Site_meeting_attnedance_FG_FL_0001.pdf
PDF 41 KB Posted
- Attached to
- FG STATION SERVICE SWITCHGEAR UPGRADE Federal contract opportunity
- Solicitation number
- 140R4022R0009
About this file
This document contains a meeting sign-in sheet and a related federal contract opportunity notice. The meeting sign-in sheet documents attendance at a meeting on July 13-14, 2022 in Flaming Gorge and Fontenelle to discuss the FG/FL Station Service Replacement project. The federal contract opportunity is a competitive firm fixed price construction solicitation for new station service switchgear, relays, switchboards, power generators and other equipment for the Flaming Gorge and Fontenelle Power Plants. The requirement is being procured as a total small business set aside in accordance with FAR Part 36 and Part 15. Offerors must have sufficient bonding capacity to provide payment and performance bonds for 100% of the contract price. The solicitation will be issued by the Bureau of Reclamation within the Department of the Interior.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R4022R0009_Amd_0003.pdf | ||
| additional_0002.pdf | ||
| 52_00_00_-_Drawings_0002.pdf | ||
| Sol_140R4022R0009_Amd_0002.pdf | ||
| 26_20_10_-_Temporary_Power_Equipment_8_24_0002.pdf | ||
| Sol_140R4022R0009_Amd_0001.pdf | ||
| ATT_5_BID_BOND_SF24.pdf | ||
| ATT_2_FG_-_FL_Station_Service_Replacement__Drawings_06302020.pdf | ||
| ATT_1_00_00_01_Specifications.pdf | ||
| Sol_140R4022R0009.pdf | ||
| ATT_3_wage_determination_UT20220079__WY20220029.pdf | ||
| ATT_4_Sub_Worksheet.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEETING SIGN-IN SHEET
Project: FG/ FL Station Service Replacement Meeting Date: 7/13-7/14 2022
Facilitator: Lisa Laughbon Place/Room: Flaming Gorge / Fontenelle
Name Title Company Phone E-Mail Fontenelle
Kyle Clauch BD Power Gen Controls 713 504 0823 kclauch@powergencontrols.com X
Luis Sanchez Applications Engineer Power Gen Controls 832 800 7832 lsanchez@powergencontrols.com X
Tim Buss Design. Sales /GOV Enercon 309 339 6931 tbuss@enerconpower.com X
Michael Clay PM General JRock Construction 801 891 7610 michaelc@jrockconstruction.com X
Casper Radmer Control Engineer PSE Engineering X
Nick Morse Superintendent S&S Electric 801 891 1324 nick@sscutah.co
Rory Sower? President S&S Electric 801 369 3754 rory@sseutah.com
Kirby Degraw VP Sage Electric 307 679 8202 kirby@sageele.com X
Clinton Muncy President Gardner Zemke 575 491 1379 cmuncy@gardnerzemke.com X
Mike Frandsen Estimator SCI Automation 435 823 6382 mfrandsen@sciautomation.net X
File details come from the government source that posted it. Updated .