This document is a Solicitation (Request for Proposals) for the Hoover Dam Powerplant Station Service Replacement project in Arizona and Nevada. The Bureau of Reclamation, Interior Region 8: Lower Colorado Basin is seeking to award a contract for the station service switchgear replacement at the Hoover Dam Powerplant.

The primary work includes replacement of two 208V switchgears and three 480V switchgears, replacement of multifunction relays for station service protection, installation of main-tie-main control equipment, installation of temporary power equipment and feeders, testing and replacement of feeder cables, removal of a motor control center, and replacement of multiple panelboards and circuit breakers throughout the power plant. The project will be coordinated based on scheduled generation outages and other operational requirements.

This is a full and open competition solicitation issued under FAR Part 15, Contracting by Negotiation. Proposals are due by July 29, 2024. The estimated contract value is between $5-10 million. The North American Industry Classification System (NAICS) code is 237130, Power and Communication Line and Related Structures Construction, with a small business size standard of $45 million average annual receipts. Large businesses must submit an acceptable subcontracting plan to be eligible for award.

View the file

Other files

File Type Posted
140R3024R0025_Questions_and_Answers_03_0004.pdf PDF
Sol_140R3024R0025_Amd_0004.pdf PDF
26_16_14_-_Secondary_Unit_Substation_0004.pdf PDF
Sol_140R3024R0025_Amd_0003.pdf PDF
01_140R3024R0025_Description_Specifications_Section_26_16_14_-_Secondary_Unit_Substation_0003.pdf PDF
140R3024R0025_Questions_and_Responses_13__15__16__19__24__and_63_0003.pdf PDF
01_140R3024R0025_Description_Specifications_Section_26_05_20_-_Conductors_and_Cables_0003.pdf PDF
00_140R3024R0025_Solicitation_Section_B_0003.pdf PDF
03b_140R3024R0025_Wage_Determinations_NV20240024_dated_07192024_0003.pdf PDF
00_140R3024R0025_Solicitation_Section_J_0003.pdf PDF
03a_140R3024R0025_Wage_Determinations_AZ20240006_dated_07192024_0003.pdf PDF
Sol_140R3024R0025_Amd_0002.pdf PDF
140R3024R0025_Questions_and_Responses_01_0002.pdf PDF
Sol_140R3024R0025_Amd_0001.pdf PDF
140R3024R0025_Switchgear_Site_Visit_Sign-In_Sheet_0001.pdf PDF
02_140R3024R0025_Drawings.pdf PDF
06_140R3024R0025_Small-Business-Subcontracting-Plan.docx DOCX document
07_140R3024R0025_Past_Performance_Questionnaire.doc DOC document
04b_140R3024R0025_SF25_Performance_Bond.pdf PDF
05_140R3024R0025_DI-137_Release_of_Claims.pdf PDF
03a_140R3024R0025_Wage_Determinations_AZ20240006_dated_03222024.pdf PDF
03b_140R3024R0025_Wage_Determinations_NV20240024_dated_01052024.pdf PDF
04a_140R3024R0025_SF24_Bid_Bond.pdf PDF
01_140R3024R0025_Description_Specifications.pdf PDF
04c_140R3024R0025_SF25A_Payment_Bond.pdf PDF
Sol_140R3024R0025.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 140R3024R0025

Contract No. TBD

Full and Open Competition

Hoover Dam Powerplant Station Service Replacement

Boulder Canyon Project

U.S. Department of the Interior

Bureau of Reclamation

Interior Region 8: Lower Colorado Basin

This page intentionally left blank

FOREWORD Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station Service

Replacement Boulder Canyon Project

FOREWORD

The BOR, Interior Region 8: Lower Colorado Basin is seeking to award a contract for station service switchgear replacement. The Work is located at Hoover Dam Powerplant approximately 8 miles northeast of Boulder City, Nevada in Clark County, Nevada and Mohave County, Arizona. Primary work includes station service replacement of two 208V switchgears and three 480V switchgears; replacement of multifunction relays for station service protection and installation of main-tie-main control equipment.

There will also be installation of temporary power equipment and feeders to 480V loads while switchgear is being replaced; testing and replacement of 208V and 480V feeder cables based on test results; removal of a motor control center; and replacement of multiple 208V and 480V panelboards and circuit breakers throughout power plant. The project will include coordinating the work based on scheduled generation outages and other operational requirements. Contractors must provide all personnel, equipment, tools, materials, and supervision as well as any additional items and services necessary to provide work as defined in these Specifications.

This acquisition is being procured under Federal Acquisition Regulations Part 15, Contracting by

Negotiation. Offerors are cautioned to carefully review the offer submission requirements contained in

Section L and the evaluation criteria and standards contained in Section M. To be considered qualified for this work, offerors must fully address all evaluation factors. Reference Section L, for instructions and

Section M, paragraph M.1 for evaluation factors and acceptability standards. The Government anticipates making award without discussions.

NAICS: The North American Industry Classification System (NAICS) code for this acquisition is

237130, Power and Communication Line and Related Structures Construction, which has a small business size standard of $45.0 million in average annual receipts.

MAGNITUDE OF CONSTRUCTION PROJECTS: In accordance with Federal Acquisition

Regulation (FAR) 36.204 Disclosure of the Magnitude of Construction Projects, the estimated magnitude will be between $5,000,000 and $10,000,000.

SUBCONTRACTING PLAN: In accordance with FAR 19.702(a)(1) If a Large Business submits a proposal it must submit a subcontracting plan as part of its package. Large Businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan.

SITE VISIT: See Section L.5, FAR 52.236-27 Site Visit (Construction) for information regarding the organized site visit. A site visit will be held on July 10, 2024, at 8:00am local time. The site visit will be held at Hoover Dam. Contact Max Watanga and Luis Gallardo, mwatanaga@usbr.gov and lgallardo@usbr,gov if you intend to attend the site visit. If no notification is received from interested vendors, the site visit will be cancelled. Personal Protective Equipment will be required. Participants must bring steel toe shoes and hard hat to do the walk through.

Vendors are urged and expected to inspect the site where work is to be performed and to satisfy themselves regarding all general and local conditions that may affect the price of the work to be performed, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after award of the contract.

WRITTEN QUESTIONS: Requesting Clarification. Offerors may submit written questions requesting clarification of solicitation requirements. All questions shall be received no later than July 12, 2024, at

2:00pm PDT. Questions received after that date may not be entertained. ONLY WRITTEN QUESTIONS

FOREWORD Solicitation No.

Project Title

Hoover Dam Powerplant Station Service

Replacement Boulder Canyon Project

WILL RECEIVE A RESPONSE. Each question submitted shall contain the following information: document name, document date, specific page, paragraph, clause or other definitive citation for which clarification is requested. All questions shall be submitted electronically via email to Max Watanga and Luis Gallardo, mwatanaga@usbr.gov and lgallardo@usbr,gov. Answers will be provided to only questions submitted in writing, and all answers will be provided in an amendment through the Contracting Opportunities via

SAM.gov.

OFFER SUBMISSION: See solicitation Section L.9, 1452.215-81 Proposal Instructions--Bureau of

Reclamation, which specifies the number of copies of each proposal volume to be furnished with the

Offeror's proposal.

For date and place of receipt of proposals see the Solicitation, Offer, and Award (Construction, Alteration or Repair) SF-1442 form.

For the date, place, and time of Offer Submission, See Standard Form (SF) 1442.

OTHER NOTES TO OFFERORS: For information regarding Bureau of Reclamation’s publication

“Reclamation Safety and Health Standards" (June 2024 Edition as revised, with revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract, see clause WBR 1452.223-81 Safety and Health.

Table of Contents

Solicitation No.

Project Title

Hoover Dam Powerplant Station Service

Replacement Boulder Canyon Project i

TABLE OF CONTENTS

FOREWORD

TABLE OF CONTENTS

PART I – THE SCHEDULE

SECTION A – Solicitation/Contract Form – SF-1442 A-1

SECTION B - Supplies or Services and Prices/Costs

B.1 The Requirement B-1

B.2 Price Schedule B-1

SECTION C – Description/Specifications/Statement of Work C-1

C.1 Statement of Work/Specifications C-1

SECTION D - Packaging and Marking – Not applicable D-1

SECTION E - Inspection and Acceptance E-1

E.1 52.252-2 Clauses Incorporated by Reference E-1

SECTION F - Deliveries or Performance F-1

F.1 52.252-2 Clauses Incorporated by Reference F-1

F.2 52.211-10 Commencement, Prosecution, and Completion of Work F-1

SECTION G - Contract Administration Data G-1

G.1 1452.201-70 Authorities and Delegations G-1

G.2 1452.201-80 Contracting Officer’s Representative’s Authorities and

Limitations

G-2

G.3 DOI-AAAP-0028 V3 Invoice Platform (IPP)—Treasury Electronic Invoicing

System

G-3

G.4 DOI-AAAP-0050 V2 Notice to Contractors-Contractor Performance

Assessment Reporting System

G-3

G.5 1452.242-80 Post Award Conference—Bureau of Reclamation G-5

G.6 Government Administration Personnel G-5

SECTION H - Special Contract Requirements – Not applicable H-1

PART II - CONTRACT CLAUSES

SECTION I - Contract Clauses I-1

I.1 52.252-2 Clauses Incorporated by Reference I-1

I.2 52.204-30 Federal Acquisition Supply Chain Security Act Orders – Prohibition

Alt II

I.4

I.3 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal

Employment Opportunity for Construction

I.8

I.4 52.222-35 Equal Opportunity for Veterans I.9

I.5 52.222-36 Equal Opportunity for Workers with Disabilities I.9

I.6 52.225-11 Buy American-Construction Materials under Trade Agreements –

Alternate I

I.10

I.7 52.228-1 Bid Guarantee I-11

I.8 52.228-13 Alternative Payment Protections I-11

Project Title

Hoover Dam Powerplant Station Service ii

I.9 52.244-6 Subcontracts for Commercial Items I-11

I.10 52.252-6 Authorized Deviations in Clauses I-16

I.11 1452.228-70 Liability Insurance - Department of the Interior I-16

I.12 1452.201-80 Contracting Officer’s Representative’s Authorities and

Limitations -- Bureau of Reclamation

I.13

I.13 1452.223-80 Asbestos-Free Warranty - Bureau of Reclamation I-17

I.14 1452.223-81 Safety and Health - Bureau of Reclamation I-19

I.15 1452.223-82 Ensuring Adequate COVID-19 Safety Protocols in Federal

Buildings and Federally Controlled Facilities

I-19

I.16 1452.231-81 Equipment Ownership and Operating Expense - Bureau of

Reclamation

I-21

I.17 1452.232-81 Payment for Mobilization and Preparatory Work - Bureau of

Reclamation

I-21

I.18 1452.236-80 Other Contracts (Deviation) I-22

I.19 1452.236-84 Preservation of Cultural Resources - Bureau of Reclamation I-22

I.20 1452.237-80 Security Requirements - Bureau of Reclamation - Alternate III I-28

I.21 1452.243-80 Modification Proposals – Alternate IV - Bureau of Reclamation I-36

I.22 Safety Data Submittal Requirements - Bureau of Reclamation - Lower

Colorado Region

I-36

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J - List of Attachments J-1

J.1 Applicability of Documents J-1

J.2 List of Contract Documents J-1

PART IV-REPRESENTATIONS AND INSTRUCTIONS

(This part will be removed after award.)

SECTION K - Representations, Certifications and Other Statements of Offerors K-1

K.1 52.252-1 Solicitation Provisions Incorporated by Reference K-1

K.2 52.204-8 Annual Representations and Certifications K-1

K.3 52.204-24 Representation Regarding Certain Telecommunications and Video

Surveillance Services or Equipment

K-5

K.4 52.204-26 Covered Telecommunications Equipment or Services-

Representation

K-7

K.5 52.204-29 Federal Acquisition Supply Chain Security Act Orders –

Representation and Disclosures

K-8

K.6 52.209-7 Information Regarding Responsibility Matters K-8

K.7 52.209-13 Violation of Arms Control Treaties or Agreements--Certification K-9

K.8 52.229-11 Tax on Certain Foreign Procurements—Notice and Representation K-12

SECTION L - Instructions, Conditions and Notices to Offerors L-1

L.1 52.252-1 Solicitation Provisions Incorporated by Reference L-1

L.2 52.211-1 Availability of Specifications Listed in the GSA Index of Federal

Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-

L-1

L.3 52.222-5 Construction Wage Rate Requirements—Secondary Site of Work L-2

L.4 52.225-12 Notice of Buy American Requirement-Construction Materials

Under Trade Agreements - Alternate II (Nov 2023)

L-2

L.5 52.236-27 Site Visit (Construction) – Alternate I L-2

L.6 52.252-5 Authorized Deviations in Provisions L-3

Project Title

Hoover Dam Powerplant Station Service iii

L.7 1452.233-02 Service of Protest L-4

L.8 1452.215-80 Source Selection Evaluation Procedures - Bureau of Reclamation L-4

L.9 1452.215-81 Proposal Instructions -- Bureau of Reclamation L-4

L.10 1452.233-82 Notice of Proposed Partnering - Bureau of Reclamation L-5

L.11 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line

Item - Bureau of Reclamation

L-13

SECTION M - Evaluation Factors for Award M-1

M.1 1452.215-82 Evaluation for Award -- Quality Predominance -- Bureau of

Reclamation

M-1

Project Title

Hoover Dam Powerplant Station Service iv

This page left intentionally blank

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION CALL

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

0040578511

Bureau of Reclamation

Lower Colorado Region

Regional Office 500 Fir Street

R30

Boulder City NV 89005

Max Watanga, Contract Specialist mwatanga@usbr.gov

Luis Gallardo, Contracting Officer lgallardo@usbr.gov

Maxwell Watanga 7022938045

1x 06/26/2024

140R3024R0025

INVITATION FOR BID

REQUEST FOR PROPOSAL

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

Solicitation No.: 140R3024R0025

Project Title: Hoover Dam Powerplant Station Service Replacement Boulder Canyon

Project

This solicitation is full and open/unrestricted.

This solicitation is issued as a Request for Proposals (RFP) in accordance with FAR part 15, Contracting by Negotiation.

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 852 calendar days and complete it within ________________ ________________ calendar days after receiving

F.2, FAR 52.211-10

________________________ 07/29/2024

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 12/2022)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Luis Gallardo

28. NEGOTIATED AGREEMENT 29. AWARD

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

10 U.S.C. 3204(a) 41 U.S.C. 3304(a)

STANDARD FORM 1442 (REV. 12/2022) BACK

Continued...

and return

(Contractor is not required to sign this document.) Your offer on this

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R3024R0025

00010 Hoover Dam Powerplant Station Service Replacement

Boulder Canyon Project

(Schedule CLINs A-1 - A-29 and B-1 - B-9)

See Section B.1 Schedule of Supplies/Services

Product/Service Code: Z2MD

Product/Service Description: REPAIR OR ALTERATION

OF EPG FACILITIES - HYDRO

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Table of Contents Solicitation No.

Project Title

Hoover Dam Powerplant Station Service

Replacement Boulder Canyon Project

Section B – Supplies or

Services and Prices/Costs

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Canyon Project

Page B-1

CONTINUATION OF

SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 THE REQUIREMENT

(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.

(b) Offerors are cautioned to carefully review the proposal submission requirements contained in Section

L.9. Failure to comply with these requirements may result in a proposal being determined unacceptable.

(c) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.

(1) Offerors shall complete Price Schedules A and B. Offers for less than the total of Price Schedules A and B will be considered nonresponsive and will not be evaluated for award.

(2) Offers will be evaluated on the total of Price Schedules A and B.

(d) Offerors shall complete the schedule(s) in Section B and Request for Proposals, SF-1442.

(e) Quantities in the Price Schedules are estimated quantities for comparison of offers only. Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.

(f) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for

Mobilization and Preparatory Work Schedule Line Item.”

(g) Definitions:

(1) CLIN – Contract Line Item Number

B.2 PRICE SCHEDULE

PRICE SCHEDULE A

CLIN Section Supplies or Services Quantity and

Unit

Unit

Price

Amount

A-1 WBR

1452.232-

Mobilization and Preparatory

Work

For the lump sum of $

A-2 01 33 26 Electrical Drawings and Data –

DSA

For the lump sum of $

A-3 01 33 26 Electrical Drawings and Data –

DSB

For the lump sum of $

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Canyon Project

Page B-2

PRICE SCHEDULE A

CLIN Section Supplies or Services Quantity and

Unit

Unit

Price

Amount

A-4 01 33 26 Electrical Drawings and Data –

DSC

For the lump sum of $

A-5 01 33 26 Electrical Drawings and Data –

DSD

For the lump sum of $

A-6 01 33 26 Electrical Drawings and Data –

DSN

For the lump sum of $

A-7 01 33 26 Electrical Drawings and Data –

Panelboards

For the lump sum of $

A-8 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSA

For the lump sum of $

A-9 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSB

For the lump sum of $

A-10 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSC

For the lump sum of $

A-11 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSD

For the lump sum of $

A-12 26 05 04 Demolition and Removal of

Unit Substation Electrical

Equipment and Cable - DSN

For the lump sum of $

A-13 26 05 04 Demolition and Removal of

Panelboards and Circuit

Breakers

For the lump sum of $

A-14 26 05 20 Conductors and Cables – 2/C –

8 AWG

1,250 lin ft $ $

A-15 26 05 20 Conductors and Cables – 5/C –

10 AWG

1,600 lin ft $ $

A-16 26 05 20 Conductors and Cables – 12/C

– 12 AWG

2,000 lin ft

A-17 26 05 20 Cable Testing For the lump sum of $

A-18 26 16 14 Secondary Unit Substation –

DSA

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page B-3

PRICE SCHEDULE A

Unit

Unit

Price

Amount

A-19 26 16 14 Secondary Unit Substation –

DSB

For the lump sum of $

A-20 26 16 14 Secondary Unit Substation –

DSC

For the lump sum of $

A-21 26 16 14 Secondary Unit Substation –

DSD

For the lump sum of $

A-22 26 16 14 Secondary Unit Substation –

DSN

For the lump sum of $

A-23 26 16 14 Secondary Unit Substation –

Differential Relays

For the lump sum of $

A-24 26 16 14 Secondary Unit Substation –

Spare Parts

For the lump sum of $

A-25 26 16 14 Secondary Unit Substation –

Maintenance Equipment

For the lump sum of $

A-26 26 20 10 Temporary Power Equipment For the lump sum of $

A-27 26 24 16 Panelboards For the lump sum of $

A-28 26 24 16 Circuit Breakers For the lump sum of $

A-29 26 32 36 New Resistive Load Bank and

Removal of Existing

TOTAL FOR PRICE SCHEDULE A $_________________

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page B-4

PRICE SCHEDULE B

Unit

Unit

Price

Amount

B-1 26 05 20 Conductors and Cables – 1/C -

1/0 AWG

432 lin ft $ $

B-2 26 05 20 Conductors and Cables – 1/C –

2/0 AWG

216 lin ft $ $

B-3 26 05 20 Conductors and Cables – 1/C –

3/0 AWG

432 lin ft $ $

B-4 26 05 20 Conductors and Cables – 1/C –

4/0 AWG

432 lin ft $ $

B-5 26 05 20 Conductors and Cables – 1/C –

250 MCM

1080 lin ft $ $

B-6 26 05 20 Conductors and Cables – 1/C –

300 MCM

3576 lin ft $ $

B-7 26 05 20 Conductors and Cables – 1/C –

350 MCM

1800 lin ft $ $

B-8 26 05 20 Conductors and Cables – 1/C –

400 MCM

864 lin ft $ $

B-9 26 05 20 Conductors and Cables – 1/C –

600 MCM

216 lin ft $ $

TOTAL FOR PRICE SCHEDULE B $_________________

TOTAL FOR PRICE SCHEDULES A and B $_________________

END OF SUPPLIES OR SERVICES AND PRICES/COSTS

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page B-5

Section C – Supplies or

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page C-1

SECTION C – DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK

C.1 STATEMENT OF WORK/SPECIFICATIONS

The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities

(except as otherwise specified) to perform the requirement specified in the Statement of Work, Specifications, Drawings and Photographs contained in Attachment Nos. 1 – 7 of this solicitation.

Section C – Description and Specifications

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page C-2

This page intentionally left blank.

Section D – Packaging and Marking

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page D-1

SECTION D – PACKAGING AND MARKING

(There is no additional information in this section)

Section D – Packaging and Marking

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page D-2

Section E – Inspection and Acceptance Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page E-1

SECTION E – INSPECTION AND ACCEPTANCE

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior Acquisition

Regulations (DIAR) clauses: https://www.acquisition.gov/diar

In addition, clauses can be identified as follows:

FAR - by the number prefix 52, e.g. 52.252-01, etc.; and

The following referenced clauses are hereby incorporated into and made a part of this contract.

Clause Title Date

52.246-12 Inspection of Construction AUG 1996 https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/diar

Section E – Inspection and Acceptance Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page E-2

Section F – Deliveries or

Performance

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder Canyon

Project

Page F-1

SECTION F – DELIVERIES OR PERFORMANCE

F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition

Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior

Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar

DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.

The following referenced clauses are hereby incorporated into and made a part of this contract.

52.211-13 Time Extensions SEP 2000

52.211-18 Variation in Estimated Quantity APR 1984

52.242-14 Suspension of Work APR 1984

52.247-34 F.O.B Destination NOV 1991

The Variation in Estimated Quantity clause shall be applicable to the estimated quantities in the price schedule of any task orders issued under this contract.

F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND

COMPLETION OF WORK

APR 1984

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 28 months after receipt of the NTP. The time stated for completion shall include final cleanup of the premises.

Section F – Deliveries or

Performance

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder Canyon

Project

Page F-2

This page intentionally left blank

Section G – Contract

Administration Data

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page G-1

SECTION G – CONTRACT ADMINSTRATION DATA

G.1 1452.201-70 AUTHORITIES AND DELEGATIONS-

DEPARTMENT OF THE INTERIOR

SEPT 2011

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.

The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The

COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.

Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.

(c) The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor's right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The

Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the

COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the

Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting

Officer's response issued under paragraph (e) of this clause.

(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph

(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page G-2

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.

G.2 WBR 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S

AUTHORITIES AND LIMITATIONS--BUREAU OF

RECLAMATION

MAY 2018

(a) Performance of the work under this contract shall be subject to the technical direction of the

Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:

(1) Inspecting and accepting or rejecting work performed under the contract.

(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the

Contractor on all technical matters relating to the contract. The COR will supervise or oversee all

Government technical and administrative personnel assigned to assist the COR.

(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.

(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.

(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting

Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -

(1) Constitutes a direction of additional work outside the Contract requirements;

(2) Constitutes a change as defined in the contract clause entitled “Changes;”

(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;

(4) Changes any of the expressed terms, conditions or specifications of the contract; or

(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.

(d) All technical direction shall be issued in writing by the COR.

(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the

COR in the manner prescribed by this clause and within its authority under the provisions of this clause.

If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page G-3 direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -

(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or

(2) Advise the Contractor that the Government will issue a written change order.

(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”

G.3 DOI-AAAP-0028 V3 ELECTRONIC INVOICING AND PAYMENT

REQUIREMENTS – INTERNET PAYMENT

PLATFORM (IPP)

APR 2013

Payment requests must be submitted electronically through the U. S. Department of the Treasury's

Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the

Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4

Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice: NONE

However, the contractor must submit an electronic copy of the IPP invoice along with copies of certified payroll to the Contract Specialist at mwatanga@usbr.gov for approval before the invoice is submitted into

IPP.

The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone

(866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

G.4 DOI-AAAP-0050 V3 NOTICE TO CONTRACTORS—CONTRACTOR

PERFORMANCE ASSESSMENT REPORTING

SYSTEM

DEC 2015

https://www.ipp.gov/ https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page G-4

1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts.

The Department of the Interior (DOI) has implemented the Contractor Performance Assessment

Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for

Government use in evaluating past performance as part of a source selection action.

3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

a) Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.

b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

c) All information provided should be reviewed for accuracy prior to submission.

d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the

Evaluation”.

e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date).

The contractor neither signed nor offered comment in response to this assessment."

6) The following guidelines apply concerning your use of the past performance evaluation:

a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.

b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page G-5

7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.

8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

G.5 WBR 1452.242-80 POSTAWARD CONFERENCE - BUREAU OF RECLAMATION JUL 1993

(a) Prior to the Contractor starting work, a post award conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project

Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.

(b) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the requirement. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.

(c) The Contractor shall include any associated costs for attendance at the conference in its offer.

G.6 CONTRACTOR’S ADMINISTRATION PERSONNEL

Name: _____________________________

Address: ____________________________

City/State/Zip: _______________________

Telephone No.: ______________________

Fax No.: ____________________________

Email: _____________________________

Contractor must complete and submit with proposal.

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page G-6

Section H – Special

Contract Requirements

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page H-1

SECTION H – SPECIAL CONTRACT REQUIREMENTS

(There is no additional information in this section.)

Section H – Special

Contract Requirements

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page H-2

Section I – Contract

Clauses

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page I-1

SECTION I – CONTRACT CLAUSES

I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition

Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior

Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar

DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.

The following referenced clauses are hereby incorporated into and made a part of this contract:

52.202-1 Definitions JUN 2020

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees MAY 2014

52.203-6 Restrictions on Subcontractor Sales to the Government JUN 2020

52.203-7 Anti-Kickback Procedures JUN 2020

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price or Fee Adjustment for Illegal or Improper Activity MAY 2014

52.203-12 Limitation on Payments to Influence Certain Federal Transactions JUN 2020

52.203-13 Contractor Code of Business Ethics and Conduct JUN 2020

52.203-14 Display of Hotline Poster(s) JUN 2020

52.203-17 Contractor Employee Whistleblower Rights NOV 2023

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

JAN 2017

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018

52.204-14 Service Contract Reporting Requirements OCT 2016

52.204-23 Prohibition on Contracting for Hardware, Software, and Services

Developed or Provided by Kaspersky Lab and Other Covered Entities

DEC 2023

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment

NOV 2021

52.204-27 Prohibition on ByteDance Covered Application JUN 2023

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment

NOV 2021

52.209-9 Updates of Publicly Available Information Regarding Responsibility

Matters

OCT 2018

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOV 2015

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page I-2

52.210-1 Market Research NOV 2021

52.215-2 Audit and Records--Negotiation JUN 2020

52.215-8 Order of Precedence--Uniform Contract Format OCT 1997

52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--

Modifications

AUG 2011

52.215-12 Subcontractor Cost or Pricing Data JUN 2020

52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications JUN 2020

52.215-18 Reversion or Adjustment for Plans for Postretirement Benefits Other than Pensions

JULY 2005

52.215-19 Notification of Ownership Changes OCT 1997

52.215-21 Alt IV Requirements for Certified Cost or Pricing Data and Data Other Than

Certified Cost or Pricing Data--Modifications - Alternate IV (Oct

2010)

NOV 2021

52.219-8 Utilization of Small Business Concerns FEB 2024

52.219-9 Alt II Small Business Subcontracting Plan – Alternate II (NOV 2016) SEP 2023

52.219-16 Liquidated Damages-Subcontracting Plan SEP 2021

52.219-28 Post-Award Small Business Program Rerepresentation FEB 2024

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation MAY 2018

52.222-6 Construction Wage Rate Requirements AUG 2018

52.222-7 Withholding of Funds MAY 2014

52.222-8 Payrolls and Basic Records JUL 2021

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) MAY 2014

52.222-12 Contract Termination--Debarment MAY 2014

52.222-13 Compliance with Construction Wage Rate Requirements and Related

Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility MAY 2014

52.222-21 Prohibition of Segregated Facilities APR 2015

52.222-26 Equal Opportunity SEP 2016

52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015

52.222-34 Project Labor Agreement MAY 2010

52.222-37 Employment Reports on Veterans JUN 2020

52.222-40 Notification of Employee Rights Under the National Labor Relations

Act

DEC 2010

52.222-50 Combating Trafficking in Persons OCT 2020

52.222-54 Employment Eligibility Verification OCT 2015

52.222-55 Minimum Wages Under Executive Order 13658 NOV 2020

52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017

52.223-2 Affirmative Procurement of Biobased Products Under Service and

Construction Contracts

SEP 2013

52.223-3 Alt I Hazardous Material Identification and Material Safety Data (Jan 1997)

- Alternate I (Jul 1995)

FEB 2021

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page I-3

52.223-6 Drug-Free Workplace MAY 2001

52.223-9 Estimated of Percentage of Recovered Material Content for EA

Designated Items Alt I (May 2008)

MAY 2008

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and

Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While

Driving

JUN 2020

52.225-13 Restrictions on Certain Foreign Purchases FEB 2021

52.227-1 Authorization and Consent JUN 2020

52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement JUN 2020

52.227-4 Patent Indemnity--Construction Contracts DEC 2007

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance--Work on a Government Installation JAN 1997

52.228-11 Individual Surety - Pledges of Assets FEB 2021

52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014

52.228-14 Irrevocable Letter of Credit NOV 2014

52.228-15 Performance and Payment Bonds--Construction JUN 2020

52.228-17 Individual Surety-Pledge of Assets (Bid Guarantee) FEB 2021

52.229-3 Federal, State, And Local Taxes FEB 2013

52.229-12 Tax on Certain Foreign Procurements—Notice and Representation FEB 2021

52.230-2 Cost Accounting Standards JUNE 2020

52.232-5 Payments Under Fixed-Price Construction Contracts MAY 2014

52.232-17 Interest MAY 2014

52.232-23 Assignment of Claims MAY 2014

52.232-27 Prompt Payment for Construction Contracts JAN 2017

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013

52.232-40 Providing Accelerated Payments to Small Business Subcontractors MAR 2023

52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991) MAY 2014

52.233-3 Protest After Award AUG 1996

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-14 Availability and Use of Utility Services APR 1984

52.236-15 Schedules for Construction Contracts APR 1984

52.236-17 Layout of Work APR 1984

Solicitation No.

140R3024R0025

Project Title

Hoover Dam Powerplant Station

Service Replacement Boulder

Page I-4

52.236-21 Alt I Specifications and Drawings for Construction – Alternate I (APR

1984)

FEB 1997

52.236-26 Preconstruction Conference FEB 1995

52.237-2 Protection of Government Buildings, Equipment, and Vegetation APR 1984

52.242-5 Payments to Small Business Subcontractors JAN 2017

52.242-13 Bankruptcy JUL 1995

52.243-4 Changes JUN 2007

52.243-6 Change Order Accounting APR 1984

52.244-6 Subcontracts for Commercial Products and Commercial Services FEB 2024

52.246-21 Alt I Warranty of Construction - Alternate I (Apr 1984) MAR 1994

52.248-3 Value Engineering--Construction OCT 2020

52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price)

(Apr 2012) - Alternate I (Sep 1996)

APR 2012

52.249-10 Default (Fixed-Price Construction) APR 1984

52.253-1 Computer Generated Forms JAN 1991

1452.201-70 Authorities and Delegations - Department of the Interior SEP 2011

1452.203-70 Restrictions on Endorsements - Department of the Interior JUL 1996

1452.204-70 Release of Claims - Department of the Interior JUL 1996

1452.215-70 Examination of Records by the Department of the Interior APR 1984

1452.236-70 Prohibition Against Use of Lead-Based Paint - Department of The

Interior

JUL 1996

I.2 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY

ACT ORDERS—PROHIBITION

DEC 2023

(a) Definitions. As used in this clause—

Covered article, as defined in 41 U.S.C. 4713(k), means—

(1) Information technology, as defined in 40 U.S.C. 11101, including cloud computing services of all types;

(2) Telecommunications equipment or telecommunications service, as those terms are defined in section 3 of the Communications Act of 1934 ( 47 U.S.C. 153);

(3) The processing of information on a Federal or non-Federal information system, subject to the requirements of the Controlled Unclassified Information program (see 32 CFR part 2002); or

(4) Hardware, systems, devices, software, or services that include embedded…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .