-68120 CDMS
04 22 10-2 Reinforced Concrete Unit Masonry Assemblies
Sample Kit construction of the wall
I 86-68120 CDMS (Transmittal letter)
0 1 1 0
04 22 10-3 Reinforced Concrete Unit Masonry Assemblies construction of the wall
A 86-68120 CDMS
05 12 10-1 Structural Steel Qualifications
At least 90-days framing
A 86-68120 CDMS
05 12 10-2 Structural Steel Dimensional framing
01 33 00 - 18
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
05 12 10-3 Structural Steel Approval Drawings and Data
At least 90-days before installing framing
A 86-68120 CDMS
05 12 10-4 Structural Steel Test Reports At least 90-days before beginning work
A 86-68120 CDMS
05 12 10-5 Structural Steel Weld Inspection Reports framing
A 86-68120 CDMS
05 12 10-6 Structural Steel Final Drawings and Data framing
A 86-68120 CDMS
05 12 10-7 Structural Steel AISC “Quality Certified Fabricator” Certificate
At least 90-days before installing framing
A 86-68120 CDMS
05 40 00-1 Cold-Formed Metal framing
Approval Drawings and Data framing
A 86-68120 CDMS
05 40 00-2 Cold-Formed Metal framing
Certifications framing
A 86-68120 CDMS
05 40 00-3 Cold-Formed Metal framing
Erection Plans and Manual framing
A 86-68120 CDMS
05 51 30-1 Metal Ladders Shop Drawings and Product Data framing
A 86-68120 CDMS
05 52 20-1 Fall Protection Rail System
Approval Drawings and Data
At least 45-days before beginning work on rail system
A 86-68120 CDMS
05 52 20-2 Fall Protection Rail System before end of construction
A 86-68120 CDMS
05 52 20-3 Fall Protection Rail System
Operation and Maintenance before payment
01 33 00 - 19
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
06 82 10-1 Fiberglass Reinforced Plastic (FRP) Fabrications
Commercial Product Data onsite work
A 86-68120 CDMS
06 82 10-2 Fiberglass Reinforced Plastic (FRP) Fabrications onsite work
A 86-68120 CDMS
07 19 20-1 Silane Water Repellant before applying repellent
I 86-68120 CDMS
07 19 20-2 Silane Water repellent
I 86-68120 CDMS
07 19 20-3 Silane Water
Documentation repellent
I 86-68120 CDMS
07 21 13-1 Sound Control Batt Insulation insulation
A 86-68120 CDMS
07 21 13-2 Sound Control Batt insulation
I 86-68120 CDMS
07 21 20-1 Extruded Polystyrene Foam onsite work
A 86-68120 CDMS
07 21 50-1 Spray Applied Polyurethane Foam insulation
01 33 00 - 20
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
07 21 50-2 Spray Applied Polyurethane Foam insulation
A 86-68120 CDMS
07 21 50-3 Spray Applied Polyurethane Foam insulation
A 86-68120 CDMS
07 41 13-1 Insulated Metal Roof Panels
Sample and Color panels
A CE CDMS (Transmittal letter)
0 1 1 0
07 41 13-2 Insulated Metal Roof Panels
Qualifications At least 45-days
07 41 13-3 Insulated Metal Roof Panels
07 41 13-4 Insulated Metal Roof Panels
Closeout Maintenance Data
Within 14-days of completion of onsite work
07 42 13-1 Insulated Metal Wall Panels
Sample and Color panels
A CE CDMS (Transmittal letter)
0 1 1 0
07 42 13-2 Insulated Metal Wall Panels
Qualifications At least 45-days before installing panels
A 86-68120 CDMS
07 42 13-3 Insulated Metal Wall Panels panels
A 86-68120 CDMS
07 42 13-4 Insulated Metal Wall Panels
Closeout Maintenance Data of installing
01 33 00 - 21
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
07 72 30-1 Roof Hatches Product Data and
07 92 00-1 Joint Sealants and Masonry Joints
Approval Data and Color Samples
At least 45-days before installing joint
A CE CDMS (Transmittal letter)
0 1 1 1
07 92 00-2 Joint Sealants and Masonry Joints joint
A 86-68120 CDMS
08 11 10-1 Steel Doors and Frames doors
A 86-68120 CDMS
08 11 10-2 Steel Doors and Frames doors
A 86-68120 CDMS
08 31 25-1 Floor Access Hatches panels
A 86-68120 CDMS
08 33 20-1 Roll up Doors Approval Drawings and Data
At least 45-days before installing doors
A 86-68120 CDMS
08 33 20-2 Roll up Doors Sample and Color doors
A CE CDMS (Transmittal letter)
0 1 1 0
08 33 20-3 Roll up Doors Certification At least 45-days before installing doors
08 33 20-4 Roll up Doors
Instructions At same time as equipment is shipped
I 86-68120 CDMS
08 41 10-1 Aluminum Framed Entrances and Storefronts
At least 45-days
01 33 00 - 22
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
08 41 10-2 Aluminum Framed Entrances and Storefronts
Approval Sample Kits
At least 45-days before ordering
A CE CDMS
0 1 1 1
08 41 10-3 Aluminum Framed Entrances and Storefronts
Shipping Confirmation
At least 45-days before installing
A CE CDMS
08 41 10-4 Aluminum Framed Entrances and Storefronts
Certifications At least 45-days before installing
A CE CDMS
08 41 10-5 Aluminum Framed
Instructions At least 45-days
A CE CDMS
08 41 10-6 Aluminum Framed
Documentation At least 45-days
A CE CDMS
08 45 13-1 Structured- Polycarbonate Panel Assemblies
A CDMS
08 71 00-1 Door Hardware Hardware Schedule and Approval Data
At least 45-days before installing hardware
A 86-68120 CDMS
08 71 00-2 Door Hardware Instructions At least 45-days before installing hardware
09 29 00-1 Gypsum Board Approval Data gypsum board
A 86-68120 CDMS
09 65 10-1 Rubber Wall Base Approval Data and Color Sample Kit
At least 45-days before installing wall base
A CE CDMS
0 1 1 0
09 65 10-2 Rubber Wall Base Instructions wall base
I 86-68120 CDMS
09 96 20-1 Coatings Approval Data coating work
01 33 00 - 23
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
09 96 20-2 Coatings Final Approval Data coating work
09 96 20-3 Coatings Paint Chip Samples coating work
A CE CDMS (Transmittal letter)
0 1 1 0
09 96 20-4 Coatings Qualifications coating work
A 86-68530
/ CE
CDMS
09 96 20-5 Coatings Quality Control Plan
At least 45-days before beginning coating work
A 86-68530 CDMS
09 96 20-6 Coatings Contractor Quality Testing Report
At least 14-days after completion of test
A 86-68530 CDMS
10 14 00-1 Signage Shop Drawings and Approval Data
At least 45-days before beginning coating work
10 44 20-1 Fire Extinguishers Approval Data before procurement
A 86-68410 CDMS
10 44 20-2 Fire Extinguishers Maintenance Data procurement
A 86-68120 CDMS
13 34 21-1 Metal Building System
Approval Drawings and Data
At least 90-days before procurement
A 86-68120 CDMS
13 34 21-2 Metal Building
Certification
At least 90days procurement
A 86-68120 CDMS
13 34 21-3 Metal Building
Design Data procurement
A 86-68120 CDMS
13 34 21-4 Metal Building System
Anchorage Design procurement
01 33 00 - 24
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
13 34 21-5 Metal Building System
Erection Plans, Manual, and procurement
A 86-68120 CDMS
13 34 21-6 Metal Building System
Fabricator Qualifications procurement
A 86-68120 CDMS
21 13 13-1 Automatic Fire Sprinkler Systems
Approval Drawings and Data
At least 45-days before
21 13 13-2 Automatic Fire Sprinkler Systems
Test Plan after completing installation and testing
I 86-68410 CDMS
21 13 13-3 Automatic Fire Sprinkler Systems
Final Drawings and
At Commissioning
A 86-68410 CDMS
21 13 13-4 Automatic Fire Sprinkler Systems
At Commissioning
I 86-68410 CDMS
21 15 00-1 Hybrid Water Mist Fire Suppression procurement
A 86-68410 CDMS
21 15 00-2 Hybrid Water Mist Fire Suppression System procurement
A 86-68410 CDMS
21 15 00-3 Hybrid Water Mist Fire Suppression
Test Plan procurement
A 86-68410 CDMS
21 15 00-4 Hybrid Water Mist Fire Suppression
Final Drawings installation and testing
01 33 00 - 25
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates Navajo Tribal Utility
Delivery Time Type
R Code
No. of sets to be sent to:
CO CE TSC Gallup/
NTUA
21 15 00-5 Hybrid Water Mist Fire Suppression System
Operation and procurement
A 86-68410 CDMS
21 15 00-6 Hybrid Water Mist Fire Suppression System
Delivery of Extra Materials procurement
A 86-68410 CDMS
21 15 00-7 Hybrid Water Mist Fire Suppression System
Training Notification installation and testing
A 86-68410 CDMS
22 13 16-1 Plant Piping…