Amendment_0001_to_140R2024R0015_0001.pdf
PDF 1 MB Posted
- Solicitation number
- 140R2024R0015
About this file
This is Amendment 0001 to solicitation 140R2024R0015 for the B.F. Sisk Dam Safety of Dams (SOD) Modifications Phase II project, issued by the Bureau of Reclamation's Mid-Pacific Region. The amendment extends the contract performance period from 1,095 to 1,350 calendar days after notice to proceed, with liquidated damages of $15,735 per calendar day for delays.
The amendment adds six new attachments to Section J: Virtual Site Visit Attendance (3DEC24), Virtual Presentation (3DEC24), In Person Site Visit Sign In Sheet (4DEC24), In Person Site Visit Agenda (4DEC24), Price Schedule in Excel format, and CAD Files (available via Kiteworks upon email request to specified contracting officials). The contractor must commence work within 7 calendar days after receiving notice to proceed and prosecute the work diligently until completion.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2024R0015 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
11/12/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/12/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. TITLE: B. F. Sisk Dam SOD Modifications, Phase II
B. PURPOSE: The purpose of this amendment is to incorporate various changes to solicitation documents.
C. DESCRIPTION: Amendment 01 Description of Changes:
1) Standard Form 1442, box 11 is revised from 1,095 to 1,350 days.
2) Section F number of days is revised from 1,095 to 1,350.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2024R0015/0001
3) Section J - New Incorporated Attachments:
Attachment 13 - Virtual Site Visit Attendance
3DEC24
Attachment 14 - Virtual Presentation 3DEC24
Attachment 15 - In Person Site Visit Sign In
Sheet 4DEC24
Attachment 16 - In Person Site Visit Agenda 4DEC24
Attachment 17 - Price Schedule in Excel
Attachment 18 - CAD Files (this attachment is available under separate cover. To request, please email Roxana Ahola at rahola@usbr.gov and cc: Abelardo (Carlos) Lopez at aclopez@usbr.gov to request the Kiteworks link.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation No.: 140R2024R0015, B. F. Sisk Dam SOD Modifications, Phase II San Luis Unit, West San Joaquin Division, Central Valley Project, California
F-1
SECTION F - DELIVERIES OR PERFORMANCE
Clause Title Date
52.211-18 Variation in Estimated Quantity APR 1984 52.236-15 Schedules for Construction Contracts APR 1984
52.242-14 Suspension of Work APR 1984
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND APR 1984
COMPLETION OF WORK
The Contractor shall be required to
(a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 1,095 1,350 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
FAR 52.211-12 LIQUIDATED DAMAGES – CONSTRUCTION SEP 2000
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $15,735 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor’s right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Amendment 0001 rahola Cross-Out
Solicitation No.: 140R2024R0015, B. F. Sisk Dam SOD Modifications, Phase II San Luis Unit, West San Joaquin Division, Central Valley Project, California
J-1
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
Due to the large file sizes, attachments 1-3 and 18 are available under separate cover via Kiteworks. To obtain these files, please send an email to request the Kiteworks link to Roxana Ahola at rahola@usbr.gov and cc: Abelardo (Carlos) Lopez at aclopez@usbr.gov
Attachment Number
List of Documents, Exhibits, and other Attachments
Specifications
2 Drawings
3 Appendices
DI-137 -Release of Claims
5 General Decision Number: Wage Determination
6 Subcontracting Plan
7 Past Performance Questionnaire
8 Past Performance Data Form
9 Key Personnel
10 Corporate Experience and Management
11 Offeror Responsibility Information
12 Electronic Proposal Submission Instructions Kiteworks
13 Virtual Site Visit Attendance 3DEC24
14 Virtual Presentation 3DEC24
15 In Person Site Visit Sign In Sheet 4DEC24
16 In Person Site Visit Agenda 4DEC24
17 Price Schedule in Excel
18 CAD Files (See top of this page for request instructions)
Amendment 0001