This document is a Solicitation for the Hoover Dam Powerplant Station Service Replacement project. The Department of the Interior Bureau of Reclamation is seeking contractors to furnish labor, equipment, and materials for the demolition, removal, and replacement of electrical equipment and cabling at the Hoover Dam Powerplant.

The solicitation includes two price schedules. Price Schedule A covers lump sum items such as mobilization, electrical drawings, demolition, new secondary unit substations, and other electrical equipment. Price Schedule B covers unit pricing for replacement conductors and cables of varying sizes. Offerors must bid on the total of both Price Schedules A and B, as partial bids will be deemed nonresponsive. The estimated quantities in the price schedules are for evaluation purposes only, and the contract allows for variation in quantities. No set-asides are mentioned. Award will be made to the responsible offeror whose proposal, conforms to the solicitation and is most advantageous to the Government, considering price and other factors.

View the file

Other files

File Type Posted
140R3024R0025_Questions_and_Answers_03_0004.pdf PDF
Sol_140R3024R0025_Amd_0004.pdf PDF
26_16_14_-_Secondary_Unit_Substation_0004.pdf PDF
Sol_140R3024R0025_Amd_0003.pdf PDF
01_140R3024R0025_Description_Specifications_Section_26_16_14_-_Secondary_Unit_Substation_0003.pdf PDF
140R3024R0025_Questions_and_Responses_13__15__16__19__24__and_63_0003.pdf PDF
01_140R3024R0025_Description_Specifications_Section_26_05_20_-_Conductors_and_Cables_0003.pdf PDF
03b_140R3024R0025_Wage_Determinations_NV20240024_dated_07192024_0003.pdf PDF
00_140R3024R0025_Solicitation_Section_J_0003.pdf PDF
03a_140R3024R0025_Wage_Determinations_AZ20240006_dated_07192024_0003.pdf PDF
Sol_140R3024R0025_Amd_0002.pdf PDF
140R3024R0025_Questions_and_Responses_01_0002.pdf PDF
Sol_140R3024R0025_Amd_0001.pdf PDF
140R3024R0025_Switchgear_Site_Visit_Sign-In_Sheet_0001.pdf PDF
02_140R3024R0025_Drawings.pdf PDF
00_140R3024R0025_Hoover_Dam_Powerplant_Station_Service_Replacement_Boulder_Canyon_Project_Solicitation.pdf PDF
06_140R3024R0025_Small-Business-Subcontracting-Plan.docx DOCX document
07_140R3024R0025_Past_Performance_Questionnaire.doc DOC document
04b_140R3024R0025_SF25_Performance_Bond.pdf PDF
05_140R3024R0025_DI-137_Release_of_Claims.pdf PDF
03a_140R3024R0025_Wage_Determinations_AZ20240006_dated_03222024.pdf PDF
03b_140R3024R0025_Wage_Determinations_NV20240024_dated_01052024.pdf PDF
04a_140R3024R0025_SF24_Bid_Bond.pdf PDF
01_140R3024R0025_Description_Specifications.pdf PDF
04c_140R3024R0025_SF25A_Payment_Bond.pdf PDF
Sol_140R3024R0025.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B – Supplies or

Services and Prices/Costs

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Canyon Project

Page B-1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 THE REQUIREMENT

(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.

(b) Offerors are cautioned to carefully review the proposal submission requirements contained in Section

L.9. Failure to comply with these requirements may result in a proposal being determined unacceptable.

(c) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.

(1) Offerors shall complete Price Schedules A and B. Offers for less than the total of Price

Schedules A and B will be considered nonresponsive and will not be evaluated for award.

(2) Offers will be evaluated on the total of Price Schedules A and B.

(3) Price Schedule B is for removing, replacing, and post installation testing of failed conductors based on switchgear DSA, DSB, DSC, DSD, and DSN conductor testing.

(d) Offerors shall complete the schedule(s) in Section B and Request for Proposals, SF-1442.

(e) Quantities in the Price Schedules are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(f) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for

Mobilization and Preparatory Work Schedule Line Item.”

(g) Definitions:

(1) CLIN – Contract Line Item Number

B.2 PRICE SCHEDULE

PRICE SCHEDULE A

CLIN Section Supplies or Services Quantity and

Unit

Unit

Price

Amount

A-1 WBR

1452.232-

Mobilization and Preparatory

Work

For the lump sum of $

A-2 01 33 26 Electrical Drawings and Data –

DSA

For the lump sum of $

A-3 01 33 26 Electrical Drawings and Data –

DSB

For the lump sum of $

I

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Canyon Project

Page B-2

PRICE SCHEDULE A

CLIN Section Supplies or Services Quantity and

Unit

Unit

Price

Amount

A-4 01 33 26 Electrical Drawings and Data –

DSC

For the lump sum of $

A-5 01 33 26 Electrical Drawings and Data –

DSD

For the lump sum of $

A-6 01 33 26 Electrical Drawings and Data –

DSN

For the lump sum of $

A-7 01 33 26 Electrical Drawings and Data –

Panelboards

For the lump sum of $

A-8 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSA

For the lump sum of $

A-9 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSB

For the lump sum of $

A-10 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSC

For the lump sum of $

A-11 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSD

For the lump sum of $

A-12 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSN

For the lump sum of $

A-13 26 05 04 Demolition and Removal of

Panelboards and Circuit

Breakers

For the lump sum of $

A-14 26 05 20 Conductors and Cables – 2/C –

8 AWG

1,250 lin ft $ $

A-15 26 05 20 Conductors and Cables – 5/C –

10 AWG

1,600 lin ft $ $

A-16 26 05 20 Conductors and Cables – 12/C

– 12 AWG

2,000 lin ft

A-17 26 05 20 Cable Testing For the lump sum of $

A-18 26 16 14 Secondary Unit Substation –

DSA

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page B-3

PRICE SCHEDULE A

Unit

Unit

Price

Amount

A-19 26 16 14 Secondary Unit Substation –

DSB

For the lump sum of $

A-20 26 16 14 Secondary Unit Substation –

DSC

For the lump sum of $

A-21 26 16 14 Secondary Unit Substation –

DSD

For the lump sum of $

A-22 26 16 14 Secondary Unit Substation –

DSN

For the lump sum of $

A-23 26 16 14 Secondary Unit Substation –

Differential Relays

For the lump sum of $

A-24 26 16 14 Secondary Unit Substation –

Spare Parts

For the lump sum of $

A-25 26 16 14 Secondary Unit Substation –

Maintenance Equipment

For the lump sum of $

A-26 26 20 10 Temporary Power Equipment For the lump sum of $

A-27 26 24 16 Panelboards For the lump sum of $

A-28 26 24 16 Circuit Breakers For the lump sum of $

A-29 26 32 36 New Resistive Load Bank and

Removal of Existing

TOTAL FOR PRICE SCHEDULE A $_________________

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page B-4

PRICE SCHEDULE B

Unit

Unit

Price

Amount

B-1 26 05 20 Conductors and Cables – 1/C -

1/0 AWG

432 lin ft $ $

B-2 26 05 20 Conductors and Cables – 1/C –

2/0 AWG

216 lin ft $ $

B-3 26 05 20 Conductors and Cables – 1/C –

3/0 AWG

432 lin ft $ $

B-4 26 05 20 Conductors and Cables – 1/C –

4/0 AWG

432 lin ft $ $

B-5 26 05 20 Conductors and Cables – 1/C –

250 MCM

1080 lin ft $ $

B-6 26 05 20 Conductors and Cables – 1/C –

300 MCM

3576 lin ft $ $

B-7 26 05 20 Conductors and Cables – 1/C –

350 MCM

1800 lin ft $ $

B-8 26 05 20 Conductors and Cables – 1/C –

400 MCM

864 lin ft $ $

B-9 26 05 20 Conductors and Cables – 1/C –

600 MCM

216 lin ft $ $

TOTAL FOR PRICE SCHEDULE B $_________________

TOTAL FOR PRICE SCHEDULES A and B $_________________