B08_Attachment_5_140P8426Q0077_Site_Visit_Question_and_Answer_0001.pdf
PDF 127 KB Posted
- Attached to
- Replace Shared Bathroom and Kitchen at Q5, NPS-ORCA Federal contract opportunity
- Solicitation number
- 140P8426Q0077
About this file
This document is a Questions and Answers record from a site visit conducted on September 8, 2026, regarding kitchen and bathroom remodeling work for five quarters of government housing under the National Park Service (NPS).
The document addresses five contractor inquiries with NPS responses clarifying scope and requirements. Regarding wall demolition, contractors must patch and paint/texture-match any wall areas disturbed by demolition or new installation to match existing finishes, rather than removing all drywall. For cabinet and countertop specifications, contractors must submit product data and cut sheets, finish samples (minimum 4 inches by 6 inches), cabinet layout drawings, and proposed countertop and cabinet colors for NPS approval prior to procurement or installation. Lighting fixture specifications require contractor submission of lighting examples for approval. The bathroom shower/tub requirement specifies installation of a new tub/shower unit with tub and shower faucets, with contractor submission of examples required. An important operational constraint prohibits contractors from occupying government housing during the remodeling work. The responses reference specific contract sections including 1.5.1 for Kitchen Renovations and 1.5.2 for Bathroom Renovations, and Item 10-Submittals for required documentation procedures.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8426Q0077_Amd_0002.pdf | ||
| Sol_140P8426Q0077_Amd_0001.pdf | ||
| B08_Attachment_4_140P8426Q0077__Site_Visit_Sign-In_Sheet_0001.pdf | ||
| Att_02_Wage_Determination_Josephine_County.pdf | ||
| Sol_140P8426Q0077.pdf | ||
| Att01_Quarters_5_Kitchen___Bathroom_Remodel___Specification_(FFP).pdf | ||
| B08_Attachment_3_140P8426Q0077_Tech_Info_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Questions: #5 quarters Kitchen/Bathroom Remodel 9.8.2026
1. Strip wall back to studs.
• Question: Walls that need access for plumbing/electrical etc. Should all the drywall be removed from the wall? Or just patch the cut openings.
• NPS Response: 1.5.1 Kitchen Renovations, Furnish and Install: “Patch and paint/texture-match any wall areas disturbed by demolition or new installation, in both kitchen and bathroom, to match adjacent existing finish.”
2. Cabinet/Countertop color and layout of cabinets.
• Question: Color of cabinets/Countertop and layout of cabinets?
• NPS Response: ITEM 10-SUBMITTALS, Required submittals, due prior to procurement or installation of the applicable item, include: “Product data and cut sheets for cabinets, countertops, flooring, fixtures, and appliances” “Finish samples, minimum 4 in. x 6 in.”
Contractor to submit cabinet layout (drawings) and submit countertop/cabinet color for
NPS approval.
3. Replace existing lights.
• Question: What style of lighting, can lights, recessed?
• NPS Response: Contractor will submit examples of lighting.
4. Bathroom shower/tub what type.
• Question: What type of shower/tub: Fiber insert, steel, tile.
• NPS Response: 1.5.2 Bathroom Renovation, Furnish and Install: “New tub/shower unit with tub and shower faucets.”
5. Contractor housing.
• Question: Can contractor stay in housing during remodel?
• NPS Response: No, contractors cannot stay in Government Housing during remodel.