B09_Amend_02_Exhibit_C_Parapet_Caps_and_Roofing_to_be_Removed_by_NPS_updated_6_18_2026_0002.pdf

PDF 681 KB Posted

Attached to
KLGO PANTHEON/RED FRONT ROOF RECOVER
Solicitation number
140P9726R0004
Issued by

About this file

This document is an exhibit (Exhibit B) from a federal contract specification detailing scope of work for roofing and parapet cap work at the Pantheon Saloon and Red Front buildings under contract KLGO 331433A, scheduled for April 2026.

The National Park Service (NPS) will perform preparatory work prior to contractor arrival, including removal of parapet wall caps and existing rolled roofing on the Pantheon and Elevator Shaft roofs. NPS will also remove an unused chimney on the Red Front roof (no longer needed following conversion to heat pumps) and recover the roof penetration with matching sheathing. Additionally, NPS will address water infiltration damage on the Pantheon roof caused by previously repaired scupper flashing, removing all existing roofing and repairing or replacing damaged sheathing and joists as necessary. The contractor's scope includes recovering all grey roofing areas marked between red lines with new polyvinyl chloride (PVC) membrane roofing material. Existing rolled roofing on the Red Front building will remain in place and be recovered rather than replaced. The document identifies approximate locations of roof fall protection anchors via blue squares and includes photographic documentation of the chimney, parapet conditions, and areas of water damage requiring remediation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pantheon Saloon/Red Front Roofs – Parapet Caps and Roofing to be removed by NPS

KLGO 331433A

April, 2026 Exhibit B

Red lines indicate parapet wall caps to be removed and replaced by NPS Preservation Crew. All grey roofing between the red lines is what will be recovered with new polyvinylchloride (PVC) membrane roofing material. NPS will remove existing rolled roofing on the Pantheon and Elevator Shaft roofs.

Existing rolled roofing on the Red Front will remain and be recovered. Chimney (Indicated by large red arrow) on the red front roof is no longer used since the conversion to heat pumps and will be removed by

NPS Day labor and the roof penetration recovered with matching sheathing to match existing. Blue Squares are approximate locations of roof fall protection anchors.

Existing Rolled Roofing on Pantheon and Elevator Shaft to be removed by NPS

Existing Roofing on Red Front to remain.

Red box indicates area of Pantheon roof known to have sheathing damage from water infiltration caused by the leaking scupper (indicated by the arrow) flashing that was repaired during the 2023 exterior finishes project. On going leak into the workroom during certain weather conditions is near the chimney.

The black “Henry’s Roof Patching” has been our attempt to mitigate the leak. NPS will remove entirety of existing roofing on Pantheon Roof and repair/replace sheathing and joists necessary prior to contractor arrival.