B09_Q_As_at_Amend_04_0004.pdf

PDF 91 KB Posted

Attached to
GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES Federal contract opportunity
Solicitation number
140P9725Q0097
Issued by
Department of the Interior National Park Service Alaska Region

About this file

This document is a Questions & Answers (Q&A) file for solicitation 140P9725Q0097 at Amendment 04, detailing a federal electrical infrastructure upgrade project. The project involves multiple tasks at the Glacier Bay Lodge, including installing a neutral/ground conductor, re-terminating load break elbows, upgrading electrical feeders, replacing junction bars with above-grade sectionalizing cabinets, and installing a new 400 AMP service disconnect breaker. Key technical specifications include using #4 AWG 600V insulated conductor, #2CU 220mil cable with tape shield, and 500kcmil copper conductors, with work to be performed under Alaska Administrative Code requirements.

The contract is a firm-fixed-price service with a phased payment schedule: 31% of total contract value upon completion of neutral ground task, 36% for junction bar and cabinet installation, and the remaining 33% after full delivery and government acceptance. The contractor must obtain a Stormwater Pollution Prevention Plan from the Alaska Department of Environmental Conservation and ensure all on-site work is supervised by a certified Journeyman Lineman with an Alaska Fitness Card. The project requires minimal site preparation, with most areas accessible by mini-excavator and only minor brushing needed.

View the file

Other files for this federal contract opportunity

Other files attached to GLBA CORRECT MEDIUM VOLTAGE DEFICIENCIES, newest first.
File Type Posted
Sol_140P9725Q0097_Amd_0006.pdf PDF
B08_Solicitation_-_Combo_Syn-Sol_0006.pdf PDF
Sol_140P9725Q0097_Amd_0005.pdf PDF
B09_Q_As__2_at_Amend_05_0005.pdf PDF
B09_Amend_04_Pic_3_0004.jpg JPG image
B09_Amend_04_Pic_4_0004.jpg JPG image
B09_Amend_04_Pic_1_0004.jpg JPG image
Sol_140P9725Q0097_Amd_0004.pdf PDF
B09_Amend_04_Pic_2_0004.jpg JPG image
Sol_140P9725Q0097_Amd_0003.pdf PDF
Sol_140P9725Q0097_Amd_0002.pdf PDF
B09_Amend_01_-_2003_as-builts_redlines_0001.pdf PDF
B09_Amend_01_-_Pic_4_0001.jpg JPG image
B09_Amend_01_-_PIC_5_0001.jpg JPG image
B09_Amend_01_-_Pull_Boxes_0001.pdf PDF
B09_Amend_01__-_Transformer_0001.pdf PDF
Sol_140P9725Q0097_Amd_0001.pdf PDF
B09_Amend_01_-_Pic_1_0001.jpg JPG image
B09_Amend_01_-_Google_Map_0001.jpg JPG image
B09_Amend_01_-_PIC_2_0001.jpg JPG image
B09_Amend_01_-_Pic_3_0001.jpg JPG image
B09_Amend_01_-_Q_As_0001.pdf PDF
Sol_140P9725Q0097.pdf PDF
B03_DOL_WD_2015-5685_Rev_26.pdf PDF
B08_SOW.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS

140P9725Q0097 at Amendment 04

Q1. Is a Journeyman Lineman Alaska Fitness Card required to perform the work on this project? If so, is it legally required for execution, or is it preferred/recommended?

A1. All work performed on site shall be supervised by a person that has a current Journeyman Lineman Alaska Fitness Card. The ratio of individuals working under trainee certificates on a job site may not be more than two power lineman trainees for every certified power lineman journeyman. This is a legal requirement under ALASKA

ADMINISTRATIVE CODE TITLE 8, CHAPTER 90

Q2. 1. “Neutral/Ground Conductor Installation: Install a #4 AWG, 600V insulated neutral/ground conductor from MOST#3 to MOST#5, bonding to the existing grounding system in all pull boxes and MOST switches. The new neutral/ground will be direct buried near the existing conduit runs.” How deep is the trench? Is the ROW cleared? Is the ROW accessible with equipment (Mini-Excavator)?

A2. Trench will be minimum depth per NEC 300.5. All portions of the project are accessible by mini-excavator. Some minor brushing may be required from Most#3 to the sectionalizing cabinet by the fire pump building. No tree clearing is required.

Q3. “Load Break Elbow Termination: Re-terminate improperly installed 15kV load break elbows in MOST#4 and the Fire Pump building sectionalizing cabinet to correct insulation screen exposure issues.” What is the quantity of Terminations? What type and size of Cable (conc, tape-shield, Al or Cu)? System Voltage?

A3. Quantity-6. From the site inspection, where the cable markings could be observed the cable appears to be manufactured by Pirelli (now Prysmian) and is a #2CU, 220mil, 133% insulation with a tape shield. If there is adequate spare cable in the pull boxes, the existing improperly terminated cables should be cut off at least 12” below the exposed semi-conducting insulation screen and the cables should be re-terminated with new, properly installed, 200A load break elbows. If the existing cable length is not adequate to allow the cable to be shortened and re-terminated, the existing load break elbow should be removed, the semi-conducting insulation shield should be cleaned to remove any dust, dirt, moisture, etc. A new load break elbow should be properly installed with the concentric neutral conductors run to the base of the elbow and a cold shrink jacket installed over the semi-conducting insulation screen effectively sealing the outer cable jacket. Medium voltage distribution system is rated at 15 KV.

Q4. “Feeder Upgrade: Upgrade the existing feeder from the generator switchgear to the transformer with 500kcmil copper conductors in the existing 3” conduits.” What is the length of the run? What type are the termination ends (mechanical, 2 hole paddle) ?

A4. Approximate length is 50’ or less. Termination ends could not be verified inside the MCP at the switchgear. A site visit is highly encouraged prior to start of work.

Q5. “Junction Bar Replacement: Replace underground 3- and 4-point junction bars with above-grade sectionalizing cabinets.” Are the new J boxes sitting on a vault? Can they be one piece fiberglass with lid? Is there a Quantity of 3 and 4 junction boxes to replace?

A5. New cabinets can sit on top of existing pull box if sized appropriately, closure plates will likely need to be installed around the sectionalizing cabinets to maintain the enclosure integrity of the existing pull box. A low profile, twelve-gauge mild steel design with stainless steel hardware is preferred. Color to be Standard Munsell Green 7GY3.29/1.5. Quantity-6 (4-4 way JB and 2-3 way JB).

Q6. “New Service Disconnect: Install a 400 AMP service disconnect breaker outside of the historic Glacier Bay Lodge. The breaker will be installed in an existing electrical box already installed onsite.” What type and manufacture of box? Can we get a picture of the existing box?

A6. See attachments included.

Q7. With this acquisition being firm-fixed-price service, what would the payment schedule be?

A2. RFQ states the following...

"Delivery Payments: The Government shall make Delivery Payments to the Contractor for the following phases of service delivery completion and Government acceptance.

1. Task 1 – Neutral Ground: 31% of total contract value.

2. Task 6 – Junction Bar with Cabinets: 36% of total contract value.

* Remainder of Contract Value: 33%, after full delivery, Government inspection & acceptance.

See SOW for related service details."

Q8. What permits are required for this project?

A8. No additional Right of Way (ROW) is required. Contractor shall obtain an appropriate

Stormwater Pollution Prevention Plan (SWPPP) from Alaska Department of Environmental

Conservation (ADEC).