This document is an amendment to a solicitation for the Hungry Horse Dam Drainage Sump Pump Replacements project. The Bureau of Reclamation is seeking to replace existing drainage sump pumps at the Hungry Horse Dam. The amendment provides responses to questions from potential offerors to clarify project requirements. Key details include replacement of sump pumps and associated piping per the specifications, with surface preparation that may require removal and disposal of asbestos-containing materials and hazardous coatings. Mechanical design of the sump pump system is expected to effectively confirm the basis of design. Qualification requirements for coating applicators and inspectors are amended. The response date remains unchanged.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R1021B0008 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100

R10

Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation

12/30/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

12/30/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of amendment 001 is to address questions and to notify potential contractors of the EO 13950 Preliminary Injunction.

1. The FAR Class Deviation- Combating Race and Sex Stereotyping has been suspended, this is clause FAR 52.222-99.

2. Questions and Answers:

A) As per the 02 82 20 Specification "Include in prices offered in the Price Schedule for items requiring removal and disposal of asbestos containing materials." Please provide a current Hazardous Materials Survey.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Colby Clifford

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1021B0008/0001

Please provide a list of materials anticipated to be affected by the SOW that contain ACM.

Answer: Reference specification 02 82 20, section

1.07A.

B) Does any of the electrical Wiring affected by this SOW contain ACM?

Answer: Reference specification 02 82 20, section

1.07A.

C) Can the Onsite Supervisor and the Accredited

Asbestos Project Designer be the same individual?

Answer: The specification does not expressly prohibit a single individual as long as the individual meets the requirement qualifications of specification 02 82 20, section 1.05A, 1.05B, and 1.05C.

D) As Per Specification 02 83 33, please quantify the coatings to be removed and disposed of.

Please provide drawings with dimensions or some other means of quantifying the amount of work to be performed.

Answer: Reference Drawing 447-100-60170 Dam

Drainage Sump Pump Installation, Note 2. Surface preparation of this location may require removal of coatings in this area.

E) In regards to the Coatings to be removed. In the area where this work is to be performed, will a confined entry permit be required?

Answer: This area is not currently listed as a confined workspace, reference drawing

447-100-60170 for work area location.

F) During the remediation of the hazardous coatings is it required for CIH oversight as similar with the Asbestos removal?

Answer: Reference specification section 01 35 30

CONTRACTOR¿S ONSITE SAFETY AND HEALTH PERSONNEL

for the duties of CIH.

G) Please provide a sample of the required government format for the shop drawings required

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1021B0008/0001 as per 05 50 00 1.03.B.2

Answer: Reference specification 01 33 00, section

1.04C-6. Please see attached drawing 40-D-7102.

Electronic version will be provided to contractor after award.

H) In specification 22 00 00 102.B it references the government drawings and the contractors drawings. In subsection104 it references the need for mechanical design. The specifications also include sections 22 11 10 for the sump pump piping and section 22 14 30 which includes the basis of design for the sump pumps. Can the government please explain the expectation of the mechanical design if the government is providing the as built data, and the basis of design? What is expected if the contractor installs matching existing using the products specified?

Answer: The expectation of the mechanical design is for the contractor to effectively confirm the

Government¿s basis of design by completing the details of the sump pump system design for a functioning whole, including the specific design of the baseplate support system (Reference

Drawing 447-100-60170) for the sump pump piping.

Sections 22 11 10 are for the requirements of the sump pumps and section 22 14 30 are for the requirements of the sump pump piping.

I) In regards to Specification 09 91 00 the following qualifications are noted:

2. Coating applicator:

a. Current Coating Application Specialist (CAS) or Plural Component Application Certification

(PCAC).

b. List of not less than 3 comparable jobs for each coating type including owner¿s name, address, and telephone number.

3. Coating inspector:

a. Current Level 3 certification for NACE

Certified Coatings Inspector (CIP) or SSPC

Protective Coatings Inspector (PCI).

b. List of not less than 5 years of comparable jobs including project description, location, and owner¿s name, address, and telephone number.

Will the government please consider a more relevant level of qualifications for the approved applicator

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R1021B0008/0001

Answer: This section will be amended, please reference the attached amended specification 09

91 00.

Legacy Doc #: BOR