Attachment_2-00_00_50_-_Section_B_Rev_8-2-2024_0004.pdf
PDF 150 KB Posted
- Attached to
- RG- EBHD UTILITY REHAB Federal contract opportunity
- Solicitation number
- 140R4024R0014
About this file
This document is a Price Schedule for the Elephant Butte Historic District - Utilities Replacement Rio Grande Project in New Mexico, Solicitation No. 140R4024R0014. It lists the Contract Line Item Numbers (CLINs) and corresponding supplies or services required, with estimated quantities and unit prices.
The solicitation is issued by the Department of the Interior Bureau of Reclamation. Price Schedule A includes line items for mobilization, document management, electrical work, concrete, demolition, electrical vehicle chargers, excavation, pipe installation, road work, and a communications system. Price Schedule B is an option CLIN for the removal and replacement of existing tanks. The Government will award Price Schedule A at the time of contract award, and may exercise the option for Price Schedule B within 21 days of Notice to Proceed. Estimated quantities are provided for comparison purposes only, and the contract clause for variation in estimated quantity applies. New Mexico gross receipts tax is included in the total evaluated price for both schedules.
View the file
Other files for this federal contract opportunity
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Elephant Butte Historic District – Utilities Replacement Rio Grande Project, New Mexico Solicitation No. 140R4024R0014
Price Schedule B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
ELEPHANT BUTTE HISTORIC DISTRICT – UTILITIES REPLACEMENT
RIO GRANDE PROJECT, NEW MEXICO
B.1 PRICE SCHEDULE
(a) Proposals will be considered for award on the following Price Schedules, but no proposal will be considered for award on only a part of the Price Schedules.
(b) Proposals are subject to the terms and conditions of this solicitation.
(c) The Government will award Price Schedule A at time of award. Price Schedule B is for an option CLIN that the Government may exercise at contract award or within 21 days of Notice to Proceed.
(d) Quantities in the Price Schedule are estimated quantities for comparison of proposals only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(e) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, Alternate 1, for Item 1.
(f) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE A
CLIN
00010
ITEMS Section Supplies or Services Quantity and Unit
Unit Price
Amount
A-1 WBR
1452.232-
Mobilization and Preparatory Work
For the lump sum of $
A-2 01 31 30 Contract Document Management System
For the lump sum of $
A-3 01 33 26 Electrical Drawings and Data
For the lump sum of $
B - 2
ITEMS Section Supplies or Services Quantity and Unit
Unit Price
Amount
A-4 01 78 30 Final As-built Drawings For the lump sum of 1% of Total Proposal
A-5 03 30 00 Cast-In-Place Concrete 13 yd3 $ $ A-6 05 50 00 Guard Posts 25 ea $ $ A-7 26 05 02 Complete Electrical
System For the lump sum of $
A-8 26 05 04 Demolition and Removal of Existing Overhead Electrical Lines and Poles
For the lump sum of $
A-9 26 60 20 DC Electric Vehicle 50kW Chargers
2 EA $ $
A-10 26 60 30 Electrical Pedestals 25 EA $ $ A-11 31 02 10 Water for Dust
Abatement 15 MGal $ $
A-12 31 03 33 Removal of Water For the lump sum of $ A-13 31 11 00 Clearing and Grubbing 8 Acres $ $ A-14 31 14 10 Stripping 175 yd3 $ $ A-15 31 23 11 Common Excavation for
Structures 49 yd3 $ $
A-16 31 23 11 Rock Excavation for Structures
10 yd3 $ $
A-17 31 23 11 Compacting Backfill about Structures
1661 yd3 $ $
A-18 31 23 22 Excavation for Pipe Trenches
7012 yd3 $ $
A-19 31 23 22 Rock Excavation for Pipe Trenches
70 yd3 $ $
A-20 31 23 22 Compacting Backfill in Pipe Trenches
4861 yd3 $ $
A-21 31 23 22 Mobilization of Trench Box
A-22 31 23 22 Use of Trench Box 4710 Lin ft $ $
B - 3
ITEMS Section Supplies or Services Quantity and Unit
Unit Price
Amount
A-23 31 23 70 Controlled Low Strength Material
10 yd3 $ $
A-24 32 15 10 Paved Road Crossing 7342 yd2 $ $ A-25 32 15 10 Gravel Surfacing 893 Tons $ $ A-26 32 91 20 Placing Topsoil For the lump sum of $ A-27 33 11 10 Water Line Pipe – ¾-inch
Copper Water Supply Piping and Tubing
950 Lin ft $ $
A-28 33 11 10 Water Line Pipe – 2-inch PVC Pressure Pipe
250 Lin ft $ $
A-29 33 11 10 Water Line Pipe – 4-inch PVC Pressure Pipe
150 Lin ft $ $
A-30 33 11 10 Water Line Pipe – 6-inch PVC Pressure Pipe
11587 Lin ft
A-31 33 11 10 Water Line Pipe – 1-inch HDPE Pressure Pipe
720 Lin ft $ $
A-32 33 11 10 Sewer Line Pipe – 8SDR25 PVC Pressure Pipe
6440 Lin ft $ $
A-33 33 11 10 Filling, Testing and Draining Pipeline
For the lump sum of $
A-34 33 11 10 Repair Kits For the lump sum of $ A-35 33 11 22 Thrust Restraints for
PVC Pipe 19 yd3 $ $
A-36 33 11 22 Mechanically Restrained Joints
42 EA $ $
A-37 33 11 22 Fire Hydrants 5 EA $ $ A-38 33 11 22 Gate Valves 58 EA $ $ A-39 33 11 22 Valve Boxes 60 EA $ $ A-40 33 11 22 Air Release Valves
(ARV)
3 EA $ $
B - 4
ITEMS Section Supplies or Services Quantity and Unit
Unit Price
Amount
A-41 33 11 22 Water Pump 2 EA $ $ A-42 33 11 22 Water Hydrants 24 EA $ $ A-43 33 11 22 Water Meter 2 EA $ $ A-44 33 82 23 Complete
Communications System
SUBTOTAL FOR PRICE SCHEDULE A $
NEW MEXICO GROSS RECEIPTS TAX (Estimated at 8.3750% of subtotal) $
TOTAL FOR PRICE SCHEDULE A $
OPTION PRICE SCHEDULE B
00020
ITEMS Section Supplies or Services Quantity and Unit
Unit Price
Amount
B-1 33 16 20 Removal of Existing Tanks 3 EA $ $ B-2 33 16 20 Steel Tanks 2 EA $ $ B-3 33 16 20 Ring Foundation 150 Yd3 $ $ B-4 33 16 20 Tank Disinfection 2 EA $ $
SUBTOTAL FOR PRICE SCHEDULE B $
NEW MEXICO GROSS RECEIPTS TAX (Estimated at 8.3750% of subtotal) $
TOTAL FOR PRICE SCHEDULE B $
TOTAL EVALUATED PRICE FOR PRICE SCHEDULES A and B $
END OF SUPPLIES OR SERVICES AND PRICES
File details come from the government source that posted it. Updated .