140P8525Q0005_Attachment_5_Questions_and_Answers_0003.pdf

PDF 12 MB Posted

Attached to
YOSE-SECONDARY CLARIFIER FRAMEWORK
Solicitation number
140P8525Q0005
Issued by

About this file

This is a Questions and Answers document for solicitation 140P8525Q0005 regarding the replacement of a secondary clarifier framework at El Portal Wastewater Treatment Plant, along with accompanying technical drawings and specifications.

The Q&A clarifies several technical aspects: N-69 Epoxy by Tnemec is approved for the hi-build epoxy coating, the bridge is welded rather than bolted, and rake arm dimensions are specified as H 3'6" x L 17'6" x D 3' x 9" 2/16 (two per side of drive cage). The drive cage dimensions are H 12'4" x W 4'5" x D 5'5". The document confirms that coating of old equipment and the tank itself are not required in the scope. A site visit is scheduled for February 27, 2025 at 10:00am at 5083 Foresta Road, El Portal, CA 95318, with RSVP required. The bid deadline has been extended to March 6, 2025 at 1200 PST. The technical drawings provide detailed specifications for the clarifier framework, including plan views, elevations, and assembly details.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P8525Q0005 Questions and Answers (Version 2 : 2/21/2025)

Is there any Available prints on this clarifier? Yes see below.

is there going to be a site visit to view the clarifier? A site visit may be organized by contacting Katie Bablitch, Sean Bittle, and Brian Roppolo at katie_bablitch@nps.gov sean_bittle@nps.gov, and brian_roppolo@nps.gov .

Will N-69 Epoxy be okay for the hi build epoxy? Brand is Tnemec? Yes.

Is the bridge bolted together? at the 4 way or is it welded? Welded.

What are the measurements for the rake arm supports? Rake arm Dimensions are: H 3' 6" x L 17' 6" x D 3' x 9" 2/16 (x2 per side of drive Cage) which are attached to drive cage that supports them.

Dimensions of drive Cage: H 12'4" (top of RAS Box) x W 4' 5" x Depth 5' 5"

Are we also coating the old equipment? No.

Is coating of the tank still a project scope of work or was that removed in the updated SOW?

It was removed, no coating the tank is required.

Would the park consider extending out this bid an additional week to allow more suppliers to review the project for proper quotations?

Yes, the solicitation will be extended until 3/6/2025 at 1200 PST. An organized site visit will be held on Thursday 2/27/2025 10:00am. Please RSVP with brian_roppolo@nps.gov, and katie_bablitch@nps.gov.

The location of the site visit is listed below:

5083 Foresta Road, El Portal, CA 95318. El Portal Wastewater Treatment Plant.

mailto:katie_bablitch@nps.gov mailto:sean_bittle@nps.gov mailto:brian_roppolo@nps.gov

20240328_133046
20240328_134147
20240328_140825
20240328_140953

File details come from the government source that posted it. Updated .