This document provides details regarding a federal solicitation for replacement of drainage sump pumps at Hungry Horse Dam. The Bureau of Reclamation is seeking to replace aging pumps and associated electrical equipment to maintain drainage of the dam. The scope of work includes demolishing existing pumps and installing new submersible pumps, piping, controls, and electrical components including replacement of panelboards PEB and PGB. The solicitation number is 140R1021B0008 and responses are due in accordance with the specified schedule. Relevant drawings and specifications are referenced to outline requirements. The document also includes questions and answers to provide clarification to potential offerors regarding technical aspects of the project.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R1021B0008 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Boise ID 83706-1234 1150 N. Curtis Road, Ste. 100
R10
Acquisition Management Division Regional Office Pacific Northwest Region Bureau of Reclamation
12/30/20200006
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/30/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of amendment 0006 is to post the answers to questions from contractors.
For bidders who wish to participate in the bid opening via teleconference, the call in number is: 877-953-5583 Passcode: 9362264
Questions and Answers:
1. Regarding temporary utilities, I do not see how the existing pumps can be removed without some temporary pumping capacity to handle the continuous influx of water into the basin.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Colby Clifford
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 9
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R1021B0008/0006
Answer: See section 22 14 30, 3.01.C.
The sump system existing or temporary shall remain operational during construction activities. Water flow into the dam drainage sump cannot be stopped as it is dam water seepage that is collected.
2. Can demo one to make room to work in there?
Answer: As long as the sump system remains operational per spec section 22 14 30, 3.01C the
Contractor may proceed with demo.
3. What is a typical pump-down interval?
Answer: A single pump can drain the volume of the sump in approximately 16.5 minutes. Inflow into the sump was estimated to be in a range of
5.5gal/min to 38.5gal/min based off of monthly water discharge values in 2019.
4. We need existing conduit sizes, pictures of the interiors of Panels, Routing or raceway distances.
Answer: A. Please see the reference drawings for the existing conduit sizes (447-D-997, 998, 1170, 1597, 1598, 1793, 1805, 1806 etc.)
B. Please see Photo of PGB, which is exemplary of both panels PGB and PEB.
C. Please see the attached conduit & cable schedule on this same sheet for the distance.
5. I would like to request pictures of the face of the switchgear showing DAS 3 & 18 at 3092'.
The other picture would be in the lower pump level 3055', looking up at the ceiling where our conduits have to come down from. Plans page 60170
A-A would be the reference page.
Answer: Please see the attached photos of DSA3 &
DSA18.
6. Can you please confirm the intake and discharge size of piping?
Answer: Reference drawing 447-D-1331 for existing pump configuration and drawing 447-100-60170 for new pump installations.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 9
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R1021B0008/0006
7. Also is it anticipated that one pump will have to remain functional while the other is removed and replaced?
Answer: The sump system existing or temporary shall remain operational during construction activities. Water flow into the dam drainage sump cannot be stopped as it is dam water seepage that is collected.
8. Will a temporary pump controller have to be installed to facilitate removal of the old controllers?
Answer: The sump system existing or temporary shall remain operational during construction activities. Water flow into the dam drainage sump cannot be stopped as it is dam water seepage that is collected.
9. The specifications DIVISION 02 ¿ EXISTING CONDITIONS SECTION 02 82 20 would lead the bidder to believe that Asbestos Abatement will be required, however this is not data regarding existing conditions or a scope for pre work sampling. a. Please provide the most recent asbestos survey or location, type and total pounds to be included for abatement.
b. If no direction is provided for survey or amount and type expected, please provide direction on expectations for site survey performed under this contract.
Answer: Reference Specification 02 82 20 Section 1.07A, Project Conditions.
10. The specifications DIVISION 02 - EXISTING CONDITIONS SECTION 02 83 33 would lead the bidder to believe that Lead Abatement will be required, however this is not data regarding existing conditions or a scope for pre work sampling. a.
Please provide the most recent paint containing metals survey or location, type and areas to be included for abatement.
b. If no direction is provided for survey or amount and type expected, please provide direction on expectations for site survey performed under this contract.
Answer: Reference Specification 09 91 10 Section Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 9
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R1021B0008/0006
1.06A, Project Conditions.
11. Since the area where the pump will be installed is underwater, is the government planning to stop water flow to allow the anchors to be installed?
Answer: The Government is unable to stop waterflow into the sump as water draining into the sump is water seepage through the dam.
12. Please provide the conduit schedule for lengths for replacing feeders.
Answer: See attached conduit and cable schedule.
13. Please provide the part and model numbers for the primary (DSA3) and emergency (DSA18) feeder disconnects and a picture of the front of each.
Answer: See the attached photos (Photo of DSA3 & DSA18) on this same sheet for the part & model #.
14. Could we get DWG 447-D-1171?
Answer: See attached drawing 447-D-1171.
15. Can the existing pump lower the water below elevation 3047.00?
Answer: Reference Drawing 447-D-1072. The existing sump pump intakes per the drawing are below elevation 3047.00' in the sump sink.
16. Can you verify the existing conduit that feeds from DSA to Disconnect PGF is 3" conduit, look like 2" to me. Also, any chance you can get us lengths for the wires feeding this circuit.
Answer: They are believed to be 2", for the wire length, see the attached conduit and cable schedule.
17. Same scenario for PEL, please verify the conduit is 3" feeding back to DSA, again if you can provide please wire lengths.
Answer: They are believed to be 2", for the wire length, see the attached conduit and cable schedule.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 9
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R1021B0008/0006
18. Request better photos of Existing disconnects PEL and PGF, so the conduits feeding the top of the disconnect. Again, they look like 2".
Answer: See attached photographs.
19. Plan page 60171, Left picture lists a PGP.
What is it or is this a typo?
Answer: PGP is a 480VAC breaker for automatic greasing. Please see the spec 51 00 00-3-photo 4.
20. Do we have any explosion proof classified areas (26 05 33 8, part 3 Q) is it referring to some part of this job?
Answer: HHFO is not aware of any areas designated Class 1 / Div. 1.
21. 60171, DSA 18 refers to a missing page (447-D-0909) in the bid documents. Is it important?
Answer: The bid doc includes the 447-D-909
(Station service single line diagram). Page 381 of the solicitation.
22. Who pulls out the feeder wires DSA 3 & 18 that I hear have asbestos? Can we touch the wire and disconnect it?
Answer: The contractor will be responsible for removal of feeders and pulling new feeders. An outage will need to be coordinated as live work is not permitted. Asbestos abatement will be the responsibility of the contractor, as required.
23. How long can power be out for lighting panels effected with the power changes LGT, LGS, LGC, LGB, LGA, LEC, LEA, LEB?
Answer: Power can be out for the duration of replacement of Panelboard PEB and PGB.
Replacements will need to be conducted serially, not in parallel to minimize outage times of the various areas.
24. What is the length of DSA 3 & 18?
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
6 9
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R1021B0008/0006
Answer: Please see the attached conduit & cable schedule.
25. Provide the make and model of the existing pumps so we can determine the weight.
Answer: The following is listed on the plates on the motors:
US Motors
Type:90D
Frame:526-3
15-HP
Phase 3
26. What is the average water discharge per hour?
Answer: Week of January 20th, 2019 water discharge was 84,000 gallons and pump run time was 2.8 hours for the week. Week of July 2nd, 2019 water discharge was 222,000 gallons and pump run time was 7.4 hours. Based off these values the pump discharge from the sump pumps will be approximately 500-1321 gallons per hour.
Discharge may be more due to reservoir head or other unforeseen factors.
27. The specs call out for the piping to be "ASTM A53, type E or S, carbon steel, schedule 80, galvanized", but the drawings say stainless steel. Could you confirm which is correct?
Answer: The pipe material is as listed in the spec, ASTM A53, type E or S, carbon steel, schedule 80, galvanized. See the attached amended drawings.
28. On the single line diagram (Drawing 447-D-1406) there are two switches shown-"ATS" and "Automatic Transfer Switch PEAT". Are those the two switches that we are to quote? If so, at a minimum I need voltage, # of poles, amperage, and WCR for them.
Answer: The plan 60173 and 60174 indicates that the ATS PEM will need to be replaced not PEAT.
29. Contract Drawing 447-100-60170 Section B-B shows a "High Alarm pressure Switch" @ elevation 3055.00, however the specs do not provide detail Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
7 9
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R1021B0008/0006 or an "or equal" to supply this switch. a. Please provide more details for the supply of this switch.
Answer: Reference Specification 22 14 30 Sump Pumping Systems, Section 2.02A for requirements of High Level Alarms.
30. Contract Drawing 447-100-60170 Section B-B shows a "4-port float switch connection system" just above elevation 3055.00, however the specs do not provide detail or an "or equal" to supply this connection system.
a. It is industry standard that the pump suppliers provide the controls to include the floats along with wiring harness that terminates directly to the pump control box.
i. The pump suppliers do not have an off-shelf system as described on the plans.
ii. The pump suppliers do not recommend a connection for the floats to be made in that area due to possible failures.
iii. The specs provide no details for a custom switch, no ratings, type or an "or equal".
b. Please provide a specification for the supply or allow for direct termination into the pump panel at elevation 3135.00.
Answer: The design intent of the "4-port float switch connection system" is to eliminate the need to replace full length float switch cables from elevation 3055.00' to the control box at elevation 3135.00'. By having a float port or junction box at the 3055.00' elevation the float switches for each of the pumps can be tied in or spliced at this level. If a float switch should fail or be faulty at some point in the future, Hungry Horse personnel can easily replace the short float section of cable and float from the port at elevation 3055.00' to the float location in the sump. The specs do not have "or equal" in this instance to allow the contractor flexibility in choosing components to make the float system work. Please reference 22 14 30 Section 2.01 Sump Pumping Units and also 22 00 00 Basic Mechanical Requirements for requirements of Sump System Design.
31. When we turn off DSA 3 or 18 feeders, it will Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
8 9
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R1021B0008/0006 affect at least 3 other lighting panel boards.
How do they want us to address that, how long can they be down?
Answer: DSA 3 & DSA 18 will only be deenergized one at a time. People working in the dam will need to have portable/battery powered lighting.
The Lighting Panels can be deenergized for the duration of the PEB/PGB Panel replacements. The outages will need to be coordinated with Operations.
32. Specs call out grounding bushings and conduit seals on each conduit end. Only one of them can occupy the end of the conduit. Which one?
Answer: Grounding bushings and conduit seals on each conduit is typical/common installation for the application and per industry standards.
33. Is there an asbestos study that includes the old feeder wires?
Answer: No.
34. "The scope calls out for the new pump feeders that leave the new panelboards PGB and PEB to be in a 2" conduit to the PEM. The plans show 1" conduits in the tunnel.
a. How long are those runs of 1" that have to be upsized to 2" for the new 3#1/0, #6 grd.
b. Can we have pictures of where those 1¿ conduits connect to PGB and PEP
c. Our notes show there are no 1" conduits coming into the PGB and PEB, where is the transition from pump chamber 1" to 2" in the panelboards"
Answer: Regarding the 1" conduit shown in drawing
447-D-1793, HHFO assume the run of the 1" conduit to be 150' for bidding purposes. Actual length to be field verified. The picture isn't available, it needs field verification.
35. Is there drawings illustrating the control wiring for the ATS, and makes it cycle?
Answer: The drawing isn't available. The new ATS will be designed per the drawings and specifications.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
9 9
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R1021B0008/0006
36. We are having problems finding panelboard manufacturers that will make a panelboard (PGB, PEB) and a separate disconnect (PGF,PEL) to fit inside the concrete opening shown on 447-D-998, Detail F. Can we supply a main breaker for PGB and PEB instead?
Answer: The equipment choice was based on the operation/maintenance needs and arc flash study.
The disconnect switch's size has been updated to
225A from 400A.
Legacy Doc #: BOR
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
From To Size Length(ft) No.Condu ctor Size PCP SumpPump Motor1 2" 175 4 3#4, 1#8G PCP SumpPump Motor2 2" 175 4 3#4, 1#8G
PEM PCP 2" 5 4 3#1/0, 1#6G
PEB PEM 2" 150 4 3#1/0, 1#6G
PGB PEM 2" 150 4 3#1/0, 1#6G
DSA18 PEB - 600 4 3#250, 1#4G
DSA3 PGB - 600 4 3#250, 1#4G
PEB FMC904 2" 5 4 3#6, 1#10G
PGB FMC804 2" 5 4 3#6, 1#10G
CONDUIT CABLE
*Note - The length of the Cable/Conduit is approximate.
Length(ft)
Hungry Horse Dam Drainage Sump Pump System Replacement Hungry Horse Project, Montana Amendment No. 006
Equipment Disconnect Switch (Revised) 26 28 23 - 2
PART 2 PRODUCTS
2.01 NON-FUSIBLE DISCONNECT SWITCH
A. Provide Heavy duty, Non fusible, Single Throw Safety Switches by SquareD, or equivalent, with the following minimum characteristics:
B. Type: Non-fused, 225A Continuous, Heavy-duty industrial, Single-throw switches.
C. Number of Poles: 3.
D. Enclosure: NEMA 250, Type 12.
E. Switch Voltage Rating: 600 volts, 60 Hz.
F. Short Circuit Withstand Rating: Minimum 18 kA
G. Switch Current Rating: 225 amperes.
1. Operation of disconnect rated for full load switching.
H. Switch Mechanism/Handle:
1. Switch Operating Mechanism: Made from steel, with no plastic parts.
2. Switch Operating handle:
a. Integral part of the switch enclosure. Use of cover as disconnect device is not acceptable.
b. Made from steel, with no plastic parts other than handle grip.
c. Have provisions for padlocking in the OFF position.
I. Switch Cover Interlock:
1. Prevent unintentional opening of switch cover when switch is ON.
2. Prevent closing switch with switch cover open.
J. Current Carrying Parts: Plated to resist corrosion.
K. Disconnect switch conform to NEMA KS 1 and UL listed.
L. Engraved Nameplates:
1. Conform to drawing 40-D-6234 using type A material and 1/2-inch lettering.
2. Engraving:
a. Panel PGB: “PGB Service Disconnect”.
b. Panel PEB: “PEB Service Disconnect”.
Hungry Horse Dam Drainage Sump Pump System Replacement Hungry Horse Project, Montana Amendment No. 006
Drawings (Revised) 52 00 00 - 3
Table 52 00 00A - List of Drawings
Sheet No.
Drawing No. Title
General:
1 447-100-60168 Location Map & Sheet Index
Mechanical:
2 447-100-60169 Mechanical Equipment – Dam Drainage Sump Pump Demolition
3 447-100-60170 Mechanical Equipment – Dam Drainage Sump Pump Installation (Revision 2)
Electrical:
4 447-100-60171 Electrical – Demolition Single line Diagram
5 447-100-60172 Electrical – Demolition 480V Power System Single-line Diagram
6 447-100-60173 Electrical – Installation 480V Power System Single-Line Diagram (Revision 1)
7 447-100-60174 Electrical - Installation Sump Pump System Single-Line Diagram
8 447-100-60175 Electrical – Sump Pump Room Plan and Elevation View
9 447-100-60176 Electrical – Panel Board Schedule for PEB & PGB
10 447-100-60177 Electrical - Details
Information Drawings:
11 447-D-336 Hungry Horse Dam – Gallery Drainage Pump Sump, Chamber and Adit
12 447-D-388 Hungry Horse Dam – Pump Chamber-Shaft and Adit- Block17 Metalwork, Frame-Support-List of Parts
13 447-D-397 Pump Chamber-Shaft and Adit – Block 17 Metalwork Installation
14 447-D-399 Pump Chamber-Shaft and Adit – Block 17 Metalwork Angles - Covers
15 447-D-400 Pump Chamber-Shaft and Adit – Block 17 Metalwork Frame-Gratings-Ladder
16 447-D-909 Station Service Single-Line Diagrams
Photo of Conduit Pipe
Photos of DSA3 and DSA18
Photos of DSA3 and DSA18
Photo of DSA10 Tie Breaker
Photo of PGB
Photo of PGF
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
Juan Luna
Rey Leija
Juan Luna
Christensen, David P.E.
Hovde, Jay B Jay B Hovde
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
Managing
LAR M TA IOCE N
W in theWa estter
HU
NG
RY
H
O
RS
E
PR
O
JE
CT
HU
NG
RY
H
O
RS
E D
AM
D
RA
IN
AG
E
SU
M P
PU
M
P
RE
PL
AC
EM
EN
T
MECHANICAL EQUIPMENT
DAM DRAINAGE SUMP
PUMP INSTALLATION
BOISE, ID
447-100-60170
2020-06-18
Au to
CA
D R el . 2
3.
0s
7-
0-
T1
6_
.D
W G
JU
NE
, 2
9:
RL
EI
JA
SECTION A-A
SCALE OF FEET
21 0 1 3 4 5 6 7 8
Existing embedded connection pipe to Ø30" discharge lineEl. 3135.00
El. 3055.00
El. 3047.00
El. 3053.75 El. 3053.00
El. 3052.00
El. 3047.25
Install new pipe fittings and assembly to 30" embedded connection pipe
Install new submersible pump assembly x2
Install new float switches at these elevations
A A
Install new fittings and pipe assembly
Locate and install new controls as shown. See Drawing -60175
Install new 4" galvanized steel pipe, 10 ft. sections
Install new 4-port float switch connection system as shown Section B-B
4-port float switch connection system
3'-0"
El. 3055.00
SECTION B-B
SCALE OF FEET
21 0 1 3 4 5 6 7 8
B
B
Install new conduit for submersible sump pump wiring
Note 1
Install new support structure and access hatch for submersible pumps. Use galvanized grating as listed in specification
447-100-60175
ELECTRICAL
PUMP ROOM & ELEVATION
2X - 4" Check valves
4-port float switch connection system
To control box
Flange connection to upper control room
Flange
2X - 1" Drain valves for maintenance
Flexible high pressure hose to relieve pump base mounts from weight of flanged pipe
High Alarm pressure switch
Fl ow
Fl ow
4" Pipe stabilizing wall brackets
New mobile A-Frame crane with chain hoist
New mobile A-Frame crane with chain hoist
Install new support structure and grating to accommodate new piping system and crane access
Install new base assembly for pipe support
El. 3044.00 Pump base mounts.
Anchor per manufacturer's instructions
REFERENCE DRAWING
LIST OF DRAWINGS
INDEX SHEET
4" Pipe stabilizing wall brackets
Install new base assembly for sump pump pipe support x2
447-100-60168
447-100-60169
MECHANICAL EQUIPMENT
DAM DRAINAGE SUMP PUMP DEMOLITION
447-100-60170
MECHANICAL EQUIPMENT
DAM DRAINAGE SUMP PUMP INSTALLATION
Install new conduit, hangers, and anchors for submersible pump wiring
SCALE OF FEET
21 0 1 3 4 5 6 7 8
SCALE OF FEET
21 0 1 3 4 5 6 7 8
SUMP PUMP FLOOR
(Formerly Adit-Block 17)
PLAN VIEW - El. 3055.00
SUMP PUMP ELECTRICAL ROOM
(Formerly Pump Chamber)
PLAN VIEW - El. 3135.00
Install new conduit for submersible sump pump wiring
El. 3130.00
Note 2
NOTES:
1. Install sump pump guide rails just below grating.
2. After demolition and prior to installation of new wall mounted electrical components, paint walls and ceiling to match original two tone style. End new paint at opening to adit with a clean, vertical, and straight border.
Ø30" discharge line
-0
2-
B O
IS
E, ID
C hr is te ns en
D av id
R
EV
IS
ED
T O
R
EN
D
IT
IO
N
C O
R R
EC
TL
Y
-0
2-
B O
C ha ng ed pi pe m at er ia l f ro m s ta in le ss s te el t o ga lv an iz ed s te el C H
R
IS
TE
N
S
EN
D
A V
ID
P .E
R el ea se d
5 5
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
Wally Beck & Darim Yi
Rey Leija
Wesley Johnson
Johnson, Wesley D P.E.
Hovde, Jay B Jay B Hovde
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
Managing
LAR M TA IOCE N
W in theWa estter
HU
NG
RY
H
O
RS
E
PR
O
JE
CT
HU
NG
RY
H
O
RS
E D
AM
D
RA
IN
AG
E
SU
M P
PU
M
P
RE
PL
AC
EM
EN
T
ELECTRICAL INSTALLATION
480V POWER SYSTEM
SINGLE-LINE DIAGRAM
BOISE, ID
447-100-60173
2020-06-19
Au to
CA
D R el . 2
3.
1s
7-
0-
3-
RD
-1 .D
W G
FE
BR
UA
RY
, 2
3:
RL
EI
JA
CONTROLLED
CONTROLLED
-0
2-
B O
Jo hn so n, W es le y
D P
.E
R ev is ed
K ey
N ot e an d eq ui pm en t
R el ea se d
AutoCAD SHX Text 3ph-750KVA
AutoCAD SHX Text
2400-480V GND Y
AutoCAD SHX Text
KSD
AutoCAD SHX Text
KSC
AutoCAD SHX Text
2400-480V GND Y
AutoCAD SHX Text 3ph-750KVA
AutoCAD SHX Text
BOARD DSA
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
3/C-250 MCM
AutoCAD SHX Text
DAM #2
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
3/C-250MCM
AutoCAD SHX Text
DAM #1
AutoCAD SHX Text
%%UKEY NOTES
AutoCAD SHX Text
1. REPLACE 200 AMP PLUG WITH 250 AMP PLUG AND CHANGE CIRCUIT BREAKER SETTINGS PER TSC REPLACE 200 AMP PLUG WITH 250 AMP PLUG AND CHANGE CIRCUIT BREAKER SETTINGS PER TSC RECOMMENDATIONS. COORDINATE WITH COR AND HHD. 2. INSTALL NEW FEEDER FROM DSA-3 TO NEW DISCONNECT SWITCH, PGF AND DSA-18 TO NEW DISCONNECT INSTALL NEW FEEDER FROM DSA-3 TO NEW DISCONNECT SWITCH, PGF AND DSA-18 TO NEW DISCONNECT SWITCH, PEL THROUGH EXISTING CONDUIT. USE 250MCM WITH A 4 AWG GND. 3. INSTALL NEW 600V/3P/225A NON FUSED DISCONNECT SWITCHES, PGF AND PEL DRAWINGS AND INSTALL NEW 600V/3P/225A NON FUSED DISCONNECT SWITCHES, PGF AND PEL DRAWINGS AND SPECIFICATION 26 28 23. INSTALL NEW FEEDER FROM THE PGF TO THE NEW PGB PANEL AND INSTALL PEL TO THE NEW PEB PANEL. 4. INSTALL NEW PANEL, PGB AND PEB PER THE DRAWINGS AND SPECIFICATIONS ON THE EXISTING CONCRETE INSTALL NEW PANEL, PGB AND PEB PER THE DRAWINGS AND SPECIFICATIONS ON THE EXISTING CONCRETE RECESSED WALL. THE DIMENSION OF THE WALL IS APPROX. 48"H X 66"W X 9"D. CONTRACTOR FIELD VERIFY THE EXACT SIZE AND CONFIGURATION OF THE EXISTING CONCRETE RECESSED WALL WITH THE EMBEDDED CONDUITS. PROVIDE CUSTOMIZED PANEL IF OFF THE SHELF PANEL ISN'T AVAILABLE. REFER TO SHEET 447-100-60176 FOR PANEL SCHEDULE. 5. INSTALL NEW FEEDERS FROM PANEL, PGB TO NEW ATS, PEM AND PANEL, PEB TO NEW ATS, PEM THROUGH INSTALL NEW FEEDERS FROM PANEL, PGB TO NEW ATS, PEM AND PANEL, PEB TO NEW ATS, PEM THROUGH EXISTING CONDUIT. USE 1/0 AWG WITH A 6 AWG GND. 6. INSTALL NEW 480V/3P/150A AUTOMATIC TRANSFER SWITCH (ATS), PEM PER THE DRAWINGS AND INSTALL NEW 480V/3P/150A AUTOMATIC TRANSFER SWITCH (ATS), PEM PER THE DRAWINGS AND SPECIFICATIONS. 7. INSTALL NEW SUMP PUMP CONTROL SYSTEM PER DRAWINGS AND SPECIFICATIONS. FOR MORE DETAIL, REFER INSTALL NEW SUMP PUMP CONTROL SYSTEM PER DRAWINGS AND SPECIFICATIONS. FOR MORE DETAIL, REFER TO SHEET 447-100-60174. 8. REMOVE CIRCUIT BREAKER DISCONNECT FMC 804 AND FMC 904. INSTALL NEW FEEDERS FROM PANEL, PGB REMOVE CIRCUIT BREAKER DISCONNECT FMC 804 AND FMC 904. INSTALL NEW FEEDERS FROM PANEL, PGB TO IT'S EXISTING LOAD AND PEB TO IT'S EXISTING LOAD THROUGH EXISTING CONDUIT PER PANEL BOARD DIRECTORY FOR PGB AND PEB. USE 6 AWG WITH A 10 AWG GND. MODIFY RACEWAY AS REQUIRED. 9. ADD A HEATER FOR EACH PANEL BOARD, PEB AND PGB PER MANUFACTURER'S RECOMMENDATIONS FOR ADD A HEATER FOR EACH PANEL BOARD, PEB AND PGB PER MANUFACTURER'S RECOMMENDATIONS FOR DAMP LOCATION. REUSE THE EXISTING 120VAC HEATER CIRCUIT.
AutoCAD SHX Text
480V BUS NO.1
AutoCAD SHX Text
480V BUS NO.2
AutoCAD SHX Text
DSA1
AutoCAD SHX Text
DSA2
AutoCAD SHX Text
1200AP
AutoCAD SHX Text
200AP
AutoCAD SHX Text
DSA3
AutoCAD SHX Text
DSA4
AutoCAD SHX Text
DSA5
AutoCAD SHX Text
DSA6
AutoCAD SHX Text
DSA7
AutoCAD SHX Text
DSA8
AutoCAD SHX Text
DSA9
AutoCAD SHX Text
DSA10
AutoCAD SHX Text
DSA11
AutoCAD SHX Text
DSA12
AutoCAD SHX Text
DSA13
AutoCAD SHX Text
DSA14
AutoCAD SHX Text
DSA15
AutoCAD SHX Text
DSA16
AutoCAD SHX Text
DSA17
AutoCAD SHX Text
DSA18
AutoCAD SHX Text
DSA19
AutoCAD SHX Text
DSA20
AutoCAD SHX Text
1200AP
AutoCAD SHX Text
250AP
AutoCAD SHX Text
200AP
AutoCAD SHX Text
600AP
AutoCAD SHX Text
200AP
AutoCAD SHX Text
200AP
AutoCAD SHX Text
400AP
AutoCAD SHX Text
300AP
AutoCAD SHX Text
250AP
AutoCAD SHX Text
300AP
AutoCAD SHX Text
300AP
AutoCAD SHX Text
200AP
AutoCAD SHX Text
250AP
AutoCAD SHX Text
600AP
AutoCAD SHX Text
200AP
AutoCAD SHX Text
250AP
AutoCAD SHX Text
200AP
AutoCAD SHX Text
1200AP
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
3-1/C-600MCM
AutoCAD SHX Text
3 SETS OF
AutoCAD SHX Text
AND 1/C-250MCM
AutoCAD SHX Text
3-1/C-600MCM
AutoCAD SHX Text
3 SETS OF
AutoCAD SHX Text
AND 1/C-250MCM
AutoCAD SHX Text (447-D-909)
AutoCAD SHX Text
USA-4
AutoCAD SHX Text
USA-8
AutoCAD SHX Text
PGF
AutoCAD SHX Text
PEL
AutoCAD SHX Text
EL. 3092
AutoCAD SHX Text
SPARE
AutoCAD SHX Text M
AutoCAD SHX Text
MHA
AutoCAD SHX Text
NSB
AutoCAD SHX Text
MSF
AutoCAD SHX Text
MSA
AutoCAD SHX Text
MSC
AutoCAD SHX Text
PJB
AutoCAD SHX Text
NSA
AutoCAD SHX Text
MSB
AutoCAD SHX Text
MSE
AutoCAD SHX Text
MSD
AutoCAD SHX Text
MSD
AutoCAD SHX Text
PP EL
AutoCAD SHX Text
%%UGENERAL NOTES
AutoCAD SHX Text 20A
AutoCAD SHX Text 15A
AutoCAD SHX Text 150A
AutoCAD SHX Text 40A
AutoCAD SHX Text 30A
AutoCAD SHX Text
PGB
AutoCAD SHX Text (447-D-1598)
AutoCAD SHX Text 480V/3P/4W/225A Panelboard
AutoCAD SHX Text
FMC804
AutoCAD SHX Text
PEB
AutoCAD SHX Text (447-D-1597)
AutoCAD SHX Text 480V/3P/4W/225A Panelboard
AutoCAD SHX Text
FMC904
AutoCAD SHX Text
LGA
AutoCAD SHX Text
LGB
AutoCAD SHX Text
LGC
AutoCAD SHX Text
LEA
AutoCAD SHX Text
LEB
AutoCAD SHX Text
LEC
AutoCAD SHX Text
ATS
AutoCAD SHX Text M
AutoCAD SHX Text
EL. 3129
AutoCAD SHX Text
EL. 3113
AutoCAD SHX Text
LGU
AutoCAD SHX Text
LGT
AutoCAD SHX Text
LGS
AutoCAD SHX Text
PEF
AutoCAD SHX Text
PEE
AutoCAD SHX Text
PET
AutoCAD SHX Text
PGD
AutoCAD SHX Text
PGE
AutoCAD SHX Text
PGR
AutoCAD SHX Text
LEAC
AutoCAD SHX Text
LEAA
AutoCAD SHX Text
LEAB
AutoCAD SHX Text
EL. 3135
AutoCAD SHX Text
PEM
AutoCAD SHX Text 30A
AutoCAD SHX Text M
AutoCAD SHX Text 60A
AutoCAD SHX Text M
AutoCAD SHX Text 150A
AutoCAD SHX Text
REFERENCE DRAWING
AutoCAD SHX Text DAM POWER DISTRIBUTION SINGLE LINE DIAGRAM . . . . . . . . . . . . . . . . . . . . 447-D-1406
AutoCAD SHX Text PANELBOARDS LEA, LEB, LEC, AND PEB DETAILS . . . . . . . . . . . . . . . . . . . . . . . . .447-D-1597
AutoCAD SHX Text PANELBOARDS LGA, LGB, LGC, AND PGB DETAILS. . . . . . . . . . . . . . . . . . . . . . . . . .447-D-1598
AutoCAD SHX Text PANELBOARD PGB 460-VOLT WIRING DIAGRAM . . . . . . . . . . . . . . . . . . . . . . . 447-D-1805
AutoCAD SHX Text BLOCKS 18&19-EL.3113.50 ELECTRICAL INSTALLATION RECESS DETAILS. . . . . . . . . . .447-D-998
AutoCAD SHX Text PANELBOARD PEB 460-VOLT WIRING DIAGRAM . . . . . . . . . . . . . . . . . . . . . . . 447-D-1806
AutoCAD SHX Text BLOCKS 18&19-EL3113.50 TO EL.3240.00 ELECTRICAL INSTALLATION EMBEDDED CONDUIT . . . . . . . . 447-D-997
AutoCAD SHX Text STATION SERVICE SINGLE-LINE DIAGRAM . . . . . . . . . . . . . . . . . . . . .447-D-909
AutoCAD SHX Text BLOCKS 14&15-EL.3105.00 TO EL.32400.00 ELECTRICAL INSTALLATION EMBEDDED CONDUIT . . . . . . . .447-D-1170
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text
3/C-250MCM
AutoCAD SHX Text
3/C-250MCM
AutoCAD SHX Text 2,4
AutoCAD SHX Text 1,3
AutoCAD SHX Text 6,8,10
AutoCAD SHX Text 5,7
AutoCAD SHX Text 11,13,15
AutoCAD SHX Text 12,14,16
AutoCAD SHX Text 17,19,21
AutoCAD SHX Text 18,20,22
AutoCAD SHX Text 23,25,27
AutoCAD SHX Text 24,26,28
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
AutoCAD SHX Text 20A
AutoCAD SHX Text 15A
AutoCAD SHX Text 150A
AutoCAD SHX Text 40A
AutoCAD SHX Text 30A
AutoCAD SHX Text 15A
AutoCAD SHX Text 60A
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
SPARE
AutoCAD SHX Text 2,4
AutoCAD SHX Text 1,3
AutoCAD SHX Text 6,8,10
AutoCAD SHX Text 5,7
AutoCAD SHX Text 11,13,15
AutoCAD SHX Text 12,14,16
AutoCAD SHX Text 17,19,21
AutoCAD SHX Text 18,20,22
AutoCAD SHX Text 23,25,27
AutoCAD SHX Text 24,26,28
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
AutoCAD SHX Text
1. SINGLE LINE IS DIAGRAMMATIC AND IS INTENDED TO SHOW SYSTEM CONFIGURATION. SINGLE LINE IS DIAGRAMMATIC AND IS INTENDED TO SHOW SYSTEM CONFIGURATION. 2. RED COLOR DENOTES INSTALLATION WORK TO BE COMPLETED IN PROJECT. RED COLOR DENOTES INSTALLATION WORK TO BE COMPLETED IN PROJECT. 3. CONDUCTOR AND CONDUIT SIZES ARE BASED ON COPPER CONDUCTORS WITH XHHW-2 INSULATION IN CONDUCTOR AND CONDUIT SIZES ARE BASED ON COPPER CONDUCTORS WITH XHHW-2 INSULATION IN RIGID STEEL CONDUIT, UNLESS OTHERWISE NOTED. 4. COORDINATE ALL ELECTRICAL WORK WITH STRUCTURAL AND MECHANICAL REQUIREMENTS. COORDINATE ALL ELECTRICAL WORK WITH STRUCTURAL AND MECHANICAL REQUIREMENTS. 5. PROVIDE ALL ELECTRICAL, CONTROL, AND ANNUNCIATION CONNECTIONS REQUIRED FOR A COMPLETE AND PROVIDE ALL ELECTRICAL, CONTROL, AND ANNUNCIATION CONNECTIONS REQUIRED FOR A COMPLETE AND OPERATIONAL SYSTEM FOR ALL MECHANICAL EQUIPMENT INSTALLED. ALL ELECTRICAL WORK AND NEW MATERIAL SHALL BE PROVIDED BY THE CONTRACTOR UNLESS OTHERWISE NOTED. 6. CONTRACTOR SHALL INSTALL ALL EQUIPMENT PER NEC, NESC, ANSI, AND MANUFACTURE'S REQUIREMENTS. CONTRACTOR SHALL INSTALL ALL EQUIPMENT PER NEC, NESC, ANSI, AND MANUFACTURE'S REQUIREMENTS. 7. PROVIDE DISCONNECT SWITCHES, MOTOR STARTERS, OVERLOAD PROTECTION AND OTHER CONTROLS FOR PROVIDE DISCONNECT SWITCHES, MOTOR STARTERS, OVERLOAD PROTECTION AND OTHER CONTROLS FOR MOTOR DRIVEN EQUIPMENT AS REQUIRED BY CODE EVEN IF NOT INDICATED. FIELD WIRE EQUIPMENT ACCORDING TO MANUFACTURE'S INSTRUCTIONS. 8. AFFIX THE BOR PROVIDED ARC FLASH WARNING LABELS ON ALL EQUIPMENT PER NFPA 70 AND NFPA 70E. AFFIX THE BOR PROVIDED ARC FLASH WARNING LABELS ON ALL EQUIPMENT PER NFPA 70 AND NFPA 70E. 9. ALL ELECTRICAL WORK SHALL BE PERFORMED IN A NEAT WORKMANSHIP MANNER AS DEFINED BY THE ALL ELECTRICAL WORK SHALL BE PERFORMED IN A NEAT WORKMANSHIP MANNER AS DEFINED BY THE NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION (NECA.) 10. RECOMMENDATIONS FOR DAMP LOCATION. REUSE THE EXISTING 120VAC HEATER CIRCUIT. RECOMMENDATIONS FOR DAMP LOCATION. REUSE THE EXISTING 120VAC HEATER CIRCUIT.
| 140R1021B0008 |
| conduit and cable schedule |
| Conduit & Cable Schedule |
| AMD006 |
| Photos |
| Conduit Pipe |
| DSA3 and DSA18 |
| DSA10 Tie Breaker |
| PGB |
| PGF |
| Replacement Drawings |
| Sheets and Views |
| 22 X 34 |
| 447-100-60170-RD-1.pdf |
| Sheets and Views |
| 22 X 34 |
447-D-1171-RD-1 (1)