This document appears to be a set of layout photos and diagrams related to the installation of electric vehicle (EV) chargers at Fort Cronkhite as part of a federal contract opportunity. The images provide details on the placement and configuration of dual and single EV chargers across multiple buildings, including information on trench depths, wire lengths, parking spots, and conduit runs. The related federal contract opportunity is Solicitation Number 140P8624R0012, issued by the National Park Service (NPS) for the Golden Gate National Recreation Area (GOGA) to install 19 EV chargers at Fort Cronkhite in Marin County, California. The documentation indicates the contract will involve the installation of pole-mounted, post-mounted, and wall-mounted EV chargers, as well as associated trenching, conduit, and wiring work. The images do not include pricing, set-asides, award dates, or other contractual details.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dual Charger Single Charger
12"
20"
Building 1066. Two pole-mounted chargers. One charger is a dual-charger. One is a single charger. Total trenching is approx. 41'. Trench will be min. 18' deep. Lot will have three charging spots. Parking spaces to be a minimum of 8.5' wide.
Black lines-approx. parking spots Red lines-Trenching for conduit and wire.
Note-Trenching locations are at the discretion of the contractor and trenching length may not match this picture.. EV panel is at the back side of the building (not in picture)
24' 17"
12'
Dual Charger Dual Charger
Building 1067. Two post-mounted chargers. Both are dual chargers. Total trenching approx 65'. Trench will go under sidewalk. Sidewalk is approx. 3.5' wide. Service is on far side of building. Wire will be in attic. Conduit will come out of attic and will surface mount on the side of the door. Wire will exit the building on the right side of the door as low to the ground as possible. Total trenching is approx 65'. Trench depth shall be a minimum of 18". Interior conduit run is approx 110'. Longest wire run is approx 185'. Lot will have four charging spots. Lot will require wheel stops.
Black line- Parking spot Red line- Trenching for conduit and wire
Conduit Daylight from Interior
Surface mounted extending into trench
(fed by 1069)
Dual Charger (fed by 1069)
18'
Dual Charger (wall mounted)
Building 1069. Lot has four dual chargers. Three are post-mounted and one is wall-mounted. Two of the chargers are fed from Building 1069. Trenching info for Building 1069 is on future drawing. Trenching total is approx. 51'. Minimum trench depth shall be 18". Lot will have a total of 8 charging spots (four fed from 1068, four fed from 1069.) Lot will need wheel stops. Wheel stops will not be required for street parking spots that use the wall-mounted charger.
Black line-parking spots Red line-trenching Note-EV panel (not shown in picture) is located to the right of the service.
Dual charging station. Minimum 24" above ground.
Outlet. No more than 12" below charging station
Power for outlet will be run through surface-mounted conduit inside of Building 1068. Two holes will be drilled through the building. One will be the entry point at the panel. The second will be the exit point behind the outlet. All holes shall be sealed.
EV Panel (not in picture). Has been installed other another contract.
14'
36'
Dual Charger
Dual Charger
Building 1069. Building supports two chargers. Both chargers are dual post-mounted chargers. Lot is shared with Building 1068. Total trenching is approx. 70' Minimum trench depth shall be 18". Lot will need wheel stops.
Red lines-trenching Black lines-parking spots
Drain Box
EV Panel (not shown in picture). Installed under previous contract.
Spot 1
Spot 2
Spot 3
Spot 4
Dual wall mounted charger
Dual wall mounted charger
Building 1070. Four parking spots. All parking spots are street parking. There will be two wall-mounted chargers.
Each charger will be a dual charger. Chargers will be mounted a minimum of 24" above ground level. Outlet for chargers will be no more than 12" below the charger. Power will be supplied from the interior of the building.
Interior conduit will be surface mounted to match existing.
| Building 1066 |
| Page 1 |
| Building 1067_1 |
| Building 1067_2 |
| Building 1068_1 |
| Building 1068_2 |
| Building 1069 |
| Building 1070 |