140R3024R0025_Questions_and_Responses_13__15__16__19__24__and_63_0003.pdf

PDF 113 KB Posted

Attached to
HOOVER DAM POWERPLANT STATION SERVICE REPLACEMENT
Solicitation number
140R3024R0025
Issued by

About this file

This document contains questions and responses related to Solicitation 140R3024R0025 for the Hoover Dam Powerplant Station Service Replacement project. The key details are:

The solicitation is for the replacement of station service equipment at the Hoover Dam Powerplant. Responses to several questions are provided, including: removing the requirement for grounded metal safety shutters, allowing non-drawout potential transformers, adding software for required testing, allowing non-grounded shutters for low-voltage switchgear, maintaining the NEMA 12 enclosure requirement, and clarifying that certain existing electrical panels are to remain powered. The solicitation is being issued by the Department of the Interior's Bureau of Reclamation for the Boulder Canyon Project in Arizona and Nevada. No award date, pricing terms, set asides, or incumbent information is provided in this document.

View the file

Other files

File Type Posted
140R3024R0025_Questions_and_Answers_03_0004.pdf PDF
Sol_140R3024R0025_Amd_0004.pdf PDF
26_16_14_-_Secondary_Unit_Substation_0004.pdf PDF
Sol_140R3024R0025_Amd_0003.pdf PDF
01_140R3024R0025_Description_Specifications_Section_26_16_14_-_Secondary_Unit_Substation_0003.pdf PDF
01_140R3024R0025_Description_Specifications_Section_26_05_20_-_Conductors_and_Cables_0003.pdf PDF
00_140R3024R0025_Solicitation_Section_B_0003.pdf PDF
03b_140R3024R0025_Wage_Determinations_NV20240024_dated_07192024_0003.pdf PDF
00_140R3024R0025_Solicitation_Section_J_0003.pdf PDF
03a_140R3024R0025_Wage_Determinations_AZ20240006_dated_07192024_0003.pdf PDF
Sol_140R3024R0025_Amd_0002.pdf PDF
140R3024R0025_Questions_and_Responses_01_0002.pdf PDF
Sol_140R3024R0025_Amd_0001.pdf PDF
140R3024R0025_Switchgear_Site_Visit_Sign-In_Sheet_0001.pdf PDF
02_140R3024R0025_Drawings.pdf PDF
00_140R3024R0025_Hoover_Dam_Powerplant_Station_Service_Replacement_Boulder_Canyon_Project_Solicitation.pdf PDF
06_140R3024R0025_Small-Business-Subcontracting-Plan.docx DOCX document
07_140R3024R0025_Past_Performance_Questionnaire.doc DOC document
04b_140R3024R0025_SF25_Performance_Bond.pdf PDF
05_140R3024R0025_DI-137_Release_of_Claims.pdf PDF
03a_140R3024R0025_Wage_Determinations_AZ20240006_dated_03222024.pdf PDF
03b_140R3024R0025_Wage_Determinations_NV20240024_dated_01052024.pdf PDF
04a_140R3024R0025_SF24_Bid_Bond.pdf PDF
01_140R3024R0025_Description_Specifications.pdf PDF
04c_140R3024R0025_SF25A_Payment_Bond.pdf PDF
Sol_140R3024R0025.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140R3024R0025

Hoover Dam Powerplant Station Service

RFP 140R3024R0025

Questions and Responses 02

13) Specs call for grounded metal safety shutters, Eaton will provide standard safety shutters which are not metal.

a) TOPIC: main section, safety shutters

b) The grounded requirement was removed. See revised Specifications.

15) Drawout type PTs would not be offered as these are not standard design in C37.20.1 switchgear. Is this acceptable?

a) TOPIC: protection scheme, equipment, PT’s

b) The drawout requirement was removed. See revised Specifications.

16) Secondary test kit not provided for PXR trip unit Magnum breakers. Secondary injection testing is performed with laptop and USB cable.

a) TOPIC: main section, trip units, testing

b) The contractor will supply all testing equipment and qualified/certified personnel to perform the required testing. Software was added for testing. See revised Specifications.

19) Are glastic shutters acceptable for LV switchgear? Grounded metal is typical for medium voltage metal-clad switchgear.

a) TOPIC: main section, equipment ratings

b) The grounded requirement was removed. See revised Specifications.

24) Exception to NEMA 12 construction. Would N3R gasketed be acceptable?

a) TOPIC: main section, equipment ratings

b) NEMA 12 requirement stays, no change.

63) On the gear Line ups DSN,DSD DSA we do not see provisions being requested for to accomodate refeeding CSB1,CSB2,MSE,MSF please clarify how we are permanently repowering these panels.

a) TOPIC: main sections, equipment consolidation, temp power plan

b) These are to remain in place, and remain powered, as they serve critical loads. See revised specifications.