Attachment_3_Amendment_No_0004_0004.pdf

PDF 634 KB Posted

Attached to
FKC Middle Reach Capacity Correction Project Phase Federal contract opportunity
Solicitation number
140R2020R0009
Issued by
Department of the Interior Bureau of Reclamation

About this file

This document provides construction constraints and sequencing details for the FKC Middle Reach Capacity Correction Project Phase 1 solicitation. The project involves modifying, replacing, and relocating irrigation district delivery system pipelines that are in conflict with the new canal alignment. Submittals are required detailing the materials and connections for pipelines belonging to the Terra Bella Irrigation District, Saucelito Irrigation District, and Lower Tule Irrigation District. The contractor must also prepare a utility removal plan submittal to coordinate removing assumed abandoned pipelines that cross the existing FKC canal, including a 10-inch pipeline at station 5639+00. By January 30, 2022 the portion of the Farmland Reserve Inc. parcel between Deer Creek and E. Terra Bella Avenue must be cleared. The solicitation was issued by the Department of the Interior Bureau of Reclamation for the FKC Middle Reach Capacity Correction Project Phase 1.

View the file

Other files for this federal contract opportunity

Other files attached to FKC Middle Reach Capacity Correction Project Phase, newest first.
File Type Posted
Attachment_1_Amendment_0007_0007.pdf PDF
Attachment_9_Amendment_0006_0006.pdf PDF
Attachment_4_Amendment_0006_0006.pdf PDF
Amendment_0006_for_Solicitation_140R2020R0009_0006.pdf PDF
Amendment_0005_for_Solicitation_140R2020R0009_0005.pdf PDF
Attachment_39_Amendment_No_0005_0005.pdf PDF
Attachment_38_Amendment_No__0005_0005.pdf PDF
Attachment_31_Amendment_No__0005_0005.pdf PDF
Attachment_25_Amendment_No__0005_0005.pdf PDF
Attachment_24_Amendment_No__0005_0005.pdf PDF
Attachment_22_Amendment_No__0005_0005.pdf PDF
Attachment_21_Amendment_No__0005_0005.pdf PDF
Attachment_20_Amendment_No__0005_0005.pdf PDF
Attachment_18_Amendment_No__0005_0005.pdf PDF
Attachment_16_Amendment_No__0005_0005.pdf PDF
Attachment_13_Amendment_No__0005_0005.pdf PDF
Attachment_6_Amendment_No_0005_0005.pdf PDF
Attachment_3_Amendment_No_0005_0005.pdf PDF
Sol_140R2020R0009_Amd_0005.pdf PDF
Attachment_26_Amendment_No__0004_0004.pdf PDF
Attachment_18_Amendment_No__0004_0004.pdf PDF
Attachment_17_Amendment_No__0004_0004.pdf PDF
Attachment_11_Amendment_No_0004_0004.pdf PDF
Attachment_9_Amendment_No_0004_0004.pdf PDF
Attachment_4_Amendment_No_0004_0004.pdf PDF
Attachment_1_Amendment_No_0004_0004.pdf PDF
Sol_140R2020R0009_Amd_0004.pdf PDF
Drawing_C-302_Attachment_13_Amendment_No__0003_0003.pdf PDF
Drawing_C-208_Attachment_10_Amendment_No__0003_0003.pdf PDF
Drawing_C-207_Attachment_9_Amendment_No__0003_0003.pdf PDF
Drawing_C-206_Attachment_8_Amendment_No__0003_0003.pdf PDF
Sol_140R2020R0009_Amd_0003.pdf PDF
Drawing_GC-17_Attachment_21_Amendment_No__0003_0003.pdf PDF
Drawing_G-03_Attachment_18_Amendment_No__0003_0003.pdf PDF
Drawing_C-703_Attachment_16_Amendment_No__0003_0003.pdf PDF
Drawing_C-304_Attachment_14_Amendment_No__0003_0003.pdf PDF
Drawing_C-203_Attachment_6_Amendment_No__0003_0003.pdf PDF
Amendment_No__0003_for_Solicitation_140R2020R0009_0003.pdf PDF
Attachment_1_Amendment_No_0003_0003.pdf PDF
GC-09-REV-1_Att_4_Amendment_No__0002_0002.pdf PDF
Attachment_No__1_-_FKC_Pre-Proposal_Presentation_Slides_0002.pdf PDF
Solicitation No.140R2020R0009 Amendment No 0001_0001.pdf PDF
Sol_140R2020R0009_Amd_0001.pdf PDF
Attachment 1 - General Decision Number CA CA2021000.pdf PDF
Attachment B.1 Schedule of Prices.xlsx XLSX spreadsheet
Attachment 13 - Drawing Part 5 of 5.pdf PDF
Attachment 10 Electronic Proposal Submission.pdf PDF
Attachment 6 - RAC 15-13 Invoicing Documents.pdf PDF
Attachment 3 - Past Performance Questionnaire.pdf PDF
Solicitation 140R2020R0009.pdf PDF
Show all 50

FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No: 140R2020R0009 Specifications No. 20-C0907

CONSTRUCTION CONSTRAINTS

STANTEC/184031016 AND SEQUENCING

FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1 PAGE 01 14 00 - 17

(grouped by Irrigation District ownership) that details materials of construction and connections. All submittals shall be per Section 01 33 00 – Submittals. The detailed list per Irrigation District ownership is as follows:

a. Terra Bella Irrigation District

1) 54” Pipeline – Terra Bella Ave (DWG C-403-2)

b. Saucelito Irrigation District

1) 24” Pipeline – Ave 88 (DWG C-404-2 and C-404-3)

2) 18” Pipeline – Ave 80 (DWG C-405)

3) 14” Pipeline – Ave 80 (DWG C-405)

2. Irrigation District delivery system pipelines to be modified, replaced, and relocated at canal conflicts at the new canal. The CONTRACTOR shall provide a submittal (grouped by Irrigation District ownership) that details materials of construction and connections. All submittals shall be per Section 01 33 00 – Submittals. The detailed list per Irrigation District ownership is as follows:

a. Lower Tule Irrigation District

1) Pipeline Canal Conflict STA 5347+00 to 5360+00 (DWG C-23)

b. Saucelito Irrigation District

1) 21” Pipeline Canal Conflict STA 5665+00 to 5691+00 (DWG C-36, C- 37)

3. Irrigation pipelines (assumed to be abandoned) that cross the existing FKC and are assumed to continue east and may be in conflict with the WORK. The GOVERNMENT was not able to identify ownership and has determined these pipelines to already be abandoned in place or not authorized. Prior to removal of existing pipelines, the CONTRACTOR shall prepare a utility removal plan submittal and coordinate removal with the CONTRACTING OFFICERS REPRESENTATIVE. The following pipelines are shown to be abandoned in the Contract Documents:

a. 10” Pipeline – STA 5639+00 (DWG C-35)

1.11 ACCESS TO THE WORK AND HAUL ROUTES

A. General – All WORK on the rights-of-way necessary for access to the site shall be performed by the CONTRACTOR.

B. The CONTRACTOR shall make his own investigation of the condition of available public or private roads and of clearances, restrictions, bridge-load limits, bond requirements, and other limitations that affect or may affect transportation and ingress and egress at the jobsites. The unavailability of transportation facilities or

Attachment 3 Amendment No 0004 swolfert Text Box E. Site Clearing

1. The portion of the Farmland Reserve Inc.

parcel within the limits of work between Deer Creek and E. Terra Bella Avenue (Dwgs C-30, C-31, C-32) shall be cleared by January 30th, 2022.

swolfert Polygon swolfert Line

File details come from the government source that posted it. Updated .