Att 12_140P8420R0003_ Spec Section 01 27 00_revised_0002.pdf
PDF 88 KB Posted
- Solicitation number
- 140P8420R0003
About this file
This document defines five contract line items for the rehabilitation of the Peaks View Parking Area at Pinnacles National Park in California. The line items include mobilization, site preparation and demolition; grading, paving, and amenities; installation of a drinking fountain and bottle filling station; and two bid options for either a precast or custom-built vault toilet facility. Payment for each contract line item will be made as a lump sum upon completion of the specified work in accordance with contract requirements and specifications. The solicitation was issued by the National Park Service's Pacific West Region for rehabilitation of the parking area located in Pinnacles National Park in San Benito County, California.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PINN - 198912 01 27 00 - 1
082714 DEFINITION OF CONTRACT LINE ITEMS
SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS
PART 1 - GENERAL
1.1 SUMMARY
A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of the work, include the costs in a related item.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS
A. Contract Line Item No. 1 Mobilization, Site Prep, & Demolition
1. This item consists of all costs associated with the contractors pre and post construction activities including mobilization, demobilization, completion of all required site clearing, material disposal, and removal and disposal of swing gate at entrance of parking lot. The government shall consider that mobilization is sixty (60) percent and demobilization is forty (40) percent of the total cost and effort for Mobilization and Demobilization.
2. No separate measurement will be made.
3. Payment will be made at the contract lump sum price.
B. Contract Line Item No. 2 Grading, Paving, & Amenities
1. This price item includes providing all labor, materials, and equipment required for the construction of a fully functional trailhead parking area in accordance with the project plans and specifications. This Work includes, but is not limited to, the installation of all required traffic control, temporary stormwater pollution prevention measures, completion of all rough and fine grading inclusive of any necessary soil import or export, furnish, place and compact all base materials, asphalt concrete paving surfaces and appurtenances, the construction all concrete surfacing improvements, installation of all necessary signage and striping, relocation of various boulders, relocation of existing periscopes, and relocation of picnic benches.
2. No separate measurement will be made.
3. Payment will be made at the contract lump sum price.
C. Contract Line Item No. 3 Drinking Fountain/Bottle Filling Station
PINN - 198912 01 27 00 - 2
082714 DEFINITION OF CONTRACT LINE ITEMS
1. This price item includes providing all labor, materials, and equipment required for the installation of the specified freeze resistant tri-head water fountain and associated new water service lateral and leach line in the locations shown on the plans. This includes, but is not limited to the completion of all required trenching, installation of all required bedding material, installation of all aggregate fill, installation of all sanitary sewer appurtenances, installation of all water appurtenances and fittings, trench backfill and compaction, and installation of the specified freeze resistant tri-head water fountain in accordance with the manufacturer’s recommendations.
2. No separate measurement will be made.
3. Payment will be made at the contract lump sum price.
D. Contract Line Item No. 4 Bid Option - Vault Toilet-Standard Precast w/no porch
1. This price item includes providing all labor, materials, and equipment required for the installation of a double fully precast building (CXT Double Cascadian or equivalent) in the location shown on the plans. This includes, but is not limited to, the completion of all required excavation, the installation of all required bedding material, installation of the vault toilet tankage and structure in accordance with the manufacturer’s recommendations, completion of the building improvements for a fully functional vault toilet facility, completion of all required backfilling around the tank and structure, and completion of all finish grading necessary to incorporate the vault toilet into the adjoining concrete pathways and parking lot ensuring that the installation meets accessibility requirements.
2. No separate measurement will be made. Either CLIN 4 or CLIN 5 will be selected, not both.
3. Payment will be made at the contract lump sum price.
E. Contract Line Item No. 5 - Bid Option - Vault Toilet-Custom Built Building
1. This price item includes providing all labor, materials, and equipment required for the installation of the specified Vault Toilet facility in the location shown on the plans. This includes, but is not limited to, the completion of all required excavation, the installation of all required bedding material, installation of the vault toilet tankage and structure in accordance with the manufacturer’s recommendations, completion of the building improvements for a fully functional vault toilet facility with custom timber framed roof and porch as shown in the drawings, completion of all required backfilling around the tank and structure, and completion of all finish grading necessary to incorporate the vault toilet into the adjoining concrete pathways and parking lot ensuring that the installation meets accessibility requirements.
2. No separate measurement will be made. Either CLIN 4 or CLIN 5 will be selected, not both.
3. Payment will be made at the contract lump sum price.
END OF SECTION 01 27 00
File details come from the government source that posted it. Updated .