Attachment_3_Amendment_No_0005_0005.pdf
PDF 717 KB Posted
- Attached to
- FKC Middle Reach Capacity Correction Project Phase Federal contract opportunity
- Solicitation number
- 140R2020R0009
About this file
This document contains a submittal register for the FKC Middle Reach Capacity Correction Project Phase 1 solicitation issued by the Department of the Interior Bureau of Reclamation. The submittal register lists over 40 submittal items required from the contractor, including approval drawings and data, certifications, engineering schedules, test reports, and final drawings for pipe, couplings, supports, gates, stoplogs, and other project components. Submittals are due prior to procurement, fabrication, installation, shipment, or within 14 to 21 days of completion of specific work activities, and the number of copies required to be provided to the Construction Engineer, Onsite Government Representative, and Government Approved Reviewer are indicated. The solicitation number for the FKC Middle Reach Capacity Correction Project Phase 1 opportunity is 140R2020R0009.
View the file
Other files for this federal contract opportunity
Show all 50
FKC Middle Reach Capacity Correction Project Phase has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No: 140R2020R0009 Specifications No. 20-C0907
Table 01 33 00A – List of Submittals *CE indicates Construction Engineer, OGR indicates Onsite Government Representative, GAR indicates Government Approved Reviewer, and FWA indicates Friant Water Authority. One hard copy of each CDMS RSN shall be sent to the CE.
STANTEC/184031016
FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1
SUBMITTALS
PAGE 01 33 00 - 30
RSN Section Title Submittals Required
Due Date or Delivery Time
Responsible Code
No. of sets to be sent to:*
CE OGR GAR FWA
33 95 50-1 PVC Pressure Piping (AWWA C900)
Approval Drawings and Data
Submitted and approved before starting associated work
GAR CDMS
33 95 50-2 PVC Pressure Piping (AWWA C900)
Certifications Submitted and approved before starting associated work
GAR CDMS
35 22 46-1 Radial Gates Engineering, Production, and Delivery Schedule
Submitted within 14 days after RSN 01 32 16-2 approval
GAR CDMS
35 22 46-2 Radial Gates Approval Drawings and Data
Submitted and approved before starting fabrication
GAR CDMS
35 22 46-3 Radial Gates Procedures and Instructions
Submitted and approved before starting fabrication
GAR CDMS
35 22 46-4 Radial Gates Factory Test Reports
Submitted and approved before shipment
GAR CDMS
35 22 46-5 Radial Gates Field Test Report Submitted within 14 days after completing tests
GAR CDMS
35 22 46-6 Radial Gates Shipping and Delivery Plans
Submitted and approved before shipment
GAR CDMS
35 22 46-7 Radial Gates Final Drawings Submitted within 21 days after completing associated work
GAR CDMS
2 1 0 0
35 22 56-1 Check Structure Stoplogs and Lifting Beam
Engineering, Production, and Delivery Schedule
Submitted within 14 days after RSN 01 32 16-2 approval
GAR CDMS
35 22 56-2 Check Structure Stoplogs and Lifting Beam
Approval Drawings and Data
Submitted and approved before starting fabrication
GAR CDMS
35 22 56-3 Check Structure Stoplogs and Lifting Beam
Operations and Maintenance Manuals
Submitted within 21 days of completing installation
GAR CDMS
2 1 1 2
Attachment 3 Amendment No 0005 swolfert Polygon
Solicitation No: 140R2020R0009 Specifications No. 20-C0907
Table 01 33 00A – List of Submittals *CE indicates Construction Engineer, OGR indicates Onsite Government Representative, GAR indicates Government Approved Reviewer, and FWA indicates Friant Water Authority. One hard copy of each CDMS RSN shall be sent to the CE.
STANTEC/184031016
FKC MIDDLE REACH CAPACITY CORRECTION PROJECT PHASE 1
SUBMITTALS
PAGE 01 33 00 - 31
RSN Section Title Submittals Required
Due Date or Delivery Time
Responsible Code
No. of sets to be sent to:*
CE OGR GAR FWA
35 22 56-4 Check Structure Stoplogs and Lifting Beam
Procedure and Certifications
Submitted and approved before starting fabrication
GAR CDMS
35 22 56-5 Check Structure Stoplogs and Lifting Beam
Shop Test Data Submitted and approved before shipment
GAR CDMS
35 22 56-6 Check Structure Stoplogs and Lifting Beam
Field Test Data Submitted within 14 days after completing tests
GAR CDMS
35 22 57-1 Turnout and Weir Stoplogs
Approval Drawings and Data
Submitted and approved before starting fabrication and installation
GAR CDMS
40 05 00-1 Piping, General Approval Drawings and Data
Submitted and approved before procurement and starting associated work
GAR CDMS
40 05 00-2 Piping, General Certifications Submitted and approved before delivery and installation
GAR CDMS
40 05 00-3 Piping, General Final Drawings Submitted within 21 days after completing associated work
GAR CDMS
2 1 0 0
40 05 06-1 Pipe Couplings Approval Data Submitted and approved before procurement and starting associated work
GAR CDMS
40 05 06-2 Pipe Couplings Certifications Submitted and approved before delivery and installation
GAR CDMS
40 05 07-1 Pipe Supports Approval Drawings Submitted and approved before starting fabrication and installation
GAR CDMS
40 05 23-1 Stainless Steel Pipe
Approval Data Submitted and approved before starting associated work
GAR CDMS
Attachment 3 Amendment No 0005 swolfert Polygon
File details come from the government source that posted it. Updated .