Amendment_0005_to_140R2024R0015_0005.pdf

PDF 11 MB Posted

Attached to
Reclamation - Interior Region 10 California - Grea
Solicitation number
140R2024R0015
Issued by

About this file

This request cannot be fulfilled because while the file metadata has been provided showing this is Amendment 0005 to solicitation 140R2024R0015 for the B.F. Sisk Dam SOD Modifications Phase II project by the Bureau of Reclamation, the actual content of the amendment document is not available in the provided text to summarize.

View the file

Other files

File Type Posted
Sol_140R2024R0015_Amd_0006.pdf PDF
Amendment_0006_to_140R2024R0015_0006.pdf PDF
Attachment_8_-_Past_Performance_Data_Form_0006.xlsx XLSX spreadsheet
Sol_140R2024R0015_Amd_0005.pdf PDF
Sol_140R2024R0015_Amd_0004.pdf PDF
Amendment_0004_to_140R2024R0015_0004.pdf PDF
Att__19_Questions_and_Answers_0004.pdf PDF
Sol_140R2024R0015_Amd_0003.pdf PDF
Amendment_0003_to_140R2024R0015_0003.pdf PDF
Amendment_0002_to_140R2024R0015_0002.pdf PDF
Sol_140R2024R0015_Amd_0002.pdf PDF
Attachment_14_-_Virtual_Presentation_3DEC24_0001.pdf PDF
Attachment_15_-_In_Person_Sign_In_4DEC24_0001.pdf PDF
Attachment_16_-_In_Person_Agenda_4DEC24_0001.pdf PDF
Sol_140R2024R0015_Amd_0001.pdf PDF
Amendment_0001_to_140R2024R0015_0001.pdf PDF
Attachment_13_-_Virtual_Site_Visit_Attendance_3DEC24_0001.pdf PDF
Attachment_17_-_Price_Schedule_in_Excel_0001.xlsx XLSX spreadsheet
Attachment_7_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_11_-_Offeror_Responsibility_Information.doc DOC document
Sol_140R2024R0015.pdf PDF
140R2024R0015.pdf PDF
Attachment_10_-_Corporate_Experience_and_Management.docx DOCX document
Attachment_5_-_General_Decision_Number_CA20240018__18OCT24.pdf PDF
Attachment_6_-_Subcontracting_Plan.docx DOCX document
Attachment_8_-_Past_Performance_Data_Form.xlsx XLSX spreadsheet
Attachment_9_-_Key_Personnel.docx DOCX document
Attachment_4_-_Release_of_Claims.pdf PDF
Attachment_12_-_Electronic_Proposal_Submission.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R2024R0015 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815

R20

Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation

11/12/20240005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

11/12/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

A. TITLE: B. F. Sisk Dam SOD Modifications, Phase II

B. PURPOSE: The purpose of this amendment is to incorporate various changes to solicitation documents.

C. DESCRIPTION: This amendment hereby incorporates the following:

1) Revised Contract Section C:

Remove Specification 01 83 13 Project Monitoring and replace with Specification 01 83 13

Project Monitoring, Amendment 0005.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R2024R0015/0005

Remove and Replace the following Drawings:

Remove Drawing 805-D-60206 rev. 1 and replace with Drawing 805-D-60206 rev. 2

Remove Drawing 805-D-60207 and replace with

Drawing 805-D-60207 rev. 1

Remove Drawing 805-D-60212 and replace with

Drawing 805-D-60212 rev. 1

Remove Drawing 805-D-60213 and replace with

Drawing 805-D-60213 rev. 1

2) Remove Section J Attachment 5, General

Decision Number CA20240018 dated December 20, 2024, and replace with Section J Attachment 5, General Decision Number CA20250018 dated January

10, 2025, Amendment 0005

3) Section J Attachment 19 - Offeror's Questions and Answers #80 to #86.

4) The proposal due date remains unchanged.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

B. F. Sisk Dam SOD Modifications, Phase II Amendment No. 0005 San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No. 20-C0940

Project Monitoring

01 83 13 - 1

SECTION 01 83 13

PROJECT MONITORING

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Project Monitoring:

1. Payment: Lump sum price offered in the Price Schedule.

a. Includes installation of 7 cameras, maintenance, data storage and transmittal, removal, and training.

b. Payment of the lump sum price offered will be made incrementally throughout the duration of the contract and will not be paid in full until completion of the contract.

1.02 REFERENCE STANDARDS

A. Institute of Electrical and Electronic Engineers (IEEE)

1. IEEE C2-2007 National Electric Safety Code (NESC)

B. National Electrical Manufacturer’s Association (NEMA)

1. NEMA 250-2008 Enclosures for Electrical Equipment

C. National Fire Protection Association, Inc. (NFPA)

1. NFPA 70 – 2020 National Electrical Code (NEC)

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 – Submittals.

B. RSN 01 83 13-1, Qualifications:

1. Experience and portfolio documentation.

C. RSN 01 83 13-2, Installation Plan and Instructions:

1. Plans and manufacturer’s instructions.

D. RSN 01 83 13-3, Digital or Hard Drive Copy:

1. Archived still images.

E. RSN 01 83 13-4, Streaming Video and Time Lapse Video.

1. Digital format with a minimum 1080p resolution.

San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No. 20-C0940

01 83 13 - 2

F. RSN 01 83 13-5, Project Monitoring Permanent Record.

1. All project web camera documentation of photographic documentation and video documentation.

1.04 PERFORMANCE REQUIREMENTS

A. Provide equipment necessary to make system complete and operational.

B. Provide software essential for the system to meet functional requirements.

C. Monitoring system to accommodate the following:

1. Cameras:

a. Programmed limit stop to limit the pan range of the camera to the construction limits as shown on the drawings.

b. Continuously monitor the project site from 6:00 a.m. to 8:00 p.m. daily Monday through Sunday. Hours may be adjusted to meet Contractor’s working activities.

c. Live, streaming adjustable view camera footage of selected areas of the construction site, including still image captures and time lapse video capabilities.

2. Monitoring inclusive of electronic indexing, navigation, hosting, storage, and remote access, as applicable, throughout the duration of the contract.

3. Contractor support, security of information and technological requirements related to the documentation.

D. In-house programming division for customizable documentation solutions required.

E. Contractor responsible for project monitoring shall be able to respond to site visit requests with qualified personnel within 24 hours of notice.

1.05 QUALIFICATIONS

A. Minimum experience of 5 years in operation third party digital photography construction documentation using advanced indexing/navigation systems.

B. Proficiency in the execution of digital photography, videography, and web camera systems’ configuration, including use and knowledge of associated equipment.

C. Portfolio of completed construction projects of similar type, size, duration, and complexity as this project.

D. Minimum of 3 references, if requested.

San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No. 20-C0940

01 83 13 - 3

1.06 DELIVERY, STORAGE, AND HANDLING

A. Handle and store equipment in accordance with manufacturer’s instructions. Include copy of these instructions with equipment at time of shipment.

PART 2 PRODUCTS

2.01 PAN/TILT/ZOOM (PTZ) CAMERAS

A. Seven cameras shall be used to continuously monitor construction. Locations will include Basalt Hill Quarry, Borrow Area 12/14, Borrow Area 20/21, SW165 berm, and 2 at NVS/SVS berm, as determined by the COR.

B. Auto-focus including positioning and manual focus adjustment as required for all web cameras, optimization of camera setup for available bandwidth and lighting at the Internet connection source and camera location(s) and configuration of pre-sets and bounds for Pan-Tilt-Zoom web cameras.

C. Web camera service to include automated remote monitoring of web camera functionality, notification of lost connectivity and follow-up by network technicians.

D. Outdoor camera:

1. Type: Heavy Duty.

2. Number of Pixels: 1200 x 800.

3. Mount Type: Pendant.

4. Installation pole; Wiring; Mount.

5. Enclosed.

6. Operating Temperature: -20 degrees Fahrenheit to 140 degrees Fahrenheit.

7. Power supply: wired or battery with solar battery backup system.

8. Connectivity: Capable of wired ethernet, wireless ethernet and cellular modem web camera connections. Web camera service to include delivery of cameras and all related equipment.

9. Wireless component, for wireless connection web cameras.

10. For cellular connection web cameras:

a. Modem; Modem bracket; Antenna.

11. Additional/Optional equipment or components as required to complete installation and expressly agreed.

12. Provide additional equipment not specified in these specifications but necessary to make the system complete and operational.

San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No. 20-C0940

01 83 13 - 4

E. Web camera streams and associated still images and time lapse records shall be accessible on-line using an Internet connection.

1. Shall be capable of multiple-user access, simultaneously, on-line and be capable of stream re-broadcasting for unlimited concurrent users, under most usage conditions.

2. Access shall adhere to industry standards for information security and protection of data.

3. Multi-tiered access levels shall be achievable through use of individual passwords, if applicable.

4. Users will be able to identify other authorized users on each project.

5. Only Government employees associated with this project shall have access to the streaming, or documentation.

6. Contractor shall not have access to the streaming or documentation (e.g., downloadable record).

F. Web camera streams and associated still images and time lapse records shall be accessible via the same location as digital photographic documentation for the Project, if applicable.

G. Provide centralized access to all web cameras’ live image streams.

H. Online interface to allow users to comment privately on projects and static images captured from web camera live image streams.

1. These images and reports shall be made available through PDF and a standalone link.

2. Images or reports shall be identified by time, date, location, and include associated comments that can be archived indefinitely.

3. The administrator can restrict commenting functions.

4. Commenting permissions, per user, can be set to either (1) read/write, (2) read only or (3) no read/no write permissions at the option of the administrator.

I. Mobile Access:

1. Documentation that is accessible online through an Internet connection shall be accessible via mobile devices, such as tablets and smart phones, in a format optimized for mobile viewing and navigation.

2. Mobile access shall be supported for at least the following mobile operating systems: Apple iOS, Android OS, Windows Phone, and Blackberry OS.

San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No. 20-C0940

01 83 13 - 5

PART 3 EXECUTION

3.01 INSTALLATION

A. In accordance with manufacture’s recommendations.

B. Make all connections to place the monitoring system into operations.

C. Coordinate locations of the seven PTZ cameras with COR so as not to impact Contractor’s construction activities.

1. Elevated/overhead vantage point is preferable.

D. Finish installing all PTZ cameras at least 5 days prior to beginning of construction of each feature of the project.

E. Remove all PTZ cameras and furnish cameras to the Government upon completion of work under this contract.

F. Web Camera Documentation:

1. Transposing (moving), or Pan-Tilt-Zoom, web cameras will be set up to provide:

a. Three hundred and sixty degree (360º) horizontal panning.

b. Approximately two hundred and twenty degree (220º) vertical tilting.

c. Twenty times (20 x) magnification optical zoom capabilities.

2. Web camera Internet connections properly configured and verified at set up of each web camera:

a. A dedicated, wired DSL or cable Internet connection with a Client-procured Static, Public IP address will be configured and verified for all web cameras using a wired Internet connection.

b. A 5.8 GHZ wireless router shall be added to a wired Internet connection setup for all web cameras using a wireless Internet connection.

c. Any wireless antennas required to transmit an optimal image stream shall be incorporated into the connection setup.

d. Once fully configured, verify each connection.

e. A standalone cellular modem with a Contractor-provided cellular service connection shall be configured and verified for all web cameras using a cellular Internet connection.

3. Live image streams from each configured web camera shall be hosted and accessible 24 hours per day, 7 days per week at the specifications of:

a. Image stream resolution of 1200 x 800.

b. Streamed at speeds of 1 to 6 frames per second via direct/wired or wireless DSL or cable connection, dependent on available on-site bandwidth.

San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No. 20-C0940

01 83 13 - 6

c. Streamed at speeds of 6 frames per second to 4 frames per minute via cellular connection, dependent on available cellular bandwidth.

4. A hosted and restricted functionality display page shall be provided for the live image stream of each web camera. Web camera service includes provisions for embedding into the Government’s website the live image stream of each web camera.

5. Web camera service includes access to all web cameras’ live image streams and static images via mobile device, with optimization for small screen, touch-enabled devices (such as smart phones and tablets).

6. Static images captured and archived from each web camera’s live image stream at 15-minute intervals during onsite work. Integrated commenting and tagging of static images to allow for isolation of issues for report generation.

7. Time lapse videos created and archived from the images captured by each web camera’s live image stream beginning at the sixtieth (60th) day of active hosting for the web camera’s image stream. Update time lapse videos on a weekly basis.

8. Integration and insertion into the navigation structure of online digital photographic documentation for the Project, allowing the live image streams and documentation to be accessed and stored in the same “place,” if applicable.

3.02 TRAINING

A. Provide training, at the project site, competent instructors to instruct Government personnel in system operations, hardware and software; all that related to the web camera system within 3 days after the cameras are fully operational.

B. Training shall be a minimum of four hours in duration and shall include maximum of six trainees for local Government personnel.

C. Coordinate the date and time with COR.

D. Location: B. F. Sisk Field Office; details to be provided by COR.

3.03 CONTRACTOR SUPPORT, HOSTING, CLIENT ACCESS, CLIENT USAGE

RIGHTS, AND CONTRACTOR DELIVERABLES

A. All on-line domain/web hosting, industry standard security measures and redundant server back-up of the documentation are furnished by Contractor for the duration of the contract.

B. Any software required for all indexing, navigation, hosting, and remote access furnished by Contractor (excepting web browsers), including user license.

C. Contractor furnishes technical support related to using the system or service, including site visits when required and/or requested.

San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No. 20-C0940

01 83 13 - 7

D. Contractor must be able to create off-line or stand-alone (on-site) version of documentation platform required by this specification, if requested by COR.

E. Streaming video feed shall be encrypted in accordance with the state-of-the-practice.

1. Access to video feed shall require password protection.

F. Upon completion of the Project, final copies of the documentation (the “Permanent Record”) shall be provided in a digital media format. On-line access terminates upon delivery of the Permanent Record or as agreed between Contractor and Government.

Intellectual property rights associated with the digital media prepared in direct service of the project shall transfer, along with the media itself, to Government.

1. Monitoring Documentation: The Permanent Record, which includes all static image captures and time lapse videos, and recorded videos shall be provided, typically as a DVD or hard drive.

2. Digital format to meet electronic file requirements in Section 01 33 00 - Submittals.

END OF SECTION

San Luis Unit, West San Joaquin Division, Central Valley Project, California Specifications No. 20-C0940

01 83 13 - 8

This page intentionally left blank.

C

B

A

N

""' __ _ --- Riprap stockpile area, see Note 6

Borrow Area 20 & 21 PLAN 0 300

600'

I

3 4

LEGEND

Contractor use

Borrow/Quarry Area

Aquatic Resource

Existing Unpaved Road for Contractor Use

Existing Paved Road

Top of active conservation

Government Property

------- Ephemeral drainage/Ditch

----<>--------- Wildlife Exclusion Fencing

-oa,-oa,-oo,- Overhead Power Line

--�--m•-- Buried Water Line

-UGC-UGC-u<.e- Underground Communications

�-� Underground Fiber Optic cu.., Power Pole

1.

2.

3.

4.

5.

6.

7.

8.

9.

NOTES

For general notes, see (60201).

Kiosk at entrance to San Luis Reservoir State Recreation Area shall be protected.

Reservoir water available from designated locations, as approved by COR.

Existing material processing structures shall be protected. Refer to specifications.

Refer to specifications for Borrow Area 20 and 21 availability.

Riprap shall be stockpiled in this area. Refer to specifications.

Refer to specifications for Tule Elk requirements.

Wildlife exclusion fencing shall be installed to existing steel posts and maintained to prevent wildlife passage into construction areas or onto access roads. Location shown is outside of Contractor Use area on drawings for ease of portrayal. Refer to specifications.

Underground telecommunications line is inactive and shall be abandoned and removed before excavation of borrow area commences.

10. Power lines, poles, and towers to be protected in accordance with specifications.

rm - BUREAU OF -

� RECLAMATION

1-w

LL

(f) z :r:

_J

€If, RANDLE REED

£SIGNED

RANDLE REED

RAWN

JAMES OLSEN

'HECKED

Olsen James A P.E.

TECH. APPR,

Rudkin Caleb C P.E.

PPROVED

:E u.:

a:i

ADHJNAl'fflOVAL- S�PfTWS(JfyCM/l:fl9H1/!!'r

DENVER, CO

I 0..

vi' z ti::

::E

Cl

2024-11-04

SITE USE

BORROW AREAS 20 & 21

PLAN

805-D-60206

SHEET 4 OF 6

Specifications No. 20-C0940

D

C

B

A

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

E.

,3

,2

N. 1,829,000

E.

,3

,0

N. 1,829,000

OHP

OHP

O H

P O

H P

O H

P O

H P

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP OHP OHP OHP OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

O H P

O H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP OHP OHP OHP

E.

,3

,7

N. 1,832,600

Government Property

Private Property

NOTES

1. For general notes, see (60201).

2. Refer to specifications for landslide stabilization requirements along access road.

3. Wildlife exclusion fencing shall be installed to existing steel posts and maintained to prevent wildlife passage into construction areas or onto access roads near ponds. Location shown is outside of Contractor Use area on drawings for ease of portrayal. Refer to specifications.

4. Zone 2A is a processed, 3-inch minus gravel product used in previous construction phase.

5. Power lines, poles, and towers to be protected in accordance with specifications.

6. Updated aerial imagery appended to existing imagery to reflect existing conditions of partially-depleted Borrow Area 14 after previous construction phase. Grid shown has no technical significance.

East Basalt Hill Quarry Haul Road

BASALT HILL QUARRY AND ACCESS PLAN

Contractor use

Aquatic Resource

Existing Unpaved Road for Contractor Use

Top of active conservation

Government Property

Ephemeral drainage/Ditch

Overhead Power Line

Buried Water Line

Underground Communications

Underground Fiber Optic

Borrow/Quarry Area

Power Pole

WTR WTR

UGC UGC UGC

UGFO UGFO UGFO

OHP OHP OHP

LEGEND

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2s C A D

F

IL

EN

A M

E

LA

S T

S A V

ED

D A

TE

-0 1-

LA

S T

S A V

ED

B Y

R R

EE

D

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

W

ES

T S A N

J O

A Q

U

IN

D

IV

IS

IO

N

B

F.

S

IS

K D

A M

S O

D M

O D

IF

IC

A

TI

O N

S

PH

A S E

II

SITE USE

BASALT HILL QUARRY

PLAN

DENVER, CO

805-D-60207

2024-11-04

0 600'300'

West Basalt Hill Quarry Haul Road

See Note 2

Basalt Hill Quarry

Existing Zone 10 Stockpile

Existing Dirty Zone 2A Stockpile, see Note 4

Existing Zone 2A Stockpile, see Note 4

Existing Riprap Stockpile

Existing Scoria waste

Willow Springs Pond, see Note 3

Basalt Quarry Pond, see Note 3

See Note 3

See Note 5

5-

D -6

-R D

-2 .D

W G

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL -

RANDLE REED

RANDLE REED

JAMES OLSEN

Olsen, James A P.E.

Rudkin, Caleb C P.E.

Supervisory Civil Engineer

See Note 6

See Note 6

See Note 6

R el ea se d

RE

V

NO 1

/0

1/

D

Re ed

, R an dl e

C P.

E.

A dd ed W ild lif e Ex cl us io n fe nc in g al on g th e so ut h

B as al t

H ill

Q ua rr y ac ce ss r oa d

Specifications No. 20-C0940

AutoCAD SHX Text

ALWAYS THINK

AutoCAD SHX Text

SAFETY

W

TR

W

TR

W

TR

W

TR

W

TR

W

TR

WTR WTR WTR WTR

W

TR

W

TR

WTR

WTR

WTR WTR

WTR WTR

WTR

WTR

WTR WTR

WTR

WTR

WTR

WTR WTR

W

TR

WTR WTR

W

TR

WTR WTR WTR WTR

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

OHP

OHP

OHP

80090

E.

,3

,5

N. 1,833,000

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

O H P

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

W

TR

W

TR

W

TR

W

TR

W

TR

W

TR

W

TR

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP

W

TR

W

TR

W

TR

W

TR

W

TR

W

TR

W

TR

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC UGC

UGC

UGC

UGC

UGC UGC

UGC UGC UGC UGC

UGC

UGC

UG

C

UG

C

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC

UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC UGC U

G C

U G

C U

G C

U G

C U

G C

U G

C U

G C

U G

C U

G C

U G

C U

G C

U G

C U

G C

U G

C U

G C

U G

C U

G C

U G

C

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

O H

P O

H P

O H

P O

H P

O H

P O

H P

BORROW AREA 20 & 21

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2s C A D

F

IL

EN

A M

E

LA

S T

S A V

ED

D A

TE

-0 1-

LA

S T

S A V

ED

B Y

R R

EE

D

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

W

ES

T S A N

J O

A Q

U

IN

D

IV

IS

IO

N

B

F.

S

IS

K D

A M

S O

D M

O D

IF

IC

A

TI

O N

S

PH

A S E

II

SITE USE AND

TOPOGRAPHY

BORROW AREA 20 & 21

PLAN

DENVER, CO

805-D-60212

2024-11-04

0 600'300'

Existing access road

Government Property

Private Property

See Note 3

See Note 4

San Luis Reservoir

See Note 5

Existing kiosk, see Note 2

Aquatic resource area shall be protected and avoided

See Note 6

Tule Elk water troughs, see Note 7

NOTES

1. For general notes, see (60201).

2. Kiosk at entrance to San Luis Reservoir State Recreation Area shall be protected.

3. Reservoir water available from designated locations, as approved by COR.

4. Existing material processing structures shall be protected. Refer to specifications.

5. Refer to specifications for Borrow Area 20 and 21 availability.

6. Riprap shall be stockpiled in this area. Refer to specifications.

7. Refer to specifications for requirements regarding Tule Elk.

8. Wildlife exclusion fencing shall be installed to existing steel posts and maintained prevent wildlife passage into construction areas or onto access roads . Location shown is outside of Contractor Use area on drawings for ease of portrayal. Refer to specifications.

9. Underground telecommunications line is inactive and shall be abandoned and removed before excavation of borrow area commences.

10. Contractor to comply with safety requirements in accordance with specifications.

11. Power lines, poles, and towers to be protected in accordance with specifications.

Contractor use

Borrow/Quarry Area

Aquatic Resource

Existing Unpaved Road for Contractor Use

Existing Paved Road

Top of active conservation

Government Property

Ephemeral drainage/Ditch

Wildlife Exclusion Fencing

Overhead Power Line

Buried Water Line

Underground Communications

Underground Fiber Optic

Power Pole

WTR WTR

UGC UGC UGC

UGFO UGFO UGFO

OHP OHP OHP

LEGEND

See Note 11

See Note 9

Borrow Area 20, see Note 5

Borrow Area 21, see Note 5

5-

D -6

-R D

-2 .D

W G

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL -

RANDLE REED

RANDLE REED

JAMES OLSEN

Olsen, James A P.E.

Rudkin, Caleb C P.E.

Supervisory Civil Engineer

R el ea se d

RE

V

NO 1

/0

1/

D

Re ed

, R an dl e

C P.

E.

A dd ed W ild lif e Ex cl us io n fe nc in g al on g th e so ut h

B as al t

H ill

Q ua rr y ac ce ss r oa d

Specifications No. 20-C0940

AutoCAD SHX Text

ALWAYS THINK

E.

,3

,2

N. 1,829,000

E.

,3

,0

N. 1,829,000

OHP

OHP

O H

P O

H P

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP OHP OHP OHP OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

O H P

O H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

O H

P O

H P

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP OHP OHP

E.

,3

,7

N. 1,832,600

900900900900

0 800 900

120012

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2s C A D

F

IL

EN

A M

E

LA

S T

S A V

ED

D A

TE

-0 1-

LA

S T

S A V

ED

B Y

R R

EE

D

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

W

ES

T S A N

J O

A Q

U

IN

D

IV

IS

IO

N

B

F.

S

IS

K D

A M

S O

D M

O D

IF

IC

A

TI

O N

S

PH

A S E

II

SITE USE AND

TOPOGRAPHY

BASALT HILL QUARRY

PLAN

DENVER, CO

805-D-60213

2024-11-04

Government Property

Private Property

Basalt Hill Quarry

BASALT HILL QUARRY AND ACCESS PLAN

0 600'300'

Willow Springs Pond, see Note 3

Basalt Quarry Pond, see Note 3

Existing Zone 10 Stockpile

Existing Dirty Zone 2A Stockpile, see Note 4

Existing Zone 2A Stockpile, see Note 4

Existing Riprap Stockpile

Existing Scoria waste

See Note 2

East Basalt Hill Quarry Haul Road

West Basalt Hill Quarry Haul Road

See Note 3

See Note 5

NOTES

1. For general notes, see (60201).

2. Refer to specifications for landslide stabilization requirements along access road.

3. Wildlife exclusion fencing shall be installed to existing steel posts and maintained prevent wildlife passage into construction areas or onto access roads near settling ponds. Location shown is outside of Contractor Use area on drawings for ease of portrayal. Refer to specifications.

4. Zone 2A is a processed, 3-inch minus gravel product used in previous construction phase.

5. Power lines, poles, and towers to be protected in accordance with specifications.

Contractor use

Aquatic Resource

Existing Unpaved Road for Contractor Use

Top of active conservation

Government Property

Ephemeral drainage/Ditch

Overhead Power Line

Buried Water Line

Underground Communications

Underground Fiber Optic

Borrow/Quarry Area

Power Pole

WTR WTR

UGC UGC UGC

UGFO UGFO UGFO

OHP OHP OHP

LEGEND

5-

D -6

-R D

-2 .D

W G

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL -

RANDLE REED

RANDLE REED

JAMES OLSEN

Olsen, James A P.E.

Rudkin, Caleb C P.E.

Supervisory Civil Engineer

R el ea se d

RE

V

NO 1

/0

1/

D

Re ed

, R an dl e

C P.

E.

A dd ed W ild lif e Ex cl us io n fe nc in g al on g th e so ut h

B as al t

H ill

Q ua rr y ac ce ss r oa d

Specifications No. 20-C0940

AutoCAD SHX Text

ALWAYS THINK

"General Decision Number: CA20250018 01/10/2025

Superseded General Decision Number: CA20240018

State: California

Construction Types: Building, Heavy (Heavy and Dredging) and Highway

Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.

BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.75 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2025. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $13.30 per hour (or the | | | applicable wage rate listed|

Amendment No. 0005

| | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2025. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2025 1 01/10/2025

ASBE0016-004 05/01/2024

AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED,

MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS &

TOULMNE COUNTIES

AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 34.56 11.40 Area 2......................$ 36.53 9.27

ASBE0016-008 01/01/2024

AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN

FRANCISCO, SAN MATEO, SANTA CLARA, & SANTA CRUZ

AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA,

MERCED, SAN JOAQUIN, STANISLAUS, & TUOLUMNE

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 84.76 25.07 Area 2......................$ 64.56 25.07

BOIL0549-001 01/01/2021

AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA

CLARA COUNTIES

AREA 2: REMAINING COUNTIES

Rates Fringes

BOILERMAKER

Area 1......................$ 49.62 41.27 Area 2......................$ 45.60 38.99

BRCA0003-001 08/01/2023

Rates Fringes

MARBLE FINISHER..................$ 41.18 18.58

BRCA0003-003 08/01/2023

Rates Fringes

MARBLE MASON.....................$ 60.20 28.82

BRCA0003-005 05/01/2024

Rates Fringes

BRICKLAYER

( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 51.17 25.80

( 7) San Francisco, San Mateo.......................$ 57.02 28.50 ( 8) Alameda, Contra Costa, San Benito, Santa Clara.......................$ 56.94 26.28 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 52.76 25.01

(16) Monterey, Santa Cruz...$ 54.18 27.82

BRCA0003-008 07/01/2023

Rates Fringes

TERRAZZO FINISHER................$ 43.90 19.51

TERRAZZO WORKER/SETTER...........$ 59.06 28.31

BRCA0003-011 04/01/2024

AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz

AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne

AREA 3: Fresno, Kings, Madera, Mariposa, Merced

Rates Fringes

TILE FINISHER

Area 1......................$ 37.75 19.28 Area 2......................$ 34.76 19.22 Area 3......................$ 32.68 18.32 Tile Layer Area 1......................$ 59.92 22.62 Area 2......................$ 55.17 22.52 Area 3......................$ 50.28 22.05

CARP0022-001 07/01/2023

San Francisco County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold &

Steel Shoring Erector, Saw Filer.......................$ 60.54 33.52 Journeyman Carpenter........$ 60.39 33.52 Millwright..................$ 60.49 35.11

CARP0034-001 07/01/2021

Rates Fringes

Diver Assistant Tender, ROV Tender/Technician...........$ 54.10 34.69 Diver standby...............$ 60.51 34.69 Diver Tender................$ 59.51 34.69 Diver wet...................$ 103.62 34.69 Manifold Operator (mixed gas)........................$ 64.51 34.69 Manifold Operator (Standby).$ 59.51 34.69

DEPTH PAY (Surface Diving):

050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot

SATURATION DIVING:

The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.

DIVING IN ENCLOSURES:

Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.

WORK IN COMBINATION OF CLASSIFICATIONS:

Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.

CARP0034-003 07/01/2021

Rates Fringes

Piledriver.......................$ 54.10 34.69

CARP0035-007 07/01/2020

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties

Rates Fringes

Modular Furniture Installer Area 1 Installer..................$ 28.76 22.53 Lead Installer.............$ 32.21 23.03 Master Installer...........$ 36.43 23.03 Area 2 Installer..................$ 26.11 22.53 Lead Installer.............$ 29.08 23.03 Master Installer...........$ 32.71 23.03 Area 3 Installer..................$ 25.16 22.53 Lead Installer.............$ 27.96 23.03 Master Installer...........$ 31.38 23.03

CARP0035-008 08/01/2020

AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties

AREA 2: Monterey, San Benito, Santa Cruz Counties

AREA 3: San Joaquin

AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties

Rates Fringes

Drywall Installers/Lathers:

Area 1......................$ 52.65 31.26 Area 2......................$ 46.77 31.26 Area 3......................$ 47.27 31.26

Area 4......................$ 45.92 31.26 Drywall Stocker/Scrapper Area 1......................$ 26.33 18.22 Area 2......................$ 23.39 18.22 Area 3......................$ 23.64 18.22 Area 4......................$ 22.97 18.22

CARP0152-001 07/01/2020

Contra Costa County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41

CARP0152-002 07/01/2020

San Joaquin County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.92 30.82 Journeyman Carpenter........$ 46.77 30.82 Millwright..................$ 49.27 32.41

CARP0152-004 07/01/2020

Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82

Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41

CARP0217-001 07/01/2023

San Mateo County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 60.54 33.52 Journeyman Carpenter........$ 60.39 33.52 Millwright..................$ 60.49 35.11

CARP0405-001 07/01/2021

Santa Clara County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP0405-002 07/01/2021

San Benito County

Rates Fringes

Carpenters Bridge Builder/Highway

Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

CARP0505-001 07/01/2021

Santa Cruz County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

CARP0605-001 07/01/2021

Monterey County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08

CARP0701-001 07/01/2021

Fresno and Madera Counties

Rates Fringes

Carpenters

Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 47.77 31.49 Journeyman Carpenter........$ 47.62 31.49 Millwright..................$ 50.12 33.08

CARP0713-001 07/01/2021

Alameda County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08

CARP1109-001 07/01/2021

Kings County

Rates Fringes

Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 47.77 31.49 Journeyman Carpenter........$ 47.62 31.49 Millwright..................$ 50.12 33.08

* ELEC0006-004 12/01/2024

SAN FRANCISCO COUNTY

Sound & Communications Installer...................$ 57.18 3%+27.15 Technician..................$ 65.76 3%+27.15

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0006-007 06/01/2024

SAN FRANCISCO COUNTY

Rates Fringes

ELECTRICIAN......................$ 91.25 3%+45.315

ELEC0100-002 06/01/2024

FRESNO, KINGS, AND MADERA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 45.00 29.15

ELEC0100-005 12/01/2024

FRESNO, KINGS, MADERA

Rates Fringes

Communications System

Installer...................$ 45.28 28.01 Technician..................$ 52.07 28.21

SCOPE OF WORK

Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.

A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS

Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing

C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV

D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment

E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE

INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO

THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems

WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems).

Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways

(including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two

(2) conditions apply:

1. The project involves new or major remodel building trades construction.

2. The conductors for the fire alarm system are installed in conduit.

ELEC0234-001 12/25/2023

MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES

Rates Fringes

ELECTRICIAN

Zone A......................$ 65.16 29.55 Zone B......................$ 71.68 29.75

Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line

Zone B: Any area outside of Zone A

ELEC0234-003 12/01/2021

MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES

Rates Fringes

Sound & Communications Installer...................$ 47.93 24.09 Technician..................$ 55.12 24.30

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0302-001 02/27/2023

CONTRA COSTA COUNTY

Rates Fringes

CABLE SPLICER....................$ 68.92 32.67

ELECTRICIAN......................$ 61.26 32.44

ELEC0302-003 12/01/2023

CONTRA COSTA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 48.44 27.60 Technician..................$ 55.71 27.82

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0332-001 06/01/2024

SANTA CLARA COUNTY

Rates Fringes

CABLE SPLICER....................$ 100.25 46.72

ELECTRICIAN......................$ 87.17 46.33

FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.

Work on structures of 60 ft. or over (as described above):

to be paid twice the straight-time rate of pay.

* ELEC0332-003 12/01/2024

SANTA CLARA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 56.68 28.35 Technician..................$ 65.18 28.61

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access);

excluding energy management systems.

FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.

ELEC0595-001 06/01/2024

ALAMEDA COUNTY

Rates Fringes

CABLE SPLICER....................$ 84.18 3%+44.68

ELECTRICIAN......................$ 73.20 3%+44.68

ELEC0595-002 06/01/2024

CALAVERAS AND SAN JOAQUIN COUNTIES

Rates Fringes

CABLE SPLICER....................$ 59.34 3%+30.48

ELECTRICIAN

(1) Tunnel work.............$ 51.92 3%+30.48

(2) All other work.........$ 49.45 3%+30.48

ELEC0595-006 12/01/2024

ALAMEDA COUNTY

Rates Fringes

Sound & Communications Installer...................$ 56.68 3%+26.65 Technician..................$ 65.18 3%+26.65

SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .