This document is an amendment to a solicitation for the Bureau of Reclamation's requirement to provide new station service switchgear, relays, switchboards, power generators, and other equipment for the Flaming Gorge and Fontenelle Power Plants. The amendment provides additional questions and answers regarding the solicitation requirements. Specifically, it clarifies that standard switchgear with arc-quenching devices will meet the specifications, and provides general floor plans for the power plant locations. The amendment also extends the deadline for question submissions to September 6th. The total small business set-aside contract will be awarded on a firm-fixed price basis for work to be completed between December 2022 and December 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| additional_0002.pdf | ||
| 52_00_00_-_Drawings_0002.pdf | ||
| Sol_140R4022R0009_Amd_0002.pdf | ||
| 26_20_10_-_Temporary_Power_Equipment_8_24_0002.pdf | ||
| Site_meeting_attnedance_FG_FL_0001.pdf | ||
| Sol_140R4022R0009_Amd_0001.pdf | ||
| ATT_3_wage_determination_UT20220079__WY20220029.pdf | ||
| ATT_5_BID_BOND_SF24.pdf | ||
| ATT_2_FG_-_FL_Station_Service_Replacement__Drawings_06302020.pdf | ||
| ATT_1_00_00_01_Specifications.pdf | ||
| Sol_140R4022R0009.pdf | ||
| ATT_4_Sub_Worksheet.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R4022R0009 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Salt Lake City UT 84138
R40
125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation
06/29/20220003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/29/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The magnitude of construction for this project in accordance with 36.204 is between $1,000,000.00 and $5,000,000.00. This is a total small business set aside under NAICS Code 237130 which has a size standard of $39.5 Million. The solicitation and resulting award will be conducted in accordance with FAR 15 and 36. The solicitation point of contact is Lisa Laughbon
801-524-3732 llaughbon@usbr.gov
The purpose of this amendment is to answer too additional questions that were missed on
Amendment 0002.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Lisa Laughbon
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R4022R0009/0003
1-Can the USBR provide clarification if standard switchgear with the specified arc-quenching devices will be acceptable?
ANSWER: Arc-quenching devices are required per Section 26 16 14, 2.01, B. These are acceptable to meet the IEEE C37.20.7 standard requirements.
2-Can the USBR please provide drawings of the building sections, and floor plans for both
Flaming Gorge and Fontenelle?
ANSWER: The drawing for the general floor arrangements for Flaming Gorge and Fontenelle were include in the additional drawings in amendment 0002.
The time for submitting question is hereby extended until Tuesday September 6, at 1200 hours
MD.
All other terms and conditions remain the same.
Period of Performance: 12/01/2022 to 12/30/2024