Attachment_1-UPDATED_PRICE_SCHEDULE_Excel_8-2-2024-EBHD_Utility_Rehab_0004.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- RG- EBHD UTILITY REHAB
- Solicitation number
- 140R4024R0014
About this file
This document is a Price Schedule for the Department of the Interior Bureau of Reclamation's solicitation for the EBHD Utility Rehabilitation project, solicitation number 140R4024R0014. The Price Schedule contains line items for various construction and utility-related work, including site preparation, excavation, piping, valves, tanks, and communications systems. The total evaluated price for Price Schedules A and B is provided. The Government will award Price Schedule A at time of contract award, and Price Schedule B is an option CLIN that may be exercised. Quantities listed are estimated for proposal comparison purposes only. The contract has a 1% as-built drawing requirement. The solicitation is for a firm-fixed price contract.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
| 140R4024R0014 - EBHD Utility Rehab |
| PRICE SCHEDULE |
| (a) | Proposals will be considered for award on the following Price Schedules, but no proposal will be considered for award on only a part of the Price Schedules. |
| (b) | Proposals are subject to the terms and conditions of this solicitation. |
| (c) | The Government will award Price Schedule A at time of award. Price Schedule B is for an option CLIN that the Government may exercise at contract award or within 21 days of Notice to Proceed. |
| (d) | Quantities in the Price Schedule are estimated quantities for comparison of proposals only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items. |
| (e) | See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, Alternate 1, for Item 1. |
| (f) | Definitions: (1) CLIN - Contract Line Number |
| PRICE SCHEDULE A | ||||
| CLIN | ||||
| 00010 | ITEMS | Section | Supplies or Services | Quantity |
| and Unit | Unit Price | Amount |
| A-1 | WBR 1452.232-81 | Mobilization and Preparatory Work | For the lump Sum of | $ | ||
| A-2 | 01 31 30 | Contract Document Management System | For the lump Sum of | $ | ||
| A-3 | 01 33 26 | Electrical Drawings and Data | For the lump Sum of | $ | ||
| A-4 | 01 78 30 | Final As-built Drawings | For the lump sum of 1% of Total Proposal | $ | ||
| A-5 | 03 30 00 | Cast-In-Place Concrete | 13 yd3 | $ | $ | |
| A-6 | 05 50 00 | Guard Posts | 25 EA | $ | $ | |
| A-7 | 26 05 02 | Complete Electrical System | For the lump Sum of | $ | ||
| A-8 | 26 05 04 | Demolition and Removal of Existing Overhead Electrical Lines and Poles | For the lump Sum of | $ | ||
| A-9 | 26 60 20 | DC Electric Vehicle 50kW Chargers | 2 EA | $ | $ | |
| A-10 | 26 60 30 | Electrical Pedestals | 25 EA | $ | $ | |
| A-11 | 31 02 10 | Water for Dust Abatement | 15 Mgal | $ | $ | |
| A-12 | 31 03 33 | Removal of Water | For the lump Sum of | $ | ||
| A-13 | 31 11 00 | Clearing and Grubbing | 8 Acres | $ | $ | |
| A-14 | 31 14 10 | Stripping | 175 yd3 | $ | $ | |
| A-15 | 31 23 11 | Common Excavation for Structures | 49 yd3 | $ | $ | |
| A-16 | 31 23 11 | Rock Excavation for Structures | 10 yd3 | $ | $ | |
| A-17 | 31 23 11 | Compacting Backfill about Structures | 1661 yd3 | $ | $ | |
| A-18 | 31 23 22 | Excavation for Pipe Trenches | 7012 yd3 | $ | $ | |
| A-19 | 31 23 22 | Rock Excavation for Pipe Trenches | 70 yd³ | $ | $ | |
| A-20 | 31 23 22 | Compacting Backfill in Pipe Trenches | 4861 yd3 | $ | $ | |
| A-21 | 31 23 22 | Mobilization of Trench Box | For the lump Sum of | $ | ||
| A-22 | 31 23 22 | Use of Trench Box | 4710 Lin ft | $ | $ | |
| A-23 | 31 23 70 | Controlled Low Strength Material | 10 yd3 | $ | $ | |
| A-24 | 32 15 10 | Paved Road Crossing | 7342 yd2 | $ | $ | |
| A-25 | 32 15 10 | Gravel Surfacing | 893 Tons | $ | $ | |
| A-26 | 32 91 20 | Placing Topsoil | For the lump sum of | $ | ||
| A-27 | 33 11 10 | Water Line Pipe – ¾-inch Copper Water Supply Piping and Tubing | 950 Lin ft | $ | $ | |
| A-28 | 33 11 10 | Water Line Pipe – 2-inch PVC Pressure Pipe | 250 Lin ft | $ | $ | |
| A-29 | 33 11 10 | Water Line Pipe – 4-inch PVC Pressure Pipe | 150 Lin ft | $ | $ | |
| A-30 | 33 11 10 | Water Line Pipe – 6-inch PVC Pressure Pipe | 11587 Lin ft | $ | $ | |
| A-31 | 33 11 10 | Water Line Pipe – 1-inch HDPE Pressure Pipe | 720 Lin ft | $ | $ | |
| A-32 | 33 11 10 | Sewer Line Pipe – 8SDR25 PVC Pressure Pipe | 6440 Lin ft | $ | $ | |
| A-33 | 33 11 10 | Filling, Testing and Draining Pipeline | For the lump sum of | $ | ||
| A-34 | 33 11 10 | Repair Kits | For the lump sum of | $ | ||
| A-35 | 33 11 22 | Thrust Restraints for PVC Pipe | 19 yd3 | $ | $ | |
| A-36 | 33 11 22 | Mechanically Restrained Joints | 42 EA | $ | $ | |
| A-37 | 33 11 22 | Fire Hydrants | 5 EA | $ | $ | |
| A-38 | 33 11 22 | Gate Valves | 58 EA | $ | $ | |
| A-39 | 33 11 22 | Valve Boxes | 60 EA | $ | $ | |
| A-40 | 33 11 22 | Air Release Valves (ARV) | 3 EA | $ | $ | |
| A-41 | 33 11 22 | Water Pump | 2 EA | $ | $ | |
| A-42 | 33 11 22 | Water Hydrants | 24 EA | $ | $ | |
| A-43 | 33 11 22 | Water Meter | 2 EA | $ | $ | |
| A-44 | 33 82 23 | Complete Communications System | For the lump sum of | $ | ||
| Subtotal for Price Schedule A | $ | |||||
| New Mexico Gross Receipts Tax (Estimated at 8.3750% of Subtotal) | $ | |||||
| TOTAL PRICE FOR PRICE SCHEDULE A | $ |
| OPTION PRICE SCHEDULE B | ||||
| CLIN | ||||
| 00010 | ITEMS | Section | Supplies or Services | Quantity |
| and Unit | Unit Price | Amount |
| B-1 | 33 16 20 | Removal of Existing Tanks | 3 EA | $ | $ | |
| B-2 | 33 16 20 | Steel Tanks | 2 EA | $ | $ | |
| B-3 | 33 16 20 | Ring Foundation | 150 Yd3 | $ | $ | |
| B-4 | 33 16 20 | Tank Disinfection | 2 EA | $ | $ | |
| Subtotal for Price Schedule B | $ | |||||
| New Mexico Gross Receipts Tax (Estimated at 8.3750% of Subtotal) | $ | |||||
| TOTAL PRICE FOR PRICE SCHEDULE B | $ |
| TOTAL EVALUATED PRICE FOR PRICE SCHEDULES A and B | Amount |
| $ |
File details come from the government source that posted it. Updated .