Questions_and_Answers_0008.pdf

PDF 134 KB Posted

Attached to
Archimedes pump construction for Topock Federal contract opportunity
Solicitation number
140R3024R0028
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document is a set of Questions and Answers related to Solicitation No. 140R3024R0028 for the construction of an Archimedes pump station with a capacity of 60 cfs. The key details are:

The solicitation will be awarded as a firm-fixed price contract under FAR Parts 36 (Construction Contracts) and 15 (Contracting by Negotiation). The magnitude of the project is estimated between $10-15 million. Regarding technical specifications, the government clarified that there will be no liquidated damages, confirmed the Indian Preference Plan requirement, and provided guidance on acceptable materials, welding testing, bearing connections, guard materials, and lubrication requirements. The government also indicated that the contractor can submit Requests for Information (RFIs) to propose modifications during the contract phase, as appropriate.

View the file

Other files for this federal contract opportunity

Other files attached to Archimedes pump construction for Topock, newest first.
File Type Posted
Revised_Page_M-4_0008.pdf PDF
Sol_140R3024R0028_Amd_0008.pdf PDF
Sol_140R3024R0028_Amd_0007.pdf PDF
Sol_140R3024R0028_Amd_0006.pdf PDF
Questions_and_Answers_0006.pdf PDF
Sol_140R3024R0028_Amd_0005.pdf PDF
Sol_140R3024R0028_Amd_0004.pdf PDF
Sol_140R3024R0028_Amd_0003.pdf PDF
Specs-Amd1_TopockMarshPPFirebreakCanalPumpSta_09-05-2024_0003.pdf PDF
Solicitation_No__140R3024R0028_Revised_Section_B_0003.pdf PDF
00_00_02_Dwgs-Amd1_TopockMarshPumpingPlant_11x17_09-05-2024_0003.pdf PDF
Sol_140R3024R0028_Amd_0002.pdf PDF
140R3024R0028_Sign_In_Sheet_0002.pdf PDF
Topock_Marsh_Pumping_Plant_Geotechnical_Report_2022_Part_2_0001.pdf PDF
Sol_140R3024R0028_Amd_0001.pdf PDF
Topock_Marsh_Pumping_Plant_Geotechnical_Report_2022_0001.pdf PDF
Soil_Borings_Information_-_Topock_Marsh_2010_0001.pdf PDF
Questions_and_Answers_0001.pdf PDF
Topock_Marsh_Pumping_Plant_Geotechnical_Report_2022_Part_3_0001.pdf PDF
FAR_52_211_01_0001.pdf PDF
Attachment_4_Wage_Determination_AZ20240014.pdf PDF
Attachment_7_Subcontracting_Plan_Template.pdf PDF
Attachment_3_00_00_02A_Dwgs-B_Geology_and_Logs.pdf PDF
Attachment_5__DI-137_Release_of_Claims.pdf PDF
Attachment_6_Past_Performance_Questionnaire.pdf PDF
Solicitation_No__140R3024R0028.pdf PDF
Sol_140R3024R0028.pdf PDF
Attachment_8_Map_for_Site_Visit_Location.jpg JPG image
Attachment_2_06_00_00_02_Drawings.pdf PDF
Attachment_1_Specifications.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 140R3024R0028

Questions & Answers

1. Please add FAR 52.211-12 Liquidated Damages-Construction to the Terms and Conditions of the Contract so that the parties may reasonably assess risk associated with timely completion and any impact on pricing.

As previously stated under Amendment 0006, there are no Liquidated Damages tied to this solicitation. Therefore, FAR Clause 52.211-12 will not be added.

2. Page M-4 states offerors will be evaluated on its Indian Preference Plan as identified in "Phase Two, Evaluation Factor 3 of Section L," however, there is no Phase Two, Evaluation Factor 3 listed in Section L. Please confirm whether an Indian Preference Plan is required. If it is, please provide further details regarding this requirement.

Page M-4 has been updated and replaced with this Amendment 0008.

3. Please confirm what grade Stainless Steel (SS304 or SS316is required as specified in Table 33 12 78B - Materials of Construction.

Contractor to recommend materials that are suitable for the conditions (operating, climate, water, etc.).

4. Table 33 12 78B identifies Pump Shafts and Flanges to be Stainless Steel, please confirm if this is the upper and lower bearing flanges.

This applies to all shafts and flanges that make-up the shaft-line.

5. Specification section 33 12 78 2.05 B requires 100% of the weds to be tested. 100 % of the weld test excessive, usually we go with a smaller % like 10% to 25% Magnetic Particle Examination ISO 17638, and 10%- 25% of the welded connection of the center tube to end flanges 0 tested by Ultrasonic Examination in accordance with ISO 17640.

Refer to section 33 12 78 2.05 D.4. If Contractor is awarded the contract, the Contractor can submit a RFI to modify the flange to end plate connection method. This process is done during the Contract phase, not Solicitation phase.

6. Specification section 33 12 78 2.05 D.4 states "Connect shaft flange to end plate with high-strength fasteners." Please confirm the following is acceptable: Use standard EDT threaded nuts and screw-threaded shafts to attach the upper and lower bearings to the screw tube. The quality of these shafts is C45, which is based on DIN EN 10083-2 and AISI 104 standards.

Refer to section 33 12 78 2.05 D.4. If Contractor is awarded the contract, the Contractor can submit a RFI to modify the flange to end plate connection method. This process is done during the Contract phase, not Solicitation phase.

7. Specification section 33 12 78 2.08 D.1 requires Fabricated steel guards, please confirm if aluminum guards are sufficient.

Refer to section 33 12 78 2.08 D.1. If Contractor is awarded the contract, the Contractor can submit a RFI to modify the guard material. This process is done during the Contract phase, not Solicitation phase.

8. Specification section 33 12 78 2.08 E.5 requires Kop-Flex or equivalent for couplings.

Please confirm N-Eupex is an approved equivalent of the requested coupling.

Contractor is responsible to compare the salient characteristics of equivalent products prior to submitting for Government approval. This process is done during the Contract phase, not Solicitation phase.

9. Specification Section 33 12 78 2.17 Pump Factory Assembly and Test Requirements - full testing of the complete installation is not feasible at the factory as the assembly will be installed in a concrete trough. Please confirm lower bearing fit ups is sufficient for this requirement.

Refer to section 33 12 78 2.17. The concrete trough is not considered part of the assembly.

10. Specification Section 33 12 78 2.19 requires food grade non-petroleum lubricating oil and great. We will consult the manufacturers of the bearings, motors, and gear reducers.

However, if food-grade lubrication is not available or not recommended, will petroleum-based lubricant be acceptable.

Refer to section 33 12 78 2.19. If Contractor is awarded the contract, the Contractor can submit a RFI to modify the lubrication materials. This process is done during the Contract phase, not Solicitation phase.