This document is a Statement of Work (SOW) for a Hoover Dam Rockfall Risk Mitigation Construction Indefinite Delivery/Indefinite Quantity (IDIQ) contract for the Bureau of Reclamation's Lower Colorado Dams Office. The contract requires the contractor to perform various rockfall hazard mitigation activities at Hoover Dam, including inspection, reporting, cleaning, scaling, and constructing permanent rockfall mitigation features such as rock bolts, wire mesh netting, cabling, and potentially a rockfall barrier system. Work will be conducted in areas surrounding the visitor center, parking lots, walkways, and canyon walls above the powerhouse.

Key contract requirements include semi-annual periodic maintenance, planned mitigation of potential rockfalls, and emergency corrective actions. The contractor must provide a four-person rope access crew with SPRAT or IRATA certified technicians, perform work within specific time restrictions (particularly around the visitor center), and submit detailed reports and documentation. The performance period is 180 days from the Notice to Proceed, with work to be coordinated to minimize interference with other operations. The contract allows for fixed price, time and material, and labor hour task orders, with payment based on specific measurement criteria for different mitigation activities like rock scaling, bolting, and netting.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hoover Dam Rockfall Risk Mitigation

CONSTRUCTION IDIQ SOW

Nevada/Arizona

BUREAU OF RECLAMTION

LOWER COLORADO DAMS OFFICE

P a g e | 2 of 32

This page left intentionally blank

P a g e | 3 of 32

Table of Contents

Contents

1.1 Acronyms ADD OR DELETE AS APPROPRIATE FOR THIS PROJECT

1 Project Introduction

1.1 Location and Facilities

1.2 Brief Project Description

1.3 Schedule Construction

2 General Requirements

2.1 Project Meetings

A. Pre-Construction Meeting B. Progress Meetings

2.2 Shipping and delivery

A. Shipping Address B. Warehouse Information

3 Construction Requirements

3.1 Staging Areas

3.2 Protection of Existing Installations

A. Parking of Construction Vehicles B. Site Cleaning

3.3 Access

3.4 Work Hour Restrictions

3.5 Environmental and Sustainability Requirements for Construction A. Hazardous Waste

3.6 Quality Control

A. General B. Execution C. Testing Laboratory and Equipment D. Documentation

3.7 Temporary Materials, Equipment and Services

A. Fire Protection Equipment B. Hazard Control C. Electricity D. Water E. Sanitary Facilities

3.8 Preservation of Adjacent Features

3.9 Hauling Restrictions

3.10 Safety

A. General B. Quality Assurance C. Enforcement

3.11 Personnel

A. General Performance of Work

P a g e | 4 of 32

B. Project Manager C. Technical Manager D. Technical Workforce

3.12 Workforce Certification

A. Workforce Skills B. Climbing Equipment

3.13 Project Close-out

A. Cleaning

3.14 Substantial Completion and Final Inspection

3.15 Acceptance of the Work

4 Project Description and Technical Requirements

4.1 Project Conditions

A. Site Visits, Inspections, and Investigations

4.2 Detailed Project Tasks

A. Mobilization B. Periodic Maintenance:

C. Planned Mitigation

4.3 Typical Rockfall Mitigation Activities

A. Moving or Removal (Scaling) of Rock B. Rock Bolting C. Meshing or Netting D. Cabling E. Rockfall Barrier System (Rockfall Fence) F. Grouting G. Labor H. Special Provision for Non-Duty-Hours Emergency Situations I. Value Engineering Study J. Task Reporting and Deliverables K. Progress Reports and Payment Requests

5 Deliverables and Submittals

5.1 Construction Schedule

A. Baseline B. Updated C. Modification or Delay

5.2 Technical Specifications and Submittals

A. General B. Drawings C. Government Review D. Submittal log:

5.3 Pre-Construction Deliverables

5.4 Reports

A. Daily Reports ................................................................................................................... Error! Bookmark not defined.

B. Test Reports

6 Attachments

P a g e | 5 of 32

P a g e | 6 of 32

1.1 ACRONYMS ADD OR DELETE AS APPROPRIATE FOR THIS PROJECT

ASTM American Society for Testing and Materials

CO Contracting Officer

COR Contracting Officer’s Representative

DBa Decibels

EA Environmental Assessment

FAR Federal Acquisition Regulation

GPD Gallons Per Day

GPM Gallons Per Minute

HP Horsepower

JHA Job Hazard Analysis

NEC National Electrical Code

NFPA National Fire Protection Association

PE Project Engineer

PM Project Manager

SDS Safety Data Sheets

SHPO State Historical Preservation Officer

Template Version: IMR ARRA MATOC DB Scope of Work Template 01-13-2010

P a g e | 7 of 32

1 Project Introduction

Project Name: Hoover Dam Rockfall Mitigation - IDIQ

Mailing Address: Warehouse Address:

Bureau of Reclamation: ATTN: LCD-23300 Hoover Dam Central Warehouse

P.O. Box 61470 NV State Route 172

Boulder City, NV 89006-1470 Boulder City, NV 89005

1.1 LOCATION AND FACILITIES

Hoover Dam is approximately 8 miles northeast of Boulder City, Nevada and 32 miles southeast of

Las Vegas, Nevada in Clark County. The work to be performed in various locations in the vicinity of the dam which includes but is not limited to canyons surrounding the visitor center parking garage, visitor center, various walkways and parking lots, canyon walls above the powerhouse.

1.2 BRIEF PROJECT DESCRIPTION

The Contractor shall be tasked to aid performing various aspects of rockfall hazard mitigation including the labor and activities involving inspection, reporting, cleaning, and scaling, and mitigation of rockfall hazards by constructing permanent rockfall mitigation features including rock bolts, wire mesh netting, and cabling rock in place. Construction of a rockfall barrier system (i.e.

rockfall fence) may also be required. Most of the rockfall hazards are to be mitigated by scaling or by securing with rock bolts, mesh, or cable. Scaling large rock onto project sites will be subject to additional approvals by the Government. All work will require that Government property is adequately protected. The contractor is responsible for ensuring quality rockfall hazard mitigation.

When tasked, the Contractor may be required to perform the following work activities (these activities may or may not be required in the order listed):

1. Mobilization and Submittal Preparatory Work.

2. Review the rockfall areas with the Government field representative to determine the best mitigation technique on a case-by-case basis

3. Develop and submit a proposal to accomplish the specific work, including a cost proposal, work (project) plan, work schedule, and narrative identification of information needed from the Government.

4. Develop and review proposals to protect Government property and facilities during rockfall mitigation (temporary rockfall protection measures).

5. Develop and submit proposals to control vehicular and pedestrian traffic (Traffic Control) to protect the public from falling rock during rock fall mitigation activities.

6. Scale designated slopes and construct permanent rockfall mitigation features of varying types and at locations as identified in the task orders and by the Government field representative.

P a g e | 8 of 32

7. Provide as-built drawings (Documentation) to the Government for work performed. As-built drawings may include marked up photographs.

8. Clean-up scaled rock from Government facilities.

Section 4 provides detailed information on the project description, existing conditions, design criteria, and technical requirements.

1.3 SCHEDULE CONSTRUCTION

The Contractor has 10 calendar days after award to provide Performance and Payment Bonds. Once

Performance and Payment bonds are approved the Notice to Proceed for design and construction will be issued. Upon award, the Contractor shall determine and provide a schedule for completion of construction milestones listed in Section 5.1. The performance period for design and construction shall be 180 days from the date of Notice to Proceed to final completion of the project and all required documentation.

2 General Requirements This section defines components of the project and Contract Line Items, and outlines progress payments and required project meetings.

2.1 PROJECT MEETINGS

A. Pre-Construction Meeting

After Notice to Proceed is given, the CO may arrange a preconstruction meeting to be held with the

Contractor. The Contracting Officer’s Notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors , and information regarding the items to be discussed. Deliverables required in advance of the meeting are listed in

Section 5.3. The meeting agenda may include but is not limited to the following:

• Progress meetings

• Roles and responsibilities

• Submittal process

• Construction schedule

• Progress payments

• Acceptance/rejection of the work

• Contractor’s Quality Control Plan

• Medical emergency processes, availability, emergency numbers, and contacts

• Road and site constraints

B. Progress Meetings

Meetings shall be held bi-weekly and more often if requested by the CO, COR, the Government or the Contractor for discussion of questions and problems relating to the work required under task orders. The agenda may include but is not limited to the following:

P a g e | 9 of 32

• Safety/Security

• Schedule

• Three-week look ahead

• Coordination’s (owner, stakeholders, etc.)

• Submittals

• RFIs

• Changes/Modifications/Cost Impacts

• General Discussion.

2.2 SHIPPING AND DELIVERY

A. Shipping Address

Hoover Dam Central Warehouse

NV State Route 172

Boulder City, NV 89005

ATTN: Dimitrios Nicholas

B. Warehouse Information

1. Receiving hours are 0730-1530 PST, Monday through Friday, excluding Federal holidays.

2. Notify the COR of inbound shipments at least two business days prior to anticipated delivery date.

3. If the vehicle transporting material is involved in a collision and a reasonable person would consider it prudent to inspect the material for damage before use at Hoover Dam, the Contractor shall arrange for the material to be transported to its shop and inspect the material completely before reshipment to Hoover Dam.

B. Receiving Shipments

1. The Government will not accept shipments on behalf of the Contractor at the Hoover Dam Central Warehouse, the Contractor must have someone onsite to accept any deliveries.

2. The Government will not inspect or offload shipments which are accepted on behalf of the Contractor. The Contractor is responsible for inspection of shipments for any damage incurred in transit.

3. The Government will not transport shipments nor offload materials. The Contractor is responsible for the transportation of shipments and offloads from the Hoover Dam Central Warehouse to the worksite.

3 Construction Requirements

3.1 STAGING AREAS

The Contractor will be permitted to use Government land, controlled by the Bureau of Reclamation, for field office, storage yard, and other construction facilities required for construction purposes.

Additional laydown areas are available at the Hoover Dam Central Warehouse. Equipment laydown

P a g e | 10 of 32 and vehicle parking areas will be designated by the COR. However, contractors must take appropriate measures to secure and protect contractor- owned/provided materials and equipment, as use of the designated areas may not be exclusive.

The Contractor’s use of Government land for construction purposes will not interfere with any part of the work nor with the work activity of other contractors or the Government in the vicinity.

Arrange and operate construction facilities in a manner to preserve and protect existing features, trees, and vegetation to the maximum practicable extent. The location, construction, operation, maintenance, and removal of construction facilities on Government land shall be subject to the approval of the Contracting Officer.

1. Removal of Construction Facilities. Upon completion of the work, remove construction facilities and perform the required cleanup.

The contractor shall coordinate with COR, at least 14 days prior to mobilization, for areas needed for these purposes.

3.2 PROTECTION OF EXISTING INSTALLATIONS

Do not disturb portions of project site beyond areas in which the work is indicated. Construction zones shall be fenced to keep out non-construction personnel. The fencing shall define the construction zone and confine activity to the minimum area required for construction. All protection measures shall be clearly stated in the construction documents, and workers will be instructed to avoid conducting activities beyond the construction zone as defined by the construction zone fencing. The construction zone shall be designated a hard hat area in accordance with contractor policy.

A. Parking of Construction Vehicles

Parking of vehicles shall be limited to existing roads, in legally designated areas, and within approved staging area(s) by the COR.

B. Site Cleaning

Constantly keep project sites clean of construction debris during the duration of the project.

3.3 ACCESS

Coordinate construction efforts with the CO such that there is minimal impact to the work of BOR personnel and the visiting public.

The Contractor shall allow for Government occupancy of project site and keep driveways and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

P a g e | 11 of 32

3.4 WORK HOUR RESTRICTIONS

Contractor shall minimize the impact of this project on visitors and Hoover personnel. Traffic delays shall be kept as short as possible. Rock fall mitigation activities that involve rope work shall NOT be performed in the Visitor Center area between 9 a.m. and 8 p.m. See Figure 1 for Visitor Center

Areas. The Contractor shall provide temporary lighting to allow scaling during an overnight shift. The

Contractor must be off rope by 9 a.m. The Contractor shall have procedures in place to allow for the safe passage of vehicular and pedestrian traffic from 7:30 a. m. to 9 a.m. and any temporary protective measures or fallen rock that would impede or obstruct access must be removed to allow for safe passage.

Figure 1: Restricted Zones between 9am – 8pm.

3.5 ENVIRONMENTAL AND SUSTAINABILITY REQUIREMENTS FOR CONSTRUCTION

The following are general environmental and sustainability requirements during construction, designed to minimize construction impacts.

Water: Avoid materials that can leach toxic chemicals into the ground water. Do not allow toxic chemicals to enter sewers or storm drains. Apply Best Management Practices, including vehicle wash-down areas, protection of equipment storage and maintenance areas, and sweeping of roadways related to hauling activities.

A. Hazardous Waste

If work under any task order under this Agreement generates or is likely to generate Hazardous

Waste Materials, the Contractor shall immediately notify both the Contracting Officer and the

Contracting Officer’s Representative, including recommendations regarding immediate handling of

P a g e | 12 of 32 waste already generated or for which generation is unavoidable. The Contractor shall provide an estimate of the cost and schedule impacts associated with planning, characterizing, manifesting, handling, and disposition of the generated waste, within 48 hours of providing such notification. All

Hazmat plans and actions shall comply with relevant requirements of OSHA (29 CFR, et al) and RSHS regarding workforce and environmental health and safety; and 40 CFR, as applicable for training, handling, manifesting, permitting, and disposition actions; and other appropriate regulations and laws.

1. The Contractor shall dispose of general, non-hazardous wastes and wastes below published action thresholds shall be disposed as directed by the site manager, either by deposition locally in an approved container or by transport to an approved public waste repository appropriate to the type and volume of waste generated.

2. Hazardous Materials Data. Submit the List of Hazardous Materials (LHM) and Safety Data Sheets (SDS) in accordance with 7.0, Submittal Requirements and in accordance with the requirements of paragraph (e) of the clause at FAR 52.223-3, Hazardous Materials Identification and Safety Data.

Submit a Hazardous Spill Plan at least 7 days prior to construction. The plan shall state what actions will be taken in case of a spill

1. Plan will also incorporate preventative measures to be implemented, such as placement of refueling facilities, storage, and handling of hazardous materials, etc.

2. Immediately notify the CO & COR of hazardous spills.

3.6 QUALITY CONTROL

A. General

The quality of all work shall be the responsibility of the Contractor. Inspect and test all work as needed to ensure that the quality of materials, workmanship, construction, finish, and functional performance is following applicable specifications and drawings.

B. Execution

1. Off-Site-Control: Items that are fabricated or assembled off-site shall be inspected for quality control at time of delivery to the worksite.

2. On-Site Control: Ensure items and materials are inspected for quality control per manufacture specifications prior to installation.

C. Testing Laboratory and Equipment

1. Contractor shall provide a report on proof tests of rock bolts in accordance with ASTM D4435

2. All measuring devices, laboratory equipment, and instruments shall have approved and valid calibration certifications in accordance with NBS requirements. Upon request, measuring and testing devices shall be made available for use by the Government for verification tests.

P a g e | 13 of 32

D. Documentation

1. Quality Control Daily Reports and Test Reports shall be submitted to the CO and COR within 48 hours following the date of the report.

2. Quality Control Daily Reports may not be substituted for other written reports required under clauses of the contract, such as Disputes, Differing Site Conditions, or Changes.

3.7 TEMPORARY MATERIALS, EQUIPMENT AND SERVICES

Temporary materials may be new or used but must be adequate in capacity for the required usage, must not create unsafe conditions, and must not violate requirements of applicable codes and standards.

A. Fire Protection Equipment

Observe and enforce standards of fire prevention. No open fires shall be allowed. A capable and qualified person shall be placed in charge of fire protection. A hot work permit shall be required prior to any hot work. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe torch cutting and welding procedures.

B. Hazard Control

Take all necessary precautions to prevent fire during construction. Do not store flammable or combustible liquids in existing structures. Provide adequate ventilation during use of volatile or noxious substances.

C. Electricity

The contractor shall furnish all the electrical power required to complete the requirements of this specification. There may be 110-volt 20-amp service available at select locations; if so, there will be no cost to the contractor for use of available station service power at Reclamation facilities. Power shall be coordinated with the COR.

1. Provide generators, transmission lines, distribution circuits, transformers, and other electrical equipment and facilities required for obtaining power and distributing power to points of use where station service power is not available.

2. Remove all temporary equipment and facilities upon completion of work under this contract.

D. Water

BOR shall provide potable water at no charge to the contractor from the existing water system when the system is operational. The contractor is responsible for installing and removing all temporary connections to the BOR water system. All temporary connections shall be approved by the BOR.

E. Sanitary Facilities

The Contractor shall provide and maintain temporary toilet facilities in accordance with State Health

Department and NPS regulations for use of Contractor’s personnel. Completely remove sanitary facilities upon completion of work.

P a g e | 14 of 32

3.8 PRESERVATION OF ADJACENT FEATURES

Confine all operations to within the work limits of the project. Prevent damage to natural surroundings.

Restore damaged areas outside the work limits, repairing or replacing damaged structures at no additional expense to the BOR.

Provide temporary barriers to protect existing structures that are to remain in place. Carefully supervise construction operations near existing facilities or structures, to prevent damage.

Construction procedures will prevent accidental disruptions to facilities outside the project limits by investigation of existing utilities and protection during construction: accidental disruptions shall be remedied at no cost to the BOR.

3.9 HAULING RESTRICTIONS

Comply with all legal and local load restrictions in the hauling of materials.

3.10 SAFETY

A. General

1. Perform all work in accordance with the applicable standards from OSHA, RSHS, and HECP.

2. Contractor will be required to provide the following submittals for this section.

3. Safety Program (Site Specific):

a. Written safety program in accordance with of RSHS.

b. Cover aspects of on-site and applicable off-site operations and activities associated with this contract.

c. Follow the outline in Appendix B of RSHS

d. View an online copy of the RSHS manual at no charge from the Bureau of Reclamation website at: http://www.usbr.gov/ssle/safety/RSHS/rshs.html

e. Will not be accepted for review by the COR unless it addresses, in order, lettered and numbered per Appendix B, a narrative for each applicable item in the outline. For items in the outline that do not apply to this contract write “Not applicable to Contract” next to the number/letter.

f. A generic company safety program is not acceptable. Safety Program must be site specific for this contract.

g. Submitted and accepted prior to commencing onsite work, including mobilization.

4. Job Hazard Analysis: In accordance with RSHS (Appendix 4B)

5. Monthly Accident Report: In accordance with RSHS.

6. Contractors Onsite Safety Personnel Qualifications.

C. Fall Protection:

1. Inspect fall protection equipment for proper function prior to performing respective work

D. Contractor’s Onsite Safety Representative http://www.usbr.gov/ssle/safety/RSHS/rshs.html

P a g e | 15 of 32

1. Competent supervisory employee with current safety and health related training, experience, and duties on at least three projects of similar nature, size, complexity, and work to be performed as the current project.

a. OSHA Construction 30-Hour Training Course including applicable elective subjects, for example Concrete and Masonry Construction; Cranes, Derricks, Hoists, Elevators, and Conveyors; Materials Handling, Storage, Use and Disposal;

Motor Vehicles, Mechanized Equipment and Marine Operations; Signals and Barricades; Powered Industrial Vehicles; Safety and Health Programs; Scaffolds;

Steel Erection; Tools - Hand and Power; Welding and Cutting. Current first aid CPR certification.

B. Quality Assurance

Ensure that all employees are physically qualified to perform their assigned duties in a safe manner.

Do not allow employees to work if their abilities are impaired. Operators of all equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment.

C. Enforcement

The Contractor shall stop work on any item or feature pending satisfactory correction of any safety issue noted by any of the contractor’s staff, any of the subcontractor’s staff, COR, or the CO.

3.11 PERSONNEL

A. General Performance of Work

The Contractor shall furnish sufficient technical, supervisory, and administrative personnel always to ensure execution of the work is in accordance with the task order schedule.

B. Project Manager

The Contractor shall appoint a Project Manager to serve as a single point of contact and liaison between the Contractor and the Contracting Officer or representative (Technical Manager) for all work required under this Agreement. Upon award of each task order, the Contractor shall provide the Contracting Officer with the name of the individual so designated in writing. The Contractor's

Project Manager will be responsible for the complete coordination of all work developed under the task order. The Project Manager will also provide a list of all Sub-Contracts with all the applicable licensing, insurance, and qualifications.

C. Technical Manager

The Contractor shall provide a technical manager for each task order who shall be qualified by independent certification or by submission of a Statement of Professional Qualifications and

Experience that is accepted by the Contracting Officer’s Representative. This Statement may be in

Contractor format but must provide identifying information, contact information, and a summary record of relevant education, training, and experience that qualifies the proposed individual to serve as Technical Manager on assigned task orders under this Agreement. The Contractor shall provide

P a g e | 16 of 32 appropriate qualifications information for each individual at least once (first use) in the base and each option period. The Technical Manager may also serve as the contractor’s Project Manager, at the contractor’s discretion.

D. Technical Workforce

The Contractor shall provide information and maintain a record of the qualifications, including relevant education, training, certifications, insurance, and State licensure, for all Contractor

(including any Subcontractor) workforce engaged in responsible charge of any technical aspect of task orders under this Agreement, including but not limited to emergency response and regular support and services, to the extent appropriate to the specific activities required for the task order.

3.12 WORKFORCE CERTIFICATION

A. Workforce Skills

Employees shall be competent in the techniques and equipment to be used for rope-supported work. This shall cover climbing safety, climbing hazards, the use, limitations, inspection and maintenance of equipment, and basic climbing and self-rescue techniques. Minimum standards for climbers should be as follows:

1. Climber - Capable of understanding climbing safety and fall hazards, applications of equipment, estimating free fall distance, anchorage techniques, equipment maintenance and inspection, rescue, and practice in application of techniques for rope supported work.

Shall be SPRAT or IRATA certified.

2. Team Leader - Must have the ability to write job hazard analysis, be able to analyze and layout rope supported jobs in a safe and efficient manner, have experience in the type of work to be performed, and be able to verify the climbing team’s experience and medical qualifications. A team leader is responsible for and will supervise, either directly or indirectly, all climbing operations conducted by his/her team. Shall be SPRAT Level III certified or IRATA equivalent.

3. Workforce Certification - Contractors are required to ensure that their employees meet the minimum skill requirements for rope-supported work and that all workers using rope access are SPRAT or IRATA certified.

4. Workforce Physical Capabilities - Climbers should be physically capable of performing rope-supported work. Climbers should have current physical examinations that would indicate that the climbers are physically capable of performing rope supported work.

B. Climbing Equipment.

Each piece of equipment used in the support system shall be capable of supporting 5,000 pounds

(22.2 kN) static load without failure. Equipment strengths shall be certified as meeting the requirements of ANSI-A10.32, ANSI Z359.1, NFPA 1983-1996, the European Union (designated by the ACE@marking), Union Intenationale des Associations d=Alpinisme (UIAA), or other recognized certification organization. Prior to use, the complete support system and all its parts must be

P a g e | 17 of 32 evaluated for adequacy by a person who is knowledgeable on how the entire system will function under the various slope conditions.

1. Belay - For work covered by this section, a safety (belay) rope will be used. The belay line will be separate and independent from the support (load) line. Belays may be either controlled by another person (manned belay) or self-controlled (self belay). For jobs where the work surface provides the primary support once the work site is reached, a belay line will be used, if feasible. The standard belay line (safety line) will be a static rope meeting the minimum strength requirements of this section. Where a standard belay is not used, a deceleration device will be used to limit fall forces to less than 1,800 pounds. The maximum free fall distance will not exceed 6 feet.

2. Anchorage - At least two independent anchorages, each capable of supporting at least 5,000 pounds (22.2 kN) static load, shall be used. Anchorages shall be located far enough apart that the failure of one anchor will not cause the failure of the other anchor. Anchors should be in line with the direction of rope pull, if possible. If this is not possible, steps must be taken to limit the extension of the rope if one anchor fails. All climber-installed anchorages, except directional anchors, must meet the minimum strength requirements of this section. Directional anchors are defined as anchors used to laterally position a climber who is supported by two anchors meeting the requirements of this section. Directional anchors do not take the place of the main support anchors.

3. Rope - Only man-made fiber ropes specifically designed for climbing or rescue applications and meeting the minimum strength requirements of this section will be allowed for support or safety ropes. Ropes will be of kern mantle construction with a minimum diameter of/16 inch (11 mm) and a maximum diameter of 2 inch (13 mm).

4. Hardware - All hardware used in the support system shall meet the minimum strength requirements of this section. Only locking carabineers will be used in the support system.

Locking shackles may be substituted for locking carabineers in anchor connections.

5. Body Harnesses - Only full body harnesses, which distribute fall arrest forces over at least the upper thighs, pelvis, waist, chest and shoulders shall be used. Harnesses shall have D-ring connections meeting the minimum strength requirements of this section at the waist, center front, chest, and back. Separate waist and chest harnesses shall be permitted if they are designed to be buckled together.

6. Equipment Inspection - All equipment used for rope-supported work shall be inspected prior to use and after each use, using Manufacturer’s recommended procedures. A rope log will be maintained for each rope.

7. Equipment Retirement - Any equipment used for rope supported work that has been subjected to severe impact or shock loading shall immediately be removed from service and shall not be used again for employee protection until inspected and determined by a person knowledgeable about equipment specifications to be undamaged and suitable for reuse. Any equipment exceeding manufacturer’s recommended wear or showing other defects shall be removed from service. Ropes, webbing, accessory cord, and harnesses shall be automatically retired from service after 5 years regardless of condition or use history.

8. Communications - Reliable voice communications must be available between an employee on the rope and the top slope or belay personnel.

P a g e | 18 of 32

3.13 PROJECT CLOSE-OUT

Deliverables required prior to Project Close-out are listed in Section 5.7. Submit these items to the

CO/COR prior to requesting a Final Inspection.

A. Cleaning

Before scheduling the final inspection, remove all tools, equipment, surplus materials, and trash.

Restore or refinish surfaces that are damaged due to work of this contract to original condition.

Remove grease, dirt, stains, foreign materials, and labels from finished surfaces. Pick up and remove all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.

3.14 SUBSTANTIAL COMPLETION AND FINAL INSPECTION

Submit written certification that project, or designated portion of project, is substantially complete, and request, in writing, a final inspection. Upon receipt of written request that project is substantially complete, the government will proceed with inspection within 10 calendar days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.

When work is determined to be substantially complete, the government will prepare a list of deficiencies ("Punch List") to be corrected before final acceptance. The government will issue a Letter of

Substantial Completion. If work is not determined to be substantially complete, the government will notify the Contractor in writing. After completing work, the Contractor shall resubmit certification and request a new final inspection.

Contractor shall complete the work described on the list of deficiencies within 30 calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the government may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs in accordance with the Inspection of Construction clause of the contract.

3.15 ACCEPTANCE OF THE WORK

After all deficiencies have been corrected, the CO will issue a Letter of Acceptance.

P a g e | 19 of 32

4 Project Description and Technical Requirements

4.1 PROJECT CONDITIONS

A. Site Visits, Inspections, and Investigations

1. The Contractor shall visit and inspect or investigate each site as necessary and required during the preparation and accomplishment of the work. All work and data developed under this statement of work shall be related to current site conditions.

2. The contractor shall coordinate and plan for access to the construction area with the COR.

3. The Contractor, if required, shall record site conditions by photograph or other means. One copy of each such conditions record taken, shall be furnished to the Contracting Officer at the time of the first review.

4. All travel, costs, and expenses incurred by the Contractor, or sub-contractor, including consultants, for such site visits, inspections, and investigations shall be included in the lump sum price.

4.2 DETAILED PROJECT TASKS

The following tasks, or combination of tasks may arise at Reclamation facilities.

A. Mobilization

The Contractor shall furnish all materials, equipment, supplies, services, personnel, and all other resources to perform the rock stabilization and removal outlined in this statement of work in support of Hoover Dam and other facilities.

B. Periodic Maintenance:

Semi-annually, the Contractor may be required to perform maintenance or mitigation of features and conditions, including but not limited to review of the site to identify recurring rock scaling activities and other measures such as wire mesh netting, rock bolting, and so on, where conditions of the rock and/or previously installed mitigation measures pose safety risks to the public or facilities. “Periodic maintenance” may include planned rope access, inspection, planning, and reporting of findings to the Government and scaling of rock by hand or bar or securing of rock by bolting, wire mesh netting, or other measures. The Government will provide an inspector/geologist to establish the amount of work required in each area.

1. Performance: The Government may issue periodic maintenance task orders as performance-based service instruments, with clearly defined plan, schedule, and outcomes.

The Contractor’s plan and schedule for this periodic work should clearly identify work tasks with expected outcomes or deliverable products.

2. Schedule: Periodic maintenance shall be scheduled and performed at intervals of not less than five nor more than seven months; and scheduling shall be coordinated to minimize risk of interference with other operations and maintenance activities at the assigned facility. Contractor shall provide a proposed schedule and activity plan, identifying specific

P a g e | 20 of 32 maintenance items to be performed during the scheduled work period and including both routine maintenance and any updates, changes, and non-critical repairs that were identified during the maintenance cycle.

C. Planned Mitigation

Contractor may be required to mitigate potential rockfalls that are not an imminent hazard but are determined to require mitigation because the identified potential rockfall is otherwise expected to become a significant safety risk to the public or to facilities. This effort may include planned rope access, inspection, planning, and reporting of findings to the Government and scaling of rock by hand or bar or other mitigation measures like wire mesh netting, rock bolting, and other on-site constructed mitigations. The Government will provide an inspector/geologist to establish the amount of work required in each area.

1. Performance: The Government may issue mitigation task orders as performance-based service instruments, with clearly defined plan, schedule, and outcomes. The Contractor’s plan and schedule for this periodic work should clearly identify work tasks with expected outcomes or deliverable products.

2. Schedule: Mitigation shall be scheduled and performed at such times it is deemed necessary; and scheduling shall be coordinated to minimize risk of interference with other operations and maintenance activities at the assigned facility. Contractor shall provide a proposed schedule and activity plan, identifying specific maintenance items to be performed during the scheduled work period and including all mitigation techniques and locations identified in the task order.

Provide non-critical, urgent corrective action services as directed by the Contracting Officer, when potentially mission affecting but non-critical rockfall occurs. The Contractor shall survey the site needing corrective actions and provide an assessment report including recommended activities, cost, and schedule. Upon the Contracting Officer’s direction, the Contractor shall perform those recommended activities approved by the Contracting Officer.

1. “Urgent” means an event that requires correction sooner than the next regular periodic maintenance cycle, but does not require immediate, emergency response. Activities may include evaluation, and correction of potential safety hazards; travel to the site; performing activities on site; and other activities as may be approved by the Contracting Officer

2. Schedule: the Contractor’s initial contact shall occur within 3 working days after receipt of the task from the Contracting Officer. The Contractor shall provide the initial assessment report and recommendations, including cost and schedule, to the Contracting Officer within 10 working days thereafter. Upon direction of the Contracting Officer, the Contractor shall proceed with further work including corrective actions within the schedule as accepted by the Contracting Officer and/or negotiated and executed by supplemental agreement.

There is no intent of removing rock that does not pose a threat to the public, personnel, or facilities.

Only rock that can be removed by hand or bar will be scaled; areas that can be mitigated by bolting, wire mesh netting, or other techniques will be so identified and treated.

P a g e | 21 of 32

Hazardous conditions the contractor may encounter may include, but are not limited to, specific low and high temperature extremes; possible high winds; and animals such as snakes.

Close coordination and communication are required for all the above tasks by both Reclamation and the contractor. All tasks shall be monitored by the assigned Reclamation Representative and coordinated with the operations and maintenance staff of the identified facility. The Government reserves the right to evaluate the resulting corrective actions, for a period of up to 30 days after completion, prior to acceptance of task work and approval of payment. The purpose of such evaluation is to verify that the corrective actions are stable and enduring, and that no unforeseen impacts exist that may require additional efforts by the Contractor. All tasks shall be documented with complete reports, to include documentation of changes and update and maintenance documentation.

Since the IDIQ allows for fixed price, time and material and labor hour orders; subsequent changes to awarded task orders may be fixed price, time and material, or labor hour.

Payment for work performed under time-and material and labor-hour changes will include actual costs plus overhead and profit established at the time of contract award.

4.3 TYPICAL ROCKFALL MITIGATION ACTIVITIES

Typical mitigation measures anticipated for most task orders of this contract include but are not limited to the following:

A. Moving or Removal (Scaling) of Rock

This work includes the rope access, inspection, planning, reporting of findings to the Government and scaling of rock by hand, bar, or compressed air. The Government will provide an inspector/geologist to establish the amount of work required in each area after considering the recommendations of the contractor’s representative. There is no intent of removing rock that does not pose a threat to the public, personnel, or the facilities. Only rock that can be removed by hand or bar shall be scaled. Rock that may pose a future threat or that requires removal beyond the scope of this contract shall be identified and reported with recommendations to the Government for possible future contract work. Scaling large rock onto project sites will be subject to additional approvals by the Government.

1. Rock fall mitigation activities that involve rope work shall NOT be performed in the Visitor Center area between 9 a.m. and 6 p.m. See Figure 1 for Visitor Center Areas. The Contractor may provide temporary lighting to allow scaling during an overnight shift. The Contractor must be off rope by 9 a.m. The Contractor will have procedures in place to allow for the safe passage of vehicular and pedestrian traffic from 7:30 a. m. to 9 a.m. and any temporary protective measures or fallen rock that would impede or obstruct access must be removed to allow for safe passage.

2. Work performed on the slopes above the powerhouses may be performed at any time provided the Contractor informs the Lower Colorado Dams Office and obtains permission.

P a g e | 22 of 32

Scaling slopes above the powerhouses will require that the Contractor remove the scaled rock in a controlled manner to prevent damage to structures below.

3. Inspection of the areas for the next shift(s) scaling and reporting may continue past 9 a.m.

provided there is no risk of rockfall to the public below. The Government will determine the requirements of any work past 9 a.m. on a daily basis. The Government may utilize rope access technicians past 9 a.m. to inspect and report on the rockfall condition at other locations in the Hoover facility up to an eight hour shift although it is not guaranteed each scaler will work eight hours each shift unless work is performed under light before sunrise.

This work includes furnishing the Government with a two-way radio to allow communication between the Government and the scaling crew. The radio shall be returned to the contractor at completion of the work. The contractor shall also make provisions to maintain suitable anchors and ropes for use by the Government inspector/geologist to access the work areas as required by the Government to perform inspections of the areas.

This work also includes providing suitable temporary lighting if work is performed before sunrise.

4. Measurement and Payment: Measurement will be by the hour of rock scaling per scaler.

The Government will determine the start time and end time of each day’s scaling. No separate payment is made for supervision, reporting, assistance to the Government inspector in climbing or radio.

B. Rock Bolting

This work includes the rope access, inspection, planning, reporting of findings and installation of rock bolts of suitable size and length to attach rock-at-risk to underlying sound rock. This is to include but not limited to all anchoring, plates, and grout required to install rock bolts and includes time and equipment to tension and test rock bolts. Appendix A to this Statement of Work specifies minimum requirements for materials used in permanent mitigation measures. Refer to the

Statement of Work, Appendix B, for specifications on rock bolting.

1. Measurement and Payment: Measurement will be based on the Labor and Materials required to secure features with rock bolts. Include all singular costs and pro-rata costs to establish a unit price based on the unit of measurement in the work item schedule below for each sub-task. Payment shall be by linear foot of rock bolt grouted and tensioned in place. Payment will be full compensation for support ropes, anchorage, resin cartridges or grout, nuts, bolts and plates and includes time and equipment to tension and test rock bolts.

C. Meshing or Netting

This work includes the rope access, inspection, planning, reporting of findings and installation of a rock-retaining steel mesh using periodically spaced anchors to attach and support the mesh on adjacent sound rock faces. This is to include but not limited to all anchoring, rope, spike plates, clips and grout required to install wire mesh netting and anchors and includes time and equipment.

Appendix A to this Statement of Work specifies minimum requirements for materials used in permanent mitigation measures.

1. Measurement and Payment: Measurement will be based on the Labor and Materials required to secure features with steel mesh. Include all singular costs and pro-rata costs to

P a g e | 23 of 32 establish a unit price based on the unit of measurement in the work item schedule.

Payment shall be by square foot of wire mesh netting anchored in place. Payment will be full compensation for support ropes to weave mesh together, resin cartridges or grout, clips, anchors and plates and includes time and equipment. Appendix A to this Statement of Work specifies minimum requirements for materials used in permanent mitigation measures.

D. Cabling

This work includes the rope access, inspection, planning, reporting of findings and installation to wrap metal cable around rock blocks and anchoring to sound rock. This is to include but not limited to all anchoring, rope, spike plates, clips and grout required to install wire cable and anchors and includes time and equipment. Appendix A to this Statement of Work specifies minimum requirements for materials used in permanent mitigation measures.

1. Measurement and Payment: Measurement will be based on the Labor and Materials required to secure features with cable. Include all singular costs and pro-rata costs to establish a unit price based on the unit of measurement in the work item schedule.

Payment shall be by square foot of wire mesh netting anchored in place. Payment will be full compensation for support ropes to weave mesh together, resin cartridges or grout, clips, nuts, bolts and plates. No separate payment will be made for other materials or for rock that is simply moved to a safe location.

E. Rockfall Barrier System (Rockfall Fence)

This work includes the rope access, inspection, planning and reporting of findings to construct a permanent rockfall barrier system (i.e. rockfall fence), including posts, cables, braking elements and required anchors may be required to be constructed. Systems shall be designed and installed in accordance with industry standards and the manufactures recommendations and as directed by the

Government. The rockfall barrier shall consist of standard components that can be replaced easily when needed. The rockfall barrier shall be resistant to corrosion, UV degradation and thermal deterioration. The system design shall have been previously used and shall have demonstrated satisfactory performance in similar applications and capacities. The wire mesh and net portions of the rockfall barrier system shall be replaceable after initial installation. As soon as practicable after date of award and before proceeding with fabrication or procurement of material, the Contractor will submit, for approval, the required copies of commercial products or equipment data, installation instructions, data parts list, maintenance manuals, and installer's qualifications.

1. The permanent rockfall barrier system shall be approved by the Government prior to being installed and shall be installed in accordance with industry standards and the manufacturer's recommendations. The contractor shall furnish all materials, supplies, labor, and equipment for the permanent catch net system and submit to the Government any manufacturer's warranty. Appendix A to this Statement of Work specifies minimum requirements for materials used in permanent mitigation measures.

2. Measurement and Payment: Measurement will be based on the linear foot. Payment shall be linear foot of rockfall barrier constructed. Payment will be full compensation for all material including freight, supervision, engineering, drawings and spare parts; plus labor, P a g e | 24 of 32 equipment, tools, royalties and other incidentals necessary to install a complete system ready to use.

F. Grouting

The contractor shall ensure any activities requiring the use of grout shall be color matched to the rock being adhered to it. Contractor will also ensure minimal spillage onto rock or structures below.

G. Labor

This work includes the rope access, inspection, planning, reporting of findings to the Government and labor to install all permanent rockfall mitigation features.

1. Four-man crew required for the rope access labor, including safety oversight and control or work performed on rope. All the rope access technicians must meet all requirements set out in the main contract. At all times a level 3 SPRAT or IRATA rope access supervisor will be required to be onsite during work hours

2. Measurement and Payment: Measurement will be by the hour for rope access inspection, rockfall mitigation or scaling per rope access technician. The Government will determine the start time and end time of each day's work. The Government anticipates the crew will work ten hours each per day or night. The rate shall be the rate that was established in the base contract Section B, Schedule, or as negotiated for this Task Order.

H. Special Provision for Non-Duty-Hours Emergency Situations

In the event of a critical rockfall or imminent rockfall that presents actual or imminent threat to people and facilities, occurring after normal staff duty hours (generally occurring other than weekdays between 7 a.m. and 3:30 p.m. Pacific Time Zone, or on Federal holidays), the Government reserves the right to activate and use its internal Inaccessible Features Access Team for immediate temporary mitigation measures. Subsequently, at the sole discretion of the Government, the

Contractor may be tasked to respond with complete emergency corrective action to establish long-term mitigation of the rockfall area. In such events, an emergency task order may be issued by the

Contracting Officer that is not fully defined as to cost and scope; for such task orders, the Contractor will provide a firm cost proposal within 10 days of receipt of the order or other such time as the

Contracting Officer may determine to be reasonable.

1. This procedure applies solely to critical emergency events at Reclamation facilities that require immediate action to prevent damage…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .