140R2022R0003_Amendment_0005_0005.pdf

PDF 2 MB Posted

Attached to
New Melones Generator Rewind Federal contract opportunity
Solicitation number
140R2022R0003
Issued by
Department of the Interior Bureau of Reclamation

About this file

This solicitation requests proposals for a generator rewind project at the New Melones Powerplant. The Bureau of Reclamation seeks to rewind generators 1 and 2, which have experienced intermittent heating issues. The scope includes generator disassembly, new armature windings installation, ventilation system redesign, and reassembly. Proposals are due on June 23, 2022. The estimated price range is $20-30 million.

The solicitation requires technical, past performance, and pricing volumes. The technical proposal must include a construction schedule, narrative, and details on new equipment and manufacturing facilities. For past performance, offerors must list three relevant projects from the last 15 years and obtain performance questionnaires from references. Pricing shall be consistent with the technical approach and use the provided schedule format. The pre-proposal conference will be held virtually on April 26 and an on-site visit is scheduled for May 12. Questions are due by May 24.

View the file

Other files for this federal contract opportunity

Other files attached to New Melones Generator Rewind, newest first.
File Type Posted
140R2022R0003_Amendment_0008_0008.pdf PDF
Sol_140R2022R0003_Amd_0008.pdf PDF
Copy_of_MEP-Rewind-Ops_Data-U1_U2-Historian-06162022_0008.xlsx XLSX spreadsheet
Sol_140R2022R0003_Amd_0007.pdf PDF
140R2022R0003_Amendment_0007_0007.pdf PDF
Sol_140R2022R0003_Amd_0006.pdf PDF
140R2022R0003_Amendment_0006_0006.pdf PDF
Sol_140R2022R0003_Amd_0005.pdf PDF
140R2022R0003_Amendment_0004_0004.pdf PDF
Sol_140R2022R0003_Amd_0004.pdf PDF
Sol_140R2022R0003_Amd_0003.pdf PDF
140R2022R0003_Amendment_0003_0003.pdf PDF
140R2022R0003_Amendment_0002_0002.pdf PDF
Sol_140R2022R0003_Amd_0002.pdf PDF
Sol_140R2022R0003_Amd_0001.pdf PDF
Amendment_0001_0001.pdf PDF
Solicitation_140R2022R0003.pdf PDF
Sol_140R2022R0003.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R2022R0003 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815

R20

Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation

04/18/20220005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/18/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Legacy Doc #: BOR

A. TITLE: New Melones Powerplant Generator Rewind

B. PURPOSE: The purpose of this amendment is to incorporate 2 additional attachments in

Section J, a new Section J Table of Contents, replace part 48 13 72 of the Specifications, replace the SF 1442 to update the proposal due date, replace Section L to extend the questions due date.

C. DESCRIPTION: This amendment hereby incorporates the following:

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Erik M. Danger

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Insert Section J Att. No. 13, Amendment 0005 - Site Visit Attendance Sheet Continued ...

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R2022R0003/0005

Insert Section J Att. No. 14, Amendment 0005 -

Pre-Proposal Questions and Answers Set 2

Remove 48 13 72 - Generator Ventilation Design

Study in Section C and Replace with 48 13 72 -

Generator Ventilation Design Study, Amendment

0005 in Section C

Remove Section J Table of contents and Replace with Section J Table of Contents, Amendment 0005

Remove SF-1442 and Replace with SF-1442, Amendment 0005

Remove Section L Amendment 0003 and Replace with

Section L, Amendment 0005

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Amendment 0005 Att. No. 13

Att. No. 14

New Melones Powerplant Generator Rewinds

Pre-Proposal Questions and Answers

Question Set 2

1. Question: Are there any winding resistance records available?

Reclamation Response: The Original GE Manual states 0.00269 Ohms/phase at 75 Degrees C.

2. Question:

Specifications on past performance reads, “The offeror shall furnish a list of three projects in scope, complexity, and magnitude to the work required under the solicitation which the offeror

(not their subcontractors) have completed during the last 15 years or now has on-going. List only those contracts that are comparable in size and complexity to this solicitation. Examples of construction work is listed above in Section M.

Can we utilize the experience of our Subcontractor to satisfy this requirement of the Prime?

Reclamation response: No.

3. Question:

Specifications Section 48 13 72, Section 1.03, Clause A, states the following:

“Re-design the generator ventilation system to improve cooled air flow to the lower inner stator end winding to achieve equitable, lower stator end winding temperatures that match the temperatures of the upper sections of the stator end windings within 5 degrees C at 115 percent full load and meet ANSI Standard C50.12”.

It is requested that this be updated for the following reasons:

a. The reference to 115% load implies that the new winding will have an 115% overload rating, which conflicts with Section 48 13 71, Section 2.01, Clause A, which indicates the new winding shall have a single rating of 192,000 kVA.

b. The requirement that the lower end-windings meet ANSI Standard C50.12 is ambiguous as this standard provides stator winding temperature limits based on embedded detectors in the slot only.

c. The requirement that the lower end winding temperature be within 5 deg. C of the upper end winding implies a warranty which cannot be provided until the generator ventilation design study is completed. It is noted that reducing the absolute temperature of the lower end winding is more important than having it similar to upper end winding.

New Melones Powerplant Generator Rewinds Pre-Proposal Questions and Answers

Based on above, it is proposed to replace the Section 48 13 72, section .03, clause A text with the following:

“Re-design the generator ventilation system to improve cooled air flow to the lower inner stator end windings with an objective target of reducing observable temperatures to less than 130 deg.

C.

Reclamation response: We agree with the proposed revision. See the revised section 48 13 72.

4. Question: Section 48 13 63 paragraph 1.04 A requires “Dispose of the coatings in accordance with Section 02 83 35 – Removal and Disposal of Coatings”. Please clarify if the coatings of the exterior of the entire stator frame should be removed, and disposed.

Reclamation Response: Only remove stator coatings as necessary to perform other work. This statement of existing conditions does not require the contractor to remove coatings from the entire stator frame, only how to handle the hazardous coatings if work necessitates coating removal.

5. Question: It’s mentioned on section 48 15 63 1.04 E that “To greatest extent possible, pertinent data including bar and core drawings will be made available”. The bidder kindly requests the

Government to provide the following drawings and reports if available. Any spare will be helpful for measurement during the site visit if no drawing is available.

• Any heat run and air flow measurement reports

• The Stator core lamination and assembly drawings. If no drawing is available, the bidder request sufficient time to measure the core through an open on the stator frame barrel.

• Rotor pole component and assembly drawings. If no drawing is available, the bidder request to measure the spare rotor pole winding as shown on section 51 02 82-5 Figure 7.

• Rotor Spider

• Thrust Bracket

• Thrust runner

• Thrust bearing shoes

• Generator guide bearing shoes

• Brake Ring

With consideration of the time necessary for the bidder to evaluate the site assessment information, to develop a new winding design, to get the material/manufacturing cost estimates and to complete all the internal approval processes for a proposal to be submitted, the bidder requests the Government to extend the bid date by at minimum 4 weeks.

Pre-Proposal Questions and Answers

Reclamation Response: See Amendment 3 with responses to several of these questions and

Amendment 4 with the Unit 1 Stator Winding Temperature Evaluation Report. Available drawings are included with the solicitation and Amendment 3.

6. Question: We cordially request an extension of the due date for questions from 5-17-2022 for a minimum of 7 calendar days.

Reclamation Response: See the revised section L with the due date for questions changed from

May 17, 2022 to May 24, 2022.

Central Valley Project, California Solicitation No.

Generator Ventilation Design Study

48 13 72 - 1

SECTION 48 13 72

GENERATOR VENTILATION DESIGN STUDY

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Ventilation Design Review Study:

1. Payment: Lump sum price offered in Price Schedule A

B. Replace Generator Air Baffles:

1. Payment: Lump sum prices offered in Price Schedule A and Price Schedule B.

1.02 REFERENCE STANDARDS

A. Institute of Electrical and Electronics Engineers (IEEE)

1. IEEE C50.12-2005 Salient-Pole 50 Hz and 60 Hz Synchronous

Generators and Generator/Motors for Hydraulic

Turbine Applications Rated 5 MVA and Above

1.03 DESIGN REQUIREMENTS

A. Re-design the generator ventilation system to improve cooled air flow to the lower inner stator end windings with an objective target of reducing observable temperatures to less than 130 deg. C

1.04 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 – Submittals and 01 33 26 –

Electrical Drawings and Data.

B. RSN 48 13 72-1, Ventilation Design Review Report

1. Summarize evaluation of existing ventilation design and identify areas of deficiencies for Generators 1 and 2.

2. Provide details of the new ventilation design and proposed modifications including calculations, computer simulations reports, and other means to justify the new design.

3. Provide material of new blades, baffles, hardware and other equipment to be installed.

C. RSN 48 13 72-2, Modification Procedures

Central Valley Project, California Solicitation No.

Generator Ventilation Design Study

48 13 72 - 2

1. Provide plans and procedures for performing the ventilation modifications.

2. Provide field testing procedures.

D. RSN 48 13 72-3, Test Reports

1. Provide temperature test reports for each unit.

1.05 EXISTING CONDITIONS

A. Background:

1. The Government has been evaluating both generators for intermittent stator winding heating temperatures and alarms when the generators are at full load since its commissioning in 1979. In 1986, GE, the generator manufacturer, was brought in to redesign the generator ventilation system to bring more air circulation to the stator windings. The redesign consisted of closing the gap between the rotor rim and the air baffles so that the air could not escape through

it. The gap was reduced from 3/8-inch to 1/8-inch. However, in closing the airgaps, the rubber material used to close the air gaps caused extensive abrasion damage to the top coil of the upper and lower stator end windings, which was found and documented in 2002 and 2013. Refer to Section 51 00 20 – New

Melones Photographs, photographs 15-20.

2. The stator winding alarm and trip settings were also documented as having one set of temperatures but operated to a different set of temperatures due to manufacturer’s recommendations. In 1986, the alarm and trip settings were confirmed to meet the ANSI C50.12-1983 Standard. But the stator end winding temperature alarms continued to alarm which initiated further stator winding heating investigations.

3. The Unit 1 Stator Winding Temperature Evaluation Report dated May 23, 2002 found excessive heating in the lower winding end-turns utilizing infrared scanning. As a result, the end-turn temperatures are exceeding the observable class F insulation limit of 130 °C set by ANSI. The heating observed is not a localized problem and appears to extend around the lower portion of the unit winding. The upper end-turn area was much cooler and does not approach the 130

°C limit. Exceeding ANSI temperature limits increase the risk of an insulation failure. Failure of the insulation in the end-turn area could lead to a phase-to-phase fault in the generator, which would be very destructive.

4. Generator Unit 1 is priority due to its history of excessive heating. Both generators had their stator winding insulations tested. There is evidence of air baffle abrasion damage on the top coils of the lower and upper end windings and the neutral terminals of Generator Unit 1.

B. Existing Ventilation Design:

1. The generators receive cooled air through six air coolers spaced, which will also be redesigned as a part of this project. Currently, the cooled air comes in on top

Central Valley Project, California Solicitation No.

Generator Ventilation Design Study

48 13 72 - 3 and bottom of the stator core thru designated cavities in the stator frame and then directed to the rotor rim through the rotor rim, out the poles, and then back out of the generator thru the stator core. There is a large void where the air could have low circulation just below the lower end windings.

C. Field Testing during the Evaluation:

1. In March 1999, field testing was performed to investigate and verify the RTD operation of the stator windings of Generator Unit 1 due to the temperature alarms activating intermittently at full load. At that time, the stator winding temperature alarm was set to 105 degrees C and the stator winding temperature trip was set to

115 degrees C, per ANSI Standards. Correct operation of the RTDs was verified utilizing heat tapes to verify the temperature readings. However, the heat tapes found that there was a spread of high temperatures amongst the lower end windings throughout the generator. High temperatures were not a localized problem.

2. Due to the heat tape results of non-localized high temperatures in the end windings, in May 2000, infrared monitoring was performed where the RTDs initially read high. The generator deck plates were removed for this monitoring evaluation. In removing the upper deck plates, it may have caused an alteration in the air flow pattern, but it was determined that this effect would be small. Upper end turn testing was performed on a small section due to unit availability, but

90% of the lower end turns were monitored. The results of the thermal imaging confirmed wide-spread inner stator lower end turn high temperatures. Refer to

Section 51 48 73 – Thermal Imaging Reports. Temperatures were monitored at no-load, 50MW, 130MW, 150MW and 185MW. The highest temperature recorded was 146 degrees C near coil 90 at the 185MW level. This recorded temperature exceeds the ANSI Standard C50.12 for maximum observable insulation temperature of 130 degrees C for class F insulation.

3. While monitoring the lower end windings, it was also observed that there was very little air flow in that specific area, thus, insufficient air movement on the inside of the end winding. The winding temperatures on the outer diameter were observably lower than the inner winding temperatures and well within ANSI

C50.12 standard observable insulation temperature.

4. It was further observed that the stator frame openings are much smaller than other machines of similar size, which may affect the air flow.

5. GE’s ventilation system redesign in 1986, may have inadvertently diverted the air flow meant to cool the lower stator end turns away, when it sealed the rotor rim air shroud and the fiberglass air deflectors.

D. Stator and Field Winding Condition Assessments:

1. In Spring 2013, condition assessments were made on both units. The upper deck plates and all the fiberglass air baffles on top and bottom were removed to obtain access to the stator and field windings.

48 13 72 - 4

2. The condition assessments consisted of a ramped direct high voltage test, dielectric power factor test, partial corona probe, lights out (blackout) test, visual inspection and a review of the operating hours of both units.

3. Results of the condition assessments were that the stator windings in both units has significant thermal, electrical, mechanical, and ambient stressors and that the combination of these stressors was deteriorating the stator winding insulation and for the units to be rewound. And that Unit 1 should be given rewind priority over

Unit 2.

4. Visual inspections concluded that there was abrasion damage on most top coils in the upper and lower windings and that the neutral terminals of Unit 1 also had abrasion damage due to an ill-fitting air baffle.

5. The operating hours for these units were low in comparison to other units of similar size. This could have occurred due to the units performing above nameplate rating often and the activation of winding temperature alarms.

PART 2 PRODUCTS

2.01 MODIFICATIONS

A. Provide materials, equipment and tools necessary to perform the approved generator ventilation modifications.

B. Air Baffle design:

1. Provide new baffles and hardware of equal material or better than the existing baffles and hardware.

2. Ensure air baffle design is clear of obstructions and will not cause abrasion on adjacent equipment.

PART 3 EXECUTION

3.01 VENTILATION STUDY

A. Perform a detailed ventilation design review to determine necessary modifications to the existing ventilation and determine if other ventilation deficiencies need to be addressed.

1. Evaluate the existing generator ventilation design and identify deficiencies.

2. Re-design and provide modification recommendations to the generator ventilation system to meet ANSI Standard C50.12 maximum observable temperatures at nameplate rating of 192,000 kVA.

3. Perform necessary calculations and computer modeling of the air flow to ensure that the inner stator lower end turns do not exceed ANSI Standard C50.12 observable temperatures and do not trigger any alarms or trips while at full load.

48 13 72 - 5

3.02 VENTILATION MODIFICATIONS

A. Implement the approved ventilation system design to correct the inner stator lower end turn temperature problem in accordance with the approved recommendations and approved procedures.

3.03 CONTRACTOR FIELD TESTING

A. In addition to the generator testing required in Section 48 13 71 – New Armature

Windings, record the inner stator lower end turn temperature profile while at full load and after temperatures have stabilized:

1. Install multiple fiber-optic temperature sensors in the upper and lower stator bar end windings.

2. Monitor the stator core RTDs, ambient air and end winding surface temperatures while on-line, fully loaded, and record maximums when the temperatures have stabilized.

3. Provide corrective measures if inner stator lower end turn temperatures exceed

ANSI C50.12 maximum observable temperatures at rated nameplate.

END OF SECTION

48 13 72 - 6

This page intentionally left blank.

Solicitation 140R2022R0003 – New Melones Power Plant Generator Rewind

SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

Attachment

Number

List of Documents, Exhibits, and Other Attachments Number of

Pages

1 General Decision Number: CA20220018 71

2 Offeror Responsibility Information 4

3 Past Performance Questionnaire 4

4 Subcontracting Percentages Worksheet 9

5 DI-137 Release of Claims 1

6 Past Performance Information 2

7 MEP Rewinds Preproposal Conference Slides 37

8 MEP Rewinds Conference Attendance Sheet 3

9 Pre-Proposal Questions and Answers 6

10 Electronic Proposal Submission 1

11 New Melones Powerplant

Unit 1 Stator Winding Temperature Evaluation

12 Past Performance Information 2

13 Site Visit Attendance Sheet 1

14 Pre-Proposal Questions and Answers Set 2 3

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Bureau of Reclamation

Mid-Pacific Region

Regional Office Division of Acquisition Services

R20

2800 Cottage Way, Room E-1815

Sacramento CA 95825-1898

Bureau of Reclamation, CGB Regional Office

Attn: Matthew Thomas, Rm 1815, Federal Bld Sacramento, CA 95825-1898

Matthew Thomas 916-978-5117

1x 04/18/2022

140R2022R0003

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

A. New Melones Power Plant Generator Rewind

B. Work Site Location: Work is located at New Melones Powerplant approximately 50 miles east of Stockton, CA and 10 miles southwest of Sonora, CA in Calaveras County.

C. Site Visit Information: See Section L, FAR 52.236-27, Site Visit (Construction) -

Alt. 1.

D. Estimated Price Range: $20,000,000.00 to $30,000,000.00.

E. Set-aside Information: This requirement is an unrestricted procurement using

NAICS Code 237990 and applicable size standard $39.5 Million.

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

7 1050 calendar days and complete it within ________________ ________________ calendar days after receiving

Section F

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

a. Sealed offers in original and

06/23/2022

Amendment 0003

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

Bureau of Reclamation Mid-Pacific Region

Regional Office Division of Acquisition Services

R20

2800 Cottage Way, Room E-1815

Sacramento CA 95825-1898

Erik M. Danger

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

140R2022R0003

Section B - Supplies and Services and Prices "AU" - Activity Unit is used solely for the purposes of allowing progress payments under the Department of Interior's Financial & Business Management System (FBMS).

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

New Melones Power Plant Generator G1 Rewind

New Melones Power Plant Generator G2

00010 1 AU

Pricing Schedule A: CLIN A1-A33

Pricing Schedule B: CLIN B1-B33

Pricing Schedule C: CLIN C1-C9

Pricing Schedule D: CLIN D1-D9

See Following Continuation Page(s)

00020 1 AU

Central Valley Project Amendment 0003

Section L - Page 1 of 16

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED FEB 1998

BY REFERENCE

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/ (FAR 52.XXX-XX formatted clauses)

Provision Title Date

FAR 52.204-7 System for Award Management OCT 2018

FAR 52.204-16 Commercial and Government Entity Code Reporting AUG 2020

FAR 52.204-22 Alternative Line Item Proposal JAN 2017

FAR 52.214-34 Submission of Offers in the English Language APR 1991

FAR 52.214-35 Submission of Offers In U.S. Currency APR 1991

FAR 52.215-1 Instructions to Offerors – Competitive Acquisition NOV 2021

FAR 52.215-20 Requirements for Certified Cost or Pricing Data and

Data Other Than Certified Cost or Pricing Data

NOV 2021

52.228-17 Individual Surety – Pledge of Assets (Bid Guarantee) FEB 2021

FAR 52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED AUG 1998

IN THE GSA INDEX OF FEDERAL

SPECIFICATIONS, STANDARDS AND COMMERCIAL

ITEM DESCRIPTIONS, FPMR PART 101-29

(a) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--

GSA Federal Supply Service

Specifications Section, Suite 8100 http://www.acquisition.gov/

Central Valley Project Amendment 0003

Section L - Page 2 of 16

470 East L’Enfant Plaza SW

Washington, DC 20407

Telephone (202) 619-8925

Facsimile (202) 619-8978.

(b) If the General Services Administration, Department of Agriculture, or Department of

Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision. Additional copies will be issued for a fee.

FAR 52.216-1 TYPE OF CONTRACT APR 1984

The Government contemplates award of a firm-fixed price construction contract resulting from this solicitation.

FAR 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS- MAY 2014

SECONDARY SITE OF THE WORK

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.

FAR 52.222-23 NOTICE OF REQUIREMENTS FOR FEB 1999

AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY

FOR CONSTRUCTION

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action

Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the

Contractor’s aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for Minority Participation for

Each Trade

Goals for Female Participation for Each

Trade

Central Valley Project Amendment 0003

Section L - Page 3 of 16

Calaveras County 19.8 6.9 %

These goals are applicable to all of the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance

Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in

41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action

Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order

11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for

Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $100,000 at any tie for construction work under the contract resulting from this solicitation. The notification shall list the -

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Calaveras, California.

End of Provision

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT- MAY 2014

CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material,"

"designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled

"Buy American-Construction Materials Under Trade Agreements" (Federal Acquisition Regulation

(FAR) clause 52.225-11).

https://www.acquisition.gov/far/52.225-11#FAR_52_225_11

Central Valley Project Amendment 0003

Section L - Page 4 of 16

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers.

The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy

American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of

FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FARclause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material.

An offer based on use of the foreign construction material for which an exception was requested-

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding;

or

(ii) May be accepted if revised during negotiations.

(End of Provision)

FAR 52.228-1 BID GUARANTEE SEP 1996

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening https://www.acquisition.gov/far/52.225-11#FAR_52_225_11 https://www.acquisition.gov/far/52.225-11#FAR_52_225_11 https://www.gsa.gov/forms-library/solicitation-offer-and-award-construction-alteration-or-repair

Central Valley Project Amendment 0003

Section L - Page 5 of 16 of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds --

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

FAR 52.233-2 SERVICE OF PROTEST-DEPARTMENT SEP 2006

OF THE INTERIOR (JUL 1996) DEVIATION

(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office

(GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Erik Danger, Contracting Officer

U.S. Bureau of Reclamation

2800 Cottage Way, Room E-1815

Sacramento, California 95825-1898

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(c) A copy of the protest served on the Contracting Officer shall be simultaneously furnished by the protester to the Department of the Interior Assistant Solicitor for Procurement and Patents, 1849 C

Street, NW, Room 6511, Washington, D.C. 20240

FAR 52.236-27 SITE VISIT (CONSTRUCTION) – ALT I FEB 1995

a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and

Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors are urged and expected to inspect the site where the work will be performed.

http://www.arnet.gov/far/current/html/Subpart%2031_1.html#wp1089550

Central Valley Project Amendment 0003

Section L - Page 6 of 16

b) A virtual pre-proposal conference has been scheduled for:

Date: Tuesday, April 26, 2022

Time: 10:00 AM PST

Location: Online – Microsoft Live Event

The virtual pre-proposal conference requires registration in order to attend. Send registration requests to Mathew Thomas at mthomas@usbr.gov and Todd Dooley at tdooley@usbr.gov.

Registration request shall include names, email addresses and phone numbers for each registrant that will attend from each company/entity. Emailed invitations to the Microsoft

Live Event link will be provided to registrants prior to the virtual pre-proposal conference.

c) An organized pre-proposal site visit has been scheduled for:

Date: Thursday, May 12, 2022

Time: 10:00 AM PST

Location: New Melones Powerplant located approximately 10 miles southwest of Sonora, CA

(Details to be provided when registering)

Contractors, vendors, and visitors shall register to attend the onsite pre-proposal site visit by contacting Todd Dooley at tdooley@usbr.gov and Matthew Thomas, at mthomas@usbr.gov.

All solicitation questions shall be emailed to both Matthew Thomas (mthomas@usbr.gov) and

Todd Dooley (tdooley@usbr.gov) by close of business on Tuesday, May 24, 2022

Safety Attire/PPE’s: Hard toed boots, long sleeve shirts and pants, hand sanitizer and personal drinking water recommended. COVID-19 considerations: Comply with CDC instructions and maintain safe distances, using masks/shields when social distancing is difficult to maintain.

FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS NOV 2020

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provisions with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Department of the Interior or Bureau of Reclamation

Agency provisions with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of clause)

DIAR 1452.215-71 USE AND DISCLOSURE OF PROPOSAL APR 1984

INFORMATION—DEPARTMENT OF

THE INTERIOR

Use and Disclosure of Proposal Information—Department of the Interior (APR 1984)

(a) Definitions. For the purposes of this provision and the Freedom of Information Act (5 U.S.C.

552), the following terms shall have the meaning set forth below:

mailto:mthomas@usbr.gov mailto:tdooley@usbr.gov mailto:tdooley@usbr.gov mailto:mthomas@usbr.gov.

mailto:mthomas@usbr.gov mailto:tdooley@usbr.gov

Central Valley Project Amendment 0003

Section L - Page 7 of 16

(1) “Trade Secret” means an unpatented, secret, commercially valuable plan, appliance, formula, or process, which is used for making, preparing, compounding, treating or processing articles or materials which are trade commodities.

(2) “Confidential commercial or financial information” means any business information (other than trade secrets) which is exempt from the mandatory disclosure requirement of the Freedom of Information Act, 5 U.S.C. 552. Exemptions from mandatory disclosure which may be applicable to business information contained in proposals include exemption (4), which covers

“commercial and financial information obtained from a person and privileged or confidential,” and exemption (9), which covers “geological and geophysical information, including maps, concerning wells.”

(b) If the offeror, or its subcontractor(s), believes that the proposal contains trade secrets or confidential commercial or financial information exempt from disclosure under the Freedom of

Information Act, (5 U.S.C. 552), the cover page of each copy of the proposal shall be marked with the following legend:

“The information specifically identified on pages of this proposal constitutes trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act. The offeror requests that this information not be disclosed to the public, except as may be required by law. The offeror also requests that this information not be used in whole or part by the government for any purpose other than to evaluate the proposal, except that if a contract is awarded to the offeror as a result of or in connection with the submission of the proposal, the Government shall have the right to use the information to the extent provided in the contract.”

(c) The offeror shall also specifically identify trade secret information and confidential commercial and financial information on the pages of the proposal on which it appears and shall mark each such page with the following legend:

“This page contains trade secrets or confidential commercial and financial information which the offeror believes to be exempt from disclosure under the Freedom of Information Act and which is subject to the legend contained on the cover page of this proposal.”

(d) Information in a proposal identified by an offeror as trade secret information or confidential commercial and financial information shall be used by the Government only for the purpose of evaluating the proposal, except that (i) if a contract is awarded to the offeror as a result of or in connection with submission of the proposal, the Government shall have the right to use the information as provided in the contract, and (ii) if the same information is obtained from another source without restriction it may be used without restriction.

(e) If a request under the Freedom of Information Act seeks access to information in a proposal identified as trade secret information or confidential commercial and financial information, full consideration will be given to the offeror's view that the information constitutes trade secrets or confidential commercial or financial information. The offeror will also be promptly notified of the request and given an opportunity to provide additional evidence and argument in support of its position, unless administratively unfeasible to do so. If it is determined that information claimed by the offeror to be trade secret information or confidential commercial or financial information is not exempt from disclosure under the Freedom of Information Act, the offeror will be notified of this determination prior to disclosure of the information.

Central Valley Project Amendment 0003

Section L - Page 8 of 16

(f) The Government assumes no liability for the disclosure or use of information contained in a proposal if not marked in accordance with paragraphs (b) and (c) of this provision. If a request under the Freedom of Information Act is made for information in a proposal not marked in accordance with paragraphs (b) and (c) of this provision, the offeror concerned shall be promptly notified of the request and given an opportunity to provide its position to the Government.

However, failure of an offeror to mark information contained in a proposal as trade secret information or confidential commercial or financial information will be treated by the

Government as evidence that the information is not exempt from disclosure under the Freedom of Information Act, absent a showing that the failure to mark was due to unusual or extenuating circumstances, such as a showing that the offeror had intended to mark, but that markings were omitted from the offeror's proposal due to clerical error.

WBR 1452.215-80 SOURCE SELECTION EVALUATION PROCEDURES MAR 2021

- BUREAU OF RECLAMATION

The Government intends to evaluate proposals submitted under this solicitation and select a source for contract award without discussions (unless the contracting officer later determines discussions to be necessary) in accordance with the following provision: FAR 52.215-1

Instructions to Offerors -- Competitive Acquisition (Jan 2017). Source selection shall be in accordance with procedures contained in FAR Part 15, Department of the Interior Acquisition

Regulation (DIAR) Part 1415 (48 CFR 1415) and Bureau of Reclamation Acquisition Regulation

WBR Part 1415. These procedures are summarized as follows:

(a) Technical evaluation. A Technical Proposal Evaluation Committee has been established to objectively evaluate technical proposals in accordance with the Evaluation Factors for Award -

- Bureau of Reclamation provision of this solicitation. Technical proposals shall be submitted in accordance with the Proposal Instructions -- Bureau of Reclamation provision of this solicitation.

(b) Past performance evaluation. In addition to any other past performance information required under the solicitation, the contracting officer shall use past performance information available from the Contractor Performance Assessment Reporting System (CPARS) in the source selection process on offerors competing for awards in excess of the simplified acquisition threshold, unless the contracting officer has documented an exception from past performance consideration in accordance with FAR 15.304(c)(2)(iv).

(c) Cost or price evaluation. An objective cost or price evaluation of contract pricing proposals will be made in accordance with the Evaluation Factors for Award provision of this solicitation.

Pricing proposals shall be submitted in accordance with the Proposal Instructions -- Bureau of

Reclamation provision of this solicitation. A cost or price analysis will be performed to determine price reasonableness and any instances of unbalanced pricing, using one or more of the techniques at FAR 15.404-1.

(End of provision)

WBR 1452.215-81 PROPOSAL INSTRUCTIONS MAR 2021

- BUREAU OF RECLAMATION

This procurement will be conducted in accordance with FAR Part 15. As described in WBR

1415.209(a)(1), insert the following provision, tailored as applicable.

Central Valley Project Amendment 0003

Section L - Page 9 of 16

In addition to the requirements of the Instructions to Offerors - Competitive Acquisitions provision of this solicitation (see FAR 52.215-1), each offeror shall submit a proposal in accordance with the instructions contained in this solicitation. To submit a proposal for this requirement, offerors are required to send an email to mthomas@usbr.gov and copy edanger@usbr.gov to request access to Kiteworks (Attachment 10 – Electronic Proposal Submission) prior to the proposal due date.

(a) Use and Disclosure of Proposal Information. In accordance with the Use and Disclosure of

Proposal Information -- Department of the Interior provision of this solicitation (see DIAR 1452.215-

71), offerors shall mark trade-secret or confidential commercial or financial information contained in the proposal with the restrictive legends specified.