This Request for Proposals (RFP) is for a Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract for Rockfall Mitigation at Hoover Dam issued by the Bureau of Reclamation, U.S. Department of the Interior. The solicitation is a total small business set-aside with a NAICS code of 237990 and a small business size standard of $45 million. The government intends to award three contracts with a five-year ordering period and a cumulative maximum value of $5,000,000, with individual task orders estimated between $500,000 and $1,000,000. The first task order will be awarded simultaneously with the IDIQ contracts and will be awarded to the lowest-priced offeror within the selected pool of contractors.
The scope of work involves rock stabilization and hazard mitigation on steep rock slopes, including techniques such as scaling, cleaning, bolting, cabling, meshing, and other methods to improve rock slope stability at Hoover Dam and potentially other facilities. Offerors will be evaluated on four factors: Relevant Experience, Past Performance, Technical Capability, and Price, with the non-price factors considered approximately equal to price. The government will evaluate proposals without discussions and expects offerors to submit their most favorable initial terms. Proposals must include detailed information about similar past projects, rope access technician certifications, equipment capabilities, and pricing schedules.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140R3025R0014
Contract No. TBD
Total Small Business Set Aside
Rockfall Mitigation Hoover Dam - Multiple-Award Indefinite Delivery / Indefinite
Quantity (IDIQ) for Hoover Dam
U.S. Department of the Interior Bureau of Reclamation
Interior Region 8: Lower Colorado Basin
This page intentionally left blank.
FORWARD Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover Dam IDIQ
FOREWORD
The Bureau of Reclamation (Reclamation) has a requirement for rock stabilization on the steep rock slopes within the Lower Colorado Region Hoover Dam and possibly other facilities in various locations. The contractor will be required to provide assistance to Reclamation performing rockfall hazard mitigation include scaling, cleaning, bolting, cabling, meshing, and other methods to improve the stability of the rock. The contractor will be responsible for providing all personnel, materials, tools, equipment, and expertise to stabilize the rock slopes designated by Reclamation.
This acquisition is being procured under Federal Acquisition Regulations Part 15, Contracting by
Negotiation and Part 36 Construction and Architect-Engineer Contracts. Offerors are cautioned to carefully review the offer submission requirements contained in Section L and the evaluation criteria and standards contained in Section M. The Government intends to award contracts without discussion with Offerors. The award decision will be based on the Offeror’s initial proposal. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a technical and cost or price standpoint. Reference provisions in Section L that include General, Technical and Pricing Proposal Instructions and Section M for the Evaluation Factors for Award
Solicitation/contract subject to the FAR, current through Federal Acquisition Circulars (FAC)
2025-04, effective date June 11, 2025.
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Agencies will not consider or use these representations. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
MULTIPLE AWARD: The Government intends to make three awards under this indefinite delivery, indefinite quantity (IDIQ) solicitation, but reserves the right to award more, less, or none at all.
IDIQ VALUE: The proposed IDIQ contract(s) will be for an ordering period of five years from the date of contract award with the cumulative/maximum amount of all task orders not exceeding
$5,000,000.00. The minimum order guarantee is $2,500.00 per contract. The Government does not guarantee an awardee will receive more than the contract’s minimum guarantee. There is no guarantee that the maximum contract value will be distributed equally among the pool of contractors as the total values will be determined through a competitive delivery/task order award process. Task order procedures are identified in F.5 Task Order Issuance Procedures.
TASK ORDER 1: The Government anticipates that Task Order 1 for Schedule 1 Rockfall Risk
Mitigation at Hoover Dam will be awarded at the time of award of IDIQ contract(s).
FORWARD Solicitation No.
Project Title
Rockfall Mitigation Hoover
SITE VISIT: A site visit will be held prior to the proposal due date which will allow offerors to walk the site where construction will take place. Reference Section L.6, Site Visit
(Construction). Please contact Bryan Williamson at bwilliamson@usbr.gov and Luis Gallardo lgallardo@usbr.gov, if you plan to attend.
WRITTEN QUESTIONS: Reclamation will only accept written questions for this solicitation.
Please submit all written questions pertaining to this solicitation to Bryan Williamson, email bwilliamson@usbr.gov and Luis Gallardo lgallardo@usbr.gov no later than July 30, 2025 4:00 pm
MT. The subject line shall clearly reference the Solicitation Number associated with this solicitation. No questions will be entertained after this date.
OFFER SUBMISSION: For date and place of receipt of proposals see Contract Form -
Solicitation, Offer, and Award (Construction, Alteration or Repair) SF-1442.
For information regarding Bureau of Reclamation’s publication “Reclamation Safety and Health
Standards" (2009 Edition as revised, with revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html ) which is applicable to work to be performed, see clause WBR 1452.223-81 Safety and Health.
mailto:bwilliamson@usbr.gov mailto:lgallardo@usbr.gov mailto:bwilliamson@usbr.gov mailto:lgallardo@usbr.gov http://www.usbr.gov/ssle/safety/RSHS/rshs.html
TABLE OF CONTENTS Solicitation No.
Project Title
Rockfall Mitigation Hoover i
TABLE OF CONTENTS
FOREWORD
TABLE OF CONTENTS i-iii
PART I – THE SCHEDULE
SECTION A – Solicitation/Contract Form - SF-1442 A-1
SECTION B - Supplies or Services and Prices/Costs
B.1 The Requirement B-1
B.2 Contract Price Schedule B-1
SECTION C – Descriptions and Specifications C-1
C.1 Description/Specifications/Statement of Work C-1
SECTION D - Packaging and Marking – Not applicable. D-1
SECTION E - Inspection and Acceptance E-1
E.1 52.252-2 Clauses Incorporated by Reference E-1
SECTION F - Deliveries or Performance F-1
F.1 52.252-2 Clauses Incorporated by Reference F-1
F.2 52.211-10 Commencement, Prosecution, and Completion of Work F-1
F.3 Contract Ordering Period F-1
F.4 Delivery Information F-1
F.5 Task Order Issuance Procedures F-2
F.6 Task Order Performance Periods F-4
SECTION G - Contract Administration Data G-1
G.1 1452.201-70 Authorities and Delegations G-1
G.2 1452.242-80 Postaward Conference G-2
G.3 Contractor’s Administration Personnel G-2
G.4 DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Internet Payment Platform (IPP)
G-2
SECTION H - Special Contract Requirements H-1
H.1 DOI-AAAP-0050 Notice of Contractor-Contractor Performance Assessment Reporting System
H-1
H.2 Bonding Requirement H-2
PART II - CONTRACT CLAUSES
SECTION I - Contract Clauses I-1
I.1 52.252-2 Clauses Incorporated by Reference I-1
I.2 52.204-21 Basic Safeguarding of Covered Contractor Information Systems I-3
I.3 52.216-18 Ordering I-4
I.4 52.216-19 Order Limitations I-5
I.5 52.216-22 Indefinite Quantity I-5
I.6 52.219-14 Limitation on Subcontracting – Deviation I-6
Project Title
Rockfall Mitigation Hoover ii
I.7 52.222-35 Equal Opportunity for Veterans I-7
I.8 52.222-36 Equal Opportunity for Workers with Disabilities I-8
I.9 52.225-9 Buy American Act – Construction Materials I-8
I.10 52.252-6 Authorized Deviations in Clauses I-12
I.11 1452.228-70 Liability Insurance - DOI I-12
I.12 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – BOR
I-13
I.13 1452.223-81 Safety and Health – BOR I-14
I.14 1452.223-80 Ensuring Adequate COVID-19 Safety Protocols in Federal Buildings and Federally Controlled Facilities – BOR
I-15
I.15 1452.232-81 Payment for Mobilization and Preparatory Work – BOR I-15
I.16 1452.236-84 Preservations of Cultural Resources – BOR I-16
I.17 1452.237-80 Security Requirements – BOR – Alt III I-18
I.18 1452.243-80 Modifications Proposals – BOR I-24
I.19 52.223-23 Sustainable Products and Services - Deviation I-25
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - List of Attachments J-1
J.1 Applicability of Documents J-1
J.2 List of Attachments J-1
PART IV-REPRESENTATIONS AND INSTRUCTIONS
(This part will be removed after award.)
SECTION K - Representations, Certifications and Other Statements of Offerors K-1
K.1 52.252-1 Solicitation Provisions Incorporated by Reference K-1
K.2 52.203-2 Certificate of Independent Price Determination K-1
K.3 52.204-8 Annual Representations and Certificates - Deviation K-2
K.4 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment
K-5
K.5 52.204-26 Covered Telecommunications Equipment or Services- Representation
K-7
K.6 52.204-29 Federal Acquisition Supply Chain Security Act Orders – Representation and Disclosures
K-7
K.7 52.204-30 Federal Acquisition Supply Chain Security Act Orders— Prohibition – Alternate I
K-8
K.8 52.209-5 Certification Regarding Responsibility Matters K-12
K.9 52.209-7 Information Regarding Responsibility Matters K-13
K.10 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction Under any Federal Law
K-14
K.11 52.219-1 Small Business Program Representations K-15
SECTION L - Instructions, Conditions and Notices to Offerors L-1
L.1 52.212-1 Solicitation Provisions Incorporated by Reference L-1
L.2 52.216-1 Type of Contract L-1
L.3 52.222-5 Construction Wage Rate Requirements – Secondary Site of the Work
L-2
L.4 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal L-2
Project Title
Rockfall Mitigation Hoover
Employment Opportunity for Construction
L.5 52.225-10 Notice of Buy American Requirement – Construction Materials L-3
L.6 52.236-27 Site Visit (Construction) L-4
L.7 52.252-5 Authorized Deviations in Provisions L-4
L.8 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line Item – BOR
L-4
L.9 1452.215-80 Source Evaluation and Selection Procedures - BOR L-5
L.10 1452.215-81 Proposal Instructions – BOR L-5
L.11 Disclosure of the Magnitude of Constructions Projects L.9
SECTION M - Evaluation Factors for Award M-1
M.1 1452.215-84 Evaluation Factors for Award – Quality and Cost/Price Approximately Equal - BOR
M-1
Project Title
Rockfall Mitigation Hoover
This page left intentionally blank.
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Bureau of Reclamation
Lower Colorado Region
Regional Office 500 Fir Street
R30
Boulder City NV 89005
Bureau Of Reclamation
Attn: Bryan Williamson bwilliamson@usbr.gov
Bryan Williamson 7022938452
1x 07/16/2025
140R3025R0014
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Title: Rockfall Mitigation Hoover Dam - IDIQ
The estimated magnitude of each individual task order is $500,000 to $1,000,000 with a total contract value estimated at $5,000,000 over the 5-year ordering period.
The North American Industry Classification System (NAICS) Code is 237990, Other
Heavy and Civil Engineering Construction with a corresponding small business size standard of $45M.
This acquisition is a total Small Business set-aside.
This solicitation was issued as a Request for Proposal in accordance with the Part
15, Contracting by Negotiation and Part 36 Construction and Architect-Engineer
Contracts.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
0 0 calendar days and complete it within ________________ ________________ calendar days after receiving
Determined at Task Order Level
08/15/2025
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Lower Colorado Region
Regional Office 500 Fir Street
R30
Boulder City NV 89005
Luis Gallardo
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R3025R0014
00010 Continuation of Price Schedule in Section B
Rockfall Mitigation Hoover Dam
(See Attachment 3 IDIQ Price Schedule referenced in Section B)
Product/Service Code: Y1PZ
Product/Service Description: CONSTRUCTION OF
OTHER NON-BUILDING FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
SECTION B – Supplies or Services and prices
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page B-1
SECTION B – SUPPLIES OR SERVICES AND PRICES
B.1 THE REQUIREMENT
(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.
(b) Offerors are cautioned to carefully review the proposal submission requirements contained in Section L. Failure to comply with these requirements may result in an offer being determined technically unacceptable.
(c) Offers will be considered for award on the schedules in Paragraph B.2, but no offer will be considered for award for only a part of a schedule. Offers for only a part of a schedule may be determined technically unacceptable
(d) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for Mobilization and Preparatory Work Schedule Line Item.”
(e) Definitions:
(1) CLIN – Contract Line Item Number
B.2 CONTRACT PRICE SCHEDULE
Offerors shall complete Schedules 1 through 5 below by inserting fully burdened hourly labor rates, material rates and markup percentage rate for each of the schedules. Totals for each schedule shall be completed by calculating the labor and material rates for each line item listed in each schedule.
Additional labor classifications, materials, equipment, travel expenses and other direct cost items may be required on individual task orders and will be specified in the task orders. However, the labor, materials and markup rates proposed in each Schedule will be used to complete all Task Order pricing under the contract. In the Schedule below, offerors shall provide a fully burdened labor rate for the Laborer classification for each schedule based on the requirements of the Statement of Work (See Attachment 1 to the Contract).
The successful offeror’s proposed hourly rate, material rate and markup percentage rate shall become fixed contract rates and used in combination with estimates of hours and other related cost factors to establish fixed-prices and will be considered the maximum amount allowed for each competed task order under the IDIQ.
For pricing purposes use the Wage Determinations, General Decision Number NV20240024 & AZ20240058 contained in Section J, Attachment 1, of this solicitation.
The proposed unit price for the Crew Hours is to be the combined total of the fully burdened hourly rates (including all overheads ad profits) for the entire crew for one hour.
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page B-2
Definitions:
LF – Linear Feet SF – Square Feet
SCHEDULES 1 - 5
Rockfall Risk Mitigation - IDIQ
Total for Schedule 1 $______________
Total for Schedule 2 $______________
Total for Schedule 3 $______________
Total for Schedule 4 $______________
Total for Schedule 5 $______________
Total for All Schedules (Total Evaluated Price) $______________
NOTE: In lieu of completing the Schedule above for IDIQ contract award/price evaluation consideration, offerors must complete and submit Attachment 3- IDIQ Price Schedule and Attachment 2b – Task Order 1 Price Schedule found in Section J. The prices proposed for the “IDIQ Price Schedule” are binding and will be considered the maximum allowed unit price per ordering period under this IDIQ when competed with all IDIQ awardees. The “Task Order 1 Price Schedule” are binding and will be incorporated as the Price Schedule on the awarded Task Order. See solicitation Section L.10 for proposal instructions and solicitation Section M.1 for discussion of Price as an evaluation factor.
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page B-3
This page is internationally left blank
SECTION C –
Descriptions and
Specifications
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page C-1
SECTION C – DESCRIPTIONS AND SPECIFICATIONS
C.1 DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
The Contractor shall furnish the necessary personnel, materials, equipment, services and facilities (except as otherwise specified) to perform the requirement specified in the Statement of Work/Specifications/Work Statement contained in Attachment No. 1 of this solicitation/contract and in order to perform work under each awarded task order.
SECTION C –
Descriptions and
Specifications
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page C-2
SECTION D – Packaging and Marking
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page D-1
SECTION D – PACKAGING AND MARKING
(There is no additional information in this section)
SECTION D – Packaging and Marking
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page D-2
This page intentionally left blank.
SECTION E – Inspection and Acceptance
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page E-1
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
In addition, clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-01, etc.; and DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date
52.246-12 Inspection of Construction August 1996 https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/diar
SECTION F – Deliveries or Performance
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page F-1
SECTION F – DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
In addition, clauses can be identified as follows:
52.242-14 Suspension of Work April 1984
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION
OF WORK
APR 1984
For each task order, unless a different period of time is given in the task order, the Contractor shall be required to (a) commence work under this contract within 14 calendar days after notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 180 days after the date the Contractor receives the notice to proceed. The time stated for completion shall include option items (if awarded) and final cleanup of the premises.
F.3 CONTRACT ORDERING PERIOD
The overall ordering period will be for five (5) calendar years commencing upon contract award .
F.4 DELIVERY INFORMATION
a) All supplies or equipment required under this contract for Hoover Dam shall be shipped F.O.B.
destination to the following address:
Hoover Dam Central Warehouse NV State Route 172 Boulder City, NV 89005 ATTN: Dimitrios Nicholas
Deliveries will be accepted between 7:30 a.m. to 3:30 p.m., Pacific Time, Monday through Friday, excluding holiday. Notify the COR of inbound shipments at least two business day prior to anticipated delivery date.
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page F-2
F.5 TASK ORDER ISSUANCE PROCEDURES
(a) General. Task Orders will be issued under this contract in the form and manner set forth below.
(1) Task orders will be issued on a fair opportunity basis.
(2) Task orders will be issued on a Firm-Fixed Price basis.
(3) Work under this contract will be ordered by individual orders issued on Optional Form (OF) 347
(Order for Supplies or Services) to the Contractor by any Lower Colorado Region Contracting Officer having the appropriate warrant authority. In the case of an urgent requirement, the Contracting Officer may issue written notice to the Contractor to begin immediate work under a delivery/task order. Delivery Orders may include Original Equipment Manufacturer (OEM) drawings and Statement of Work.
(4) The Government will not be obligated to reimburse the Contractor for work performed, items delivered, or any costs incurred, nor shall the contractor be obligated to perform, deliver, or otherwise incur costs except as authorized by duly executed Task Orders.
(b) Fair Opportunity. Competition for issuance of Task Orders is limited to those awardees under this multiple award IDIQ contract. If multiple IDIQ contracts are awarded, each awardee shall be provided a fair opportunity for Delivery/Task orders in accordance with FAR 16.505(b)(1), unless the Contracting Officer determines that one of the exceptions at FAR 16.505(b)(2) applies.
There is an expectation that each Contractor will compete for all the work forthcoming under this contract. If the Contractor is unable to compete for the task order, the Contractor shall provide a no proposal response to the Contracting Officer and provide reason for inability to compete.
(c) Order Placement Procedures.
(1) The Government will issue a written request for proposal (RFP) electronically via e-mail which will include the proposed Statement of Work (SOW), drawings, the evaluation criteria and relative importance of each evaluation factor (if applicable), and the due date for receipt of proposals. All other terms and conditions will be contained in the basic contract. However, any minor/pertinent changes to these terms and conditions, including applicable fill-ins for certain clauses and additional contract direction or details specifically pertaining to the delivery/task order, will also be identified in the RFP and incorporated into the individual delivery/task order. Contractors must acknowledge receipt of each RFP.
Contractors are also required to notify the Contract Specialist within 2 days of receipt of an RFP if the firm cannot or will not propose on a delivery/task order. Receipt of the proposals after the specified time and date set by the Contracting Officer may result in the proposal not being considered for award.
(2) Unless the Contracting Officer applies the fair opportunity exceptions, each delivery/task Order will be awarded, as a result of competition to the contractor whose offer is the best value to the Government considering the evaluation criteria specified in the delivery/task order. RFPs will state the specific evaluation factors for each order and, when applicable, the relative importance of the evaluation factors. When non-price (e.g. technical) factors are applicable to the evaluation and selection, the Government may use the lowest-price technically-acceptable (LPTA), best delivery time, or tradeoffs of contracting by negotiation in order to obtain the best value for the Government. The Government reserves
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page F-3 the right to use procedure(s) that are best suited to the circumstances of the contract action to fulfill the Government’s requirements.
(3) The Contractor is expected to participate in a site visit (if applicable), examine the statement of work, drawings, specifications, Schedule, and all instructions. Failure to do so will be at the offeror's risk.
(4) A proposal shall not include any terms and conditions that would conflict with the contract terms and conditions; otherwise, the proposal may be considered non-responsive.
(5) The Contractor’s cost/ price proposal shall utilize the proposed quantity and type of labor and material and mark-up rates as listed in the applicable schedule at B.2. The wage determination issue by the U.S. Department of Labor, that is effective at the time a task order is issued and applicable Schedule will apply to that task order and Schedule.
(6) For labor, material, equipment, travel expenses, and bonds not listed in the schedule, but determined, by the Contracting Officer to be necessary for accomplishment of the work required under the proposed task order, the Contractor shall submit documentation to support the price proposed. The contractor’s price proposal shall identify the proposed quantity and type of labor, labor rates, material and equipment, shipping (FOB Hoover Dam Central Warehouse), G&A, overhead, and a reasonable profit estimated for the type and complexity of the work required under the individual proposed task order.
(7) A proposal must meet the Government's expressed requirement for delivery as stated in the
SOW. The proposal should indicate the contractor's compliance with the stated delivery/performance period for the services or identify the date the services will be delivered.
(8) After evaluation of the proposals has been completed, the proposal which offers the best value to the Government will be awarded the TO. In cases where price is the only evaluation factor, the proposal which offers the lowest price to the Government will be awarded the TO, subject to a positive determination that such proposed price is fair and reasonable. Price reasonableness of each TO will be determined in accordance with FAR Subpart 15.4. Task Orders may require discussions/negotiations. It is anticipated that competition among each TO will exist. However, if no competition exists, data other than certified cost or pricing data may be required to be submitted by the contractor in order to determine if the proposed price is fair and reasonable.
(9) Each task order will require work to be performed at Hoover Dam for on-site/field work, Construction Wage Rate Requirements shall apply to each task order.
(10) All provisions and clauses included in this solicitation and resulting IDIQ contract will apply to RFPs for TO and resulting TO contracts, unless otherwise noted on a TO basis. Additional contract clauses may be inserted into TO as applicable for the work ordered in the TO. The notice for each TO will provide any required "fill-ins" for provisions and clauses and other specific information/direction pertaining to the TO, including, but not limited to:
• Magnitude of construction/estimated price range (FAR36.204).
• Details regarding Commencement, Prosecution, and Completion of Work (reference FAR
Clause 52.211-10).
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page F-4
(d) Other Ordering Requirements.
(1) Bonding Requirements/Alternate Payment Protections. Reference Section H.2, Bonding Requirements.
(2) Labor Laws. The Construction Wage Rate Requirements is applicable to all individual task order requirements for on-site repairs that are $2,000 and above, in accordance with Contract Clause I.1, Clause 52.222-6, Construction Wage Rate Requirements.
(3) Certified Payroll Reports. For each task order issued, the awardee shall be required to furnish weekly certified payrolls (prime and subcontractor) in accordance with Contract Clause I.1, FAR Clause 52.222-8, Payrolls and Basic Records. Funds shall be retained from progress payments until all payroll reports are submitted.
(4) Release of Claims. Reference Contract Clause 1452.204-70, Release of Claims. For each order issued, the awardee shall be required to furnish a Release of Claims prior to final payment.
(5) Insurance. Reference Contract Clause WBR 1452.228-70, Liability Insurance – Department of the Interior. The contractor is required to procure and maintain liability insurance during the term of the contract. It is the responsibility of the contractor to provide updated insurance certificates when insurance policies expire.
(e) Minimum Guarantee. The Government shall order and the contractor shall furnish supplies/services costing the Government at least $2,500.00 during the 5-year IDIQ contract ordering period.
(f) Monetary Limitations. The cumulative/maximum amount of all task orders shall not exceed $5,000,000.00.
F.6 TASK ORDER PERFORMANCE PERIODS
Each individual task order will specify a performance period for the work covered under the task order.
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page F-5
SECTION G – Contract
Administration Data
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page G-1
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page G-2
G.2 1452.242-80 POSTAWARD CONFERENCE MAR 2022
(a) Prior to the contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The contractor's project manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held at [insert the location of the meeting.
(c) The contracting officer and the contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the contracting officer shall establish the date for the conference.
(d) The contractor shall not be entitled to the reimbursement any costs associated with attendance at the conference beyond the agreed-to contract price.
G.3 CONTRACTOR’S ADMINISTRATION PERSONNEL
Name: ________________________________________________ Title: _________________________________________________ Address: ______________________________________________
City/State/Zip: _________________________________________
Telephone No: _________________________________________ Fax No.: ______________________________________________ (Complete and submit with Proposal.)
G.4 DOI-
AAAP-0028
ELECTRONIC INVOICING AND PAYMENT
REQUIREMENTS – INTERNET PAYMENT
PLATFORM (IPP)
FEB 2021
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform (IPP). “Payment requests” means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted to the Contract Specialist (bwilliamson@usbr.gov) prior to entering the payment request in IPP the contractor is strongly encouraged to coordinate with the designated Contracting Officer's Representative (COR), for review and verification of any measured quantities for payment and for compliance with the applicable progress payment requirements of this contract. Prior coordination with the COR will allow for streamlined processing of the invoice. Support documents must include, but are not limited to, the following documents:
1) Invoice (Construction); and
2) Any additional documentation to substantiate each progress payment request and as required by the Contracting Officer’s Representative or Contracting Officer.
https://www.ipp.gov/
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page G-3
The Contractor shall also submit an electronic copy of the IPP invoice to bwilliamson@usbr.gov once the invoice has been submitted to IPP. Failure to email the invoice may cause significant delay or possible rejection of your payment request.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
mailto:ippgroup@bos.frb.org
SECTION H – Special
Contract Requirements
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 DOI-AAAP
NOTICE TO CONTRACTOR-- CONTRACTOR
PERFORMANCE ASSESSMENT REPORTING
SYSTEM
DECEMBER 2015
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts.
The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.
Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a. Contractor Representatives may then provide comments in response to the 6.evaluation, or return the evaluation without comment.
b. Your comments should focus on objective facts in the AO's narrative and should a)provide your views on the causes and ramifications of the assessed performance.
c. All information provided should be reviewed for accuracy prior to submission.
d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/
SECTION H – Special
Contract Requirements
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page H-2
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
H.2 BONDING REQUIREMENTS
(a) Depending on the value of a task order, performance and payment bonds or alternate payment protections may be required. If bonds or alternate payment protections are required, a notice to proceed will not be issued until the bonds/alternate payment protections are received. See Section I for FAR
Clauses 52.228-13, Alternative Payment Protections, FAR 52.228-14, Irrevocable Letter of Credit, and 52.228-15, Performance and Payment Bonds--Construction,
(b) The timeframe for providing bonds/alternate payment protections will be 10 calendar days after each task order is awarded.
(c) The RFP for each task order will identify an estimated magnitude of construction and whether it is contemplated that Performance and Payment Bonds or Alternate Payment Protections will be required.
SECTION I – Contract
Clauses
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page I-1
SECTION I – CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition
Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
In addition, clauses can be identified as follows:
52.202-1 Definitions JUNE 2020
52.203-3 Gratuities APRIL 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions on Subcontractor Sales to the Government JUNE 2020
52.203-7 Anti-Kickback Procedures JUNE 2020
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper
Activity
MAY 2014
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity MAY 2014
52.203-12 Limitation on Payments to Influence Certain Federal Transactions JUNE 2020
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform
Employees of Whistleblower Rights
NOVEMBER 2023
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements
JANUARY 2017
52.204-2 Security Requirements, Alternate II (Apr 1984) MARCH 2021
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JANUARY 2011
52.204-10 Reporting Executive Compensation and First - Tier Subcontract Awards JUNE 2020
52.204-13 System for Award Management Maintenance OCTOBER 2018
52.204-15 Service Contract Reporting Requirements for Indefinite-Delivery
Contracts
OCTOBER 2018
52.204-18 Commercial and Government Entity Code Maintenance AUGUST 2020
52.204-19 Incorporation by Reference of Representations and Certifications DECEMBER 2014
52.204-23 Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab Covered Entities
DECEMBER 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video
Surveillance Services or Equipment
NOVEMBER 2021
52.204-27 Prohibition on a ByteDance Covered Application JUNE 2023
52.209-6 Protecting the Government's Interest When Subcontracting With
Contractors Debarred, Suspended, or Proposed for Debarment
NOVEMBER 2021
52.209-9 Updates of Publicly Available Information Regarding Responsibility
Matters
JULY 2013
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOVEMBER 2015
52.215-2 Audit and Records – Negotiation JUNE 2020
52.215-8 Order of Precedence – Uniform Contract Format OCTOBER 1997
52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than NOV 2021
Solicitation No.
140R3025R0014 Project Title
Rockfall Mitigation Hoover
Page I-2
Certified Cost or Pricing Data.
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than
Certified Cost or Pricing Data-Modifications.
NOV 2021
52.216-7 Allowable Cost and Payment Alternate I AUGUST 2018
52.219-6 Notice of Total Small Business Set-Aside NOVEMBER 2020
52.219-8 Utilization of Small Business Concerns FEBRUARY 2024
52.219-28 Post-Award Small Business Program Representation FEBRUARY 2024
52.219-33 Nonmanufacturer Rule SEPTEMBER 2021
52.222-3 Convict Labor JUNE 2003
52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation MAR 2018
52.222-6 Construction Wage Rate Requirements AUGUST 2018
52.222-7 Withholding of Funds MAY 2014
52.222-8 Payrolls and Basic Records JULY 2021
52.222-9 Apprentices and Trainees JULY 2005
52.222-10 Compliance with Copeland Act Requirements FEBRUARY 1988
52.222-11 Subcontracts (Labor Standards) MAY 2014
52.222-12 Contract Termination-Debarment MAY 2014
52.222-13 Compliance with Construction Wage Rate Requirements and Related
Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEBRUARY 1988
52.222-15 Certification of Eligibility MAY 2014
52.222-21 Prohibition of Segregated Facilities APRIL 2015
52.222-26 Equal Opportunity SEPTEMBER 2016
52.222-27 Affirmative Action Compliance Requirements for Construction APRIL 2015
52.222-34 Project Labor Agreement JANUARY 2024
52.222-37 Employment Reports on Veterans JUNE 2020
52.222-40 Notification of Employee Rights Under the National Labor Relations
Act
DECEMBER 2010
52.222-50 Combating Trafficking in Persons NOVEMBER 2021
52.222-55 Minimum Wages Under Executive Order 13658 JANUARY 2022
52.222-62 Paid Sick Leave Under Executive Order 13706 JANUARY 2022
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024
52.225-13 Restrictions on Certain Foreign Purchases FEBRUARY 2021
52.226-7 Drug-Free Workplace MAY 2024
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving MAY 2024
52.228-1 Bid Guarantee SEPTEMBER 1996
52.228-2 Additional Bond Security OCTOBER 1997
52.228-5 Insurance - Work On A Government Installation JANUARY 1997
52.228-11 Individual Surety - Pledges of Assets FEBRUARY 2021
52.228-12 Prospective Subcontractor Requests for Bonds DECEMBER 2022
52.228-13 Alternative Payment Protections JULY 2000
52.228-14 Irrevocable Letter of Credit NOVEMBER 2014
52.228-15 Performance and Payment Bonds--Construction JUNE 2020
52.229-3 Federal, State,…