Att 02_140P8420Q0039_Project Specifications_revised_0007.pdf
PDF 1 MB Posted
- Attached to
- Paint Home Ranch Residences, NPS-PORE Federal contract opportunity
- Solicitation number
- 140P8420Q0039
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8420Q0039_Amd_0007.pdf | ||
| Att 11_140P8420Q0039_Site Visit Notes-Q-A_0007.pdf | ||
| Att 10_140P8420Q0039_Site Visit Sign In Sheet_0007.pdf | ||
| Att 05_140P8420Q0039_Technical Info Form_revised_0006.pdf | ||
| Att 09_140P84200039_Site Visit Info and Q-A_0006.pdf | ||
| Sol_140P8420Q0039_Amd_0006.pdf | ||
| Sol_140P8420Q0039_Amd_0005.pdf | ||
| Att 08_140P84200039_Q-A_0004.pdf | ||
| Sol_140P8420Q0039_Amd_0004.pdf | ||
| Sol_140P8420Q0039_Amd_0003.pdf | ||
| Sol_140P8420Q0039_Amd_0002.pdf | ||
| Sol_140P8420Q0039_Amd_0001.pdf | ||
| Att 03_140P8420Q0039_Map and Site Photos.pdf | ||
| Att 05_140P8420Q0039_Technical Info Form.pdf | ||
| Att 04_140P8420Q0039_Wage Rates.pdf | ||
| Sol_140P8420Q0039.pdf | ||
| Att 02_140P8420Q0039_Specifications.pdf | ||
| Att 01_140P8420Q0039_Contract Bid Schedule.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREPARE AND PAINT THE HISTORIC HOME
RANCH MAIN HOUSE AND MURPHY HOUSE
POINT REYES NATIONAL SEASHORE, CALIFORNIA
TABLE OF CONTENTS
DIVISION 01- GENERAL REQUIREMENTS
SECTION 01110 SUMMARY OF WORK
SECTION 01310 PROJECT MEETINGS
SECTION 01330 SUBMITTALS
SECTION 01360 ACCIDENT PREVENTION
SECTION 01420 REFERENCE STANDARDS
SECTION 01430 CONTRACTOR QUALITY CONTROL
SECTION 01600 MATERIAL AND EQUIPMENT
SECTION 01770 PROJECT CLOSEOUT
DIVISION 09- FINISHES
SECTION 09900 PAINTING SPECIFICATION
Solicitation No. 140P8420Q0039, Attachment No. 02 (revised 7/8/2020)
SECTION 01110 - SUMMARY OF WORK
01110-1
PART 1 GENERAL
1 .1 DESCRIPTION
A. The work of this contract consists of the general construction of providing all the materials, labor and equipment to paint the exterior of the historic Home Ranch Main House and the Murphy House. The buildings to be treated are adjacent to one another at the Historic Home Ranch within Point Reyes National Seashore (see location map). Contract work includes preparation, priming, and painting of all surfaces previously painted including: the exterior walls of the buildings; exterior wooden doors and door frames; and exterior building windows and trim (excluding sash); and other previously painted surfaces.
B. The Home Ranch Main House is a historic residential building constructed circa 1860 as part of the Home Ranch. The building has approximately 3,554 square feet of exterior wall surface including 34 windows. The Murphy House is also a residential building within the Home Ranch constructed circa 1946. The building has approximately 2,078 square feet of exterior wall surface including 18 windows.
Estimation of wall surfaces are approximate and should be validated by prospective offerors prior to submitting proposals.
C. The exterior building elements are coated with lead based paint.
D. All Offerors are highly encouraged to attend the sit visit and examine existing conditions before submitting quotes. All offerors will be held to have the same knowledge concerning the site and the on-ground conditions as if they had inspected the job site.
1.2 LOCATION
A. Both buildings are located at the historic Home Ranch within the Point Reyes National Seashore. Access to the location is from Home Ranch Road that is approximately 11 miles from Park Headquarters and the Bear Valley Visitor Center.
1.3 CONTRACTOR’S USE OF PREMISES
A. General: The contractor shall commence work within 10 calendar days after the date of receipt of the Notice to Proceed document from the Contracting Officer, prosecute the work diligently, and complete the entire work ready for use not later than 45 days following receipt of the Notice to Proceed. The anticipated period of performance is July 27, 2020 through September 10, 2020.
B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public, staff and occupants, no closures will be permitted without specific approval of Contracting Officer
C. Confine storage of materials to areas approved by the Contracting
01110-2
Officer.
D. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings.
Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
E. Provide temporary barriers to protect existing trees and plants and root zones.
F. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction.
G. Do not fasten ropes, cables, or guys to existing trees.
H. Carefully supervise excavating, wading, filling, and other construction operations near trees to prevent damage.
I. Construction Camp: Establishment of a camp within the park will not be permitted.
J. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent.
A special permit will not relieve Contractor of liability for damage that may result from moving of equipment.
1 .4 SPECIAL CONSTRUCTION REQUIREMENTS
A. The Contractor shall perform all work between the hours of 8:00 AM to 5:00 PM Monday through Friday. Any variation of this work schedule must be requested in writing and approved in advance by the Contracting Officer.
B. Holiday Work Restrictions: No on-site work shall be performed on weekends or federal holidays unless otherwise directed by the Contracting Officer.
1 .5 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.6 CONSTRUCTION MATERIALS
A. The Government will furnish both water and electricity.
B. All other materials shall be Contractor-furnished from outside the park.
01110-3
C. SOILS INVESTIGATION REPORT: NOT USED.
D. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.
PART 2 PRODUCTS: NOT USED.
PART 3 EXECUTION: NOT USED.
END OF SECTION
01110-4
01310-1
PROJECT MEETINGS
SECTION 01310
PROJECT MEETINGS
PART 1 GENERAL
1 .1 PRECONSTRUCTION CONFERENCE
A. Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor.
The meeting agenda will include the following as a minimum:
1. Correspondence procedures
2. Designation of responsible personnel
3. Labor standards provisions
4. Payroll reports
5. Changes
6. Payments to Contractor
7. Subcontractors
8. National Park Service regulations
9. Accident prevention program (including name of responsible supervisor)
10. Accident reporting
11. Documents required under the contract
12. Park rules and regulations
13. Recycling Program
14. Saturday, Sunday, holiday and night work
15. Safety program (compliance with the "Accident Prevention" clause of the General
Provisions)
16. Tentative construction schedule
17. Submittal of shop drawings, project data, samples, and approved equals
18. Project closeout requirements
19. Relationship of Division 1 to other divisions
01310-2
PROJECT MEETINGS
1 .2 PROGRESS MEETINGS
A. The Contracting Officer will schedule weekly meetings with the Contractor and subcontractors.
B. Subcontractors will not be allowed to work until they have attended a meeting.
C. Additional meetings will be held as needed or for new subcontractors.
D. The meeting agenda will include the following as a minimum:
1. Approval of minutes of previous meetings
2. Review of work progress
3. Field observations, problems, and decisions
4. Identification of problems which impede planned progress
5. Review of submittals schedule and status of submittals
6. Review of off-site fabrication and delivery schedules
7. Status of project record drawings (monthly)
8. Status of operation and maintenance data manuals (monthly)
9. Maintenance of progress schedule
10. Corrective measures to regain projected schedules
11. Planned progress during succeeding work period
12. Coordination of projected progress
13. Maintenance of quality and work standards
14. Effect of proposed changes on progress schedule and coordination
15. Other business relating to work
PART 2 PRODUCTS NOT USED.
PART 4 MEASUREMENT AND PAYMENT
4 .1 PROJECT MEETINGS
A. Payment will be included in the bid item to which this work relates.
SECTION 01330 - SUBMITTALS
01330-1
PART 1 GENERAL
1.1 DESCRIPTION
A. The work of this section consists of submittal requirements before and during construction.
1.2 RELATED REQUIREMENTS
A. Project closeout - Section 01770.
1.3 SUBMITTAL AND APPROVAL PROCEDURES
A. All submittals shall be transmitted using National Park Service form DSC-l(CS), dated 11/95. (A copy of the form is included at the end of this section.)
No action will be taken on a submittal item unless accompanied by the transmittal form.
B. As specified in the individual sections, forward submittals to Contracting Officer at least 30 days before need for approval. Unless a different number is specified, submit one reproducible original and two copies of each shop drawing, three copies of manufacturer’s catalog sheets (cut sheets), three specimens of each sample, and three copies of all other submittals requested.
1. Surface Preparation Plan: for work related operations on buildings containing lead paint, includes containment and disposal.
2. Samples: Samples shall be large enough to illustrate clearly the functional characteristics and full range of color, texture, or pattern.
3. Manufacturers’ Catalog Sheets: Submit only pertinent pages: mark each copy of standard printed data to identify specific products proposed for use.
4. Manufacturer’s Application Instructions: When contract documents require compliance with manufacturer’s printed instructions, provide one complete set of instructions for Contracting Officer and keep another complete set of instructions at the project site until substantial completion.
C. Contracting Officer reserves the right to require submittals in addition to those called in individual sections.
D. Approved Equals:
I. For each item proposed as an “approved equal,” submit supporting data including:
a. Drawings and samples as appropriate.
01330-2
b. Comparison of the characteristics of the proposed item with that specified.
c. Changes required in other elements of the work because of the substitution.
d. Name, address, and telephone number of vendor.
e. Manufacturer’s literature regarding installation, operation, and maintenance, including schematics for electrical and hydraulic systems, lubrication requirements, and parts lists. Describe availability of maintenance service, and state source of replacement materials.
2. A request for approval constitutes a representation that Contractor:
a. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.
b. Will provide the same warranties for the proposed item as for the item specified.
c. Has determined that the proposed item is compatible with interfacing items.
d. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.
e. Waives all claims for additional expenses that may be incurred as a result of the substitution.
3. Construction Materials: The Contractor is encouraged to submit for approval products made out of recycled or environmentally responsible material. Every effort will be made by the National Park Service to approve these materials.
E. Coordinate all submittals and review them for legibility, accuracy, completeness, and compliance with contract requirements. Forward submittals that are related to or affect one another as a package to facilitate coordinated review. Each transmittal shall contain only data specific to that individual submittal.
F. Submittal Identification:
1. Identification shall include the park name-package number, project title, contract number, and transmittal number.
2. All sets of shop drawings, manufacturer’s catalog sheets, samples, and other documents submitted to the Contracting Officer must have the identification information stamped on the submittal.
01330-3
3. Identification information shall be applied to the bottom right margin on each page. Identification information on samples shall be applied to the most readily visible area on the sample or on tags attached to sample.
G. Submittal Numbering:
1. Number each submittal consecutively.
2. For re-submittals use the original submittal number, plus a letter suffix beginning with A.
3. Additional re-submittals of the same item shall contain the original number with the next consecutive letter.
H. Contracting Officer’s Review:
1. Submittals will be returned disapproved without technical review if identification information is missing, not filled in, or if placed on the back of the submittal; an incorrect number or format of submittals is provided; the transmittal form is incorrectly filled out; submittals are not coordinated; or submittals do not show evidence of Contractor’s approval.
2. Any work done or orders for materials or services placed before approval shall be at the Contractor’s own risk.
3. After reviewing submittal, the Contracting Officer will return one copy of form
DSC-1 (CS) and one copy of applicable (marked up) submittal sheets to the
Contractor. Shop drawing review notations will be returned on the reproducible original shop drawing. All other submitted items will be retained. The Contractor is responsible for producing additional copies for his/her own use.
4. The returned submittal will be marked in one of three ways as defined below:
a. APPROVED: Acceptable with no corrections.
b. APPROVED WITH NOTATIONS: Minor corrections or clarifications required. All comments are clear and no further review is required. The
Contractor shall address all review comments when proceeding with the work.
c. DISAPPROVED - RESUBMIT: Rejected as not in accordance with the contract or as requiring major corrections or clarifications. The
Contracting Officer will identify the reasons for disapproval. The
Contractor shall revise and resubmit with changes clearly identified.
Sheet: 1 of: TRANSMITTAL - NATIONAL PARK SERVICE Transmittal No.:
Park: Project: Contract No.: Pkg. No.: Date:
Contractor: Subcontractor/Supplier:
NPS ACTION
Specification
Section No.
Description of Item
(Size, Type, Name, Manufacturer, Use, Etc.)
Contractor Signature Recommended by
Title, Date Title Date I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)
Review Comments Action By Date
Contracting Officer’s Representative
Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.
SUBMITTAL LOG DATES: From contractor [ ], To reviewer [ ], From reviewer [ ], To Contractor [ ] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim CM-16Rev. 4/00 (Formerly DSC-1(CS)
TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:
Sheet: 1 of:
Park: Project: Contract No.: Pkg. No.: Date:
Contractor: Subcontractor/Supplier:
NPS ACTION
Specification
Section No.
Description of Item
(Size, Type, Name, Manufacturer, Use, Etc.)
Review Comments
CM-16 Rev. 4/00 (Formerly DSC-1(CS)
01360-1
ACCIDENT PREVENTION
SECTION 01360
1 .1 DESCRIPTION
A. The work of this section consists of establishing an effective accident prevention program and providing a safe environment for all personnel and visitors.
1 .2 SUBMITTALS
A. Accident Prevention Program: Before on-site work begins, submit for approval an accident prevention program. The Contracting Officer will review the proposed program for compliance with OSHA and project requirements. If the program requires any revisions or corrections, the
Contractor shall resubmit the program within 10 days. No progress payments will be made until the program is approved. The program shall include:
1. Name of responsible supervisor to carry out the program.
2. Weekly and monthly safety meetings.
3. First aid procedures.
4. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, National Park
Service personnel, and Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers. Specifically identify the methods of protecting workers and visitors from exposure to lead paint hazard.
5. Training, both initial and continuing.
6. Planning for possible emergency situations, such as floods, fires, cave-ins, slides, explosions, power outages, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.
7. Housekeeping: Section 01570.
B. Certificates: Provide certificates from a mechanic that all mechanical equipment has been inspected and meets OSHA requirements.
C. Submit a copy of test reports, as required by OSHA, for personnel working with hazardous materials, specifically lead based paint hazards.
D. Submit a report of safety meetings and of inspections.
E. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.
1 .3 QUALITY ASSURANCE
01360-2
A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the contract. In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.
B. Qualifications of Employees:
1. Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
2. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
3. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.
Newly hired operators shall be individually tested by an experienced operator or supervisor to determine if they are capable of safely operating equipment.
1 .4 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires.
Notify Contracting Officer immediately in the event of a reportable accident. Within 7 days of a reportable accident, fill out and forward to Contracting Officer an Accident/Property Damage
Report (Form CM-22). Form may be obtained from the Contracting Officer.
B. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
PART 2 PRODUCTS
2 .1 FIRST AID FACILITIES
A. Provide adequate facilities for the number of employees and the type of construction at the site.
2 .2 PERSONNEL PROTECTIVE EQUIPMENT
A. Meet requirements of NIOSH and MSHA.
PART 3 EXECUTION
3 .1 EMERGENCY INSTRUCTIONS
A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
3 .2 EGRESS
01360-3
A. Provide and maintain adequate egress at all times in accordance with the Life Safety Code (NFPA
101). No corridor, aisle, stairway, door, or exit shall be obstructed or used in a manner that interferes with egress.
3 .3 PROTECTIVE EQUIPMENT
A. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
B. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
3 .4 SAFETY MEETINGS
A. As a minimum, conduct weekly "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
B. Conduct monthly safety meetings for all levels of supervision. Notify the Contracting Officer of meeting dates and times. These meetings shall be used to review the effectiveness of the
Contractor's safety effort, to resolve current health and safety problems, to provide a forum for planning safe construction activities, and for updating the accident prevention program. The
Contracting Officer will attend the meeting and enter the results of the meetings into the daily log.
3 .5 HARD HATS AND PROTECTIVE EQUIPMENT AREAS
A. A hard hat area will be designated by the Contracting Officer. The hard hat area shall be posted by the Contractor in a manner satisfactory to the Contracting Officer.
B. It is the Contractor's responsibility to require all those working on or visiting the site to wear hard hats and other necessary protective equipment at all times. As a minimum, provide six hard hats for use by visitors. Change liners before reissuing hats.
3 .6 TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury. In this particular case the potetial hazard is lead based paint.
PART 4 MEASUREMENT AND PAYMENT
4 .1 ACCIDENT PREVENTION
A. Payment will be included in the bid item to which this work relates.
12/97 01420-1
REFERENCE STANDARDS
SECTION 01420
1 .1 The following abbreviations, which may be used in the construction specifications, refer to the organizations and specifications of the organizations listed below:
AA Aluminum Association
900 19th Street, NW, Suite 300
Washington, D.C. 20006-2168
AABC Associated Air Balance Council
1518 K Street, NW, Suite 503
Washington, D.C. 20005
AAMA American Architectural Manufacturers Association
1827 Walden Office Square, Suite 104
Schaumberg, Illinois 60173
AAN American Association of Nurserymen
1250 I Street, NW, Suite 500
Washington, D.C. 20005
AASHTO American Association of State Highway and Transportation Officials
444 North Capitol Street, NW, Suite 249
Washington, D.C. 20001
ABMA American Boiler Manufacturers Association
950 N. Glebe Road, Suite 160
Arlington, Virginia 22203-1824
ACI American Concrete Institute
P.O. Box 9094
Farmington Hills, Michigan 48333
ACPA American Concrete Pipe Association
222 West Colinas Boulevard, Suite 641
Irving, Texas 75039-5423
ADC Air Diffusion Council
11 South LaSalle Street, Suite 1400
Chicago, Illinois 60603
AFPA American Forest and Paper Association
1111 19th Street, NW, Suite 800
Washington, D.C. 20036
AGA American Gas Association
1515 Wilson Boulevard
Arlington, Virginia 22209
AHA American Hardboard Association
1210 W. Northwest Highway
Palatine, Illinois 60067-1897
AHAM Association of Home Appliance Manufacturers
20 N. Wacker Drive, Suite 1500
Chicago, Illinois 60606
12/97 01420-2
AI Asphalt Institute
Research Park Drive
P.O. Box 14052
Lexington, Kentucky 40512-4052
AISC American Institute of Steel Construction, Inc.
1 East Wacker Drive, Suite 3100
Chicago, Illinois 60601-2001
AISI American Iron and Steel Institute
1101 17th Street, NW, Suite 1300
Washington, D.C. 20036-4700
AITC American Institute of Timber Construction
7012 S. Revere Parkway, Suite 140
Englewood, Colorado 80112
ALSC American Lumber Standards Committee
P.O. Box 210
Germantown, Maryland 20875
AMCA Air Movement and Control Association
30 W. University Drive
Arlington Heights, Illinois 60004-1893
ANSI American National Standards Institute
11 West 42nd Street, 13th Floor
New York, New York 10036
APA American Plywood Association (See EWA)
APWA American Public Works Association
106 West 11th Street, Suite 1800
Kansas City, Missouri 64105-1806
ARI Air-Conditioning and Refrigeration Institute
4301 Fairfax Drive, Suite 425
Arlington, Virginia 22203
ARM Asphalt Roofing Manufacturers Association
6001 Executive Boulevard, Suite 201
Rockville, Maryland 20852
ASC Adhesive and Sealant Council
1627 K Street, NW, Suite 1000
Washington, D.C. 20006-1707
ASHRAE American Society of Heating, Refrigerating, and Air-Conditioning Engineers
1791 Tullie Circle, NE
Atlanta, Georgia 30329-2305
ASLA American Society of Landscape Architects
4401 Connecticut Avenue, NW
Fifth Floor
Washington, D.C. 20008-2302
ASME American Society of Mechanical Engineers
345 East 47th Street
New York, New York 10017
12/97 01420-3
ASPE American Society of Plumbing Engineers
3617 Thousand Oaks Boulevard, Suite 210
Westlake, California 91362-3649
ASSE American Society of Sanitary Engineering
28901 Clemens Road, Suite 100
Westlake, Ohio 44145
ASTM American Society for Testing and Materials
100 Barr Harbor Drive
West Conshohocken, Pennsylvania 19428-2959
AWI Architectural Woodwork Institute
1952 Isaac Newton Square
Reston, Virginia 20190
AWPA American Wood-Preservers' Association
P.O. Box 286
Woodstock, Maryland 21163-0286
AWPI American Wood Preservers Institute
1945 Old Gallows Road, Suite 550
Vienna, Virginia 22182
AWS American Welding Society, Inc.
550 NW LeJeune Road
Miami, Florida 33126
AWWA American Water Works Association
6666 W. Quincy Avenue
Denver, Colorado 80235
BHMA Builders Hardware Manufacturers Association, Inc.
355 Lexington Avenue, 17th Floor
New York, New York 10017
BIA Brick Institute of America
11490 Commerce Park Drive, Suite 300
Reston, Virginia 22091-1506
BOCA Building Officials Code Administrators
4051 W. Flossmoor Road
Country Club Hills, Illinois 60478-5795
CBM Certified Ballast Manufacturers
1422 Euclid Avenue, Suite 402
Cleveland, Ohio 44115-2851
CDA Copper Development Association, Inc.
260 Madison Avenue, 16th Floor
New York, New York 10016-2401
CE Corps of Engineers
(Chief of Engineers - Referral, U.S. Department of the Army)
Washington, D.C. 20314
CID Commercial Item Description
See General Provisions
CISPI Cast Iron Soil Pipe Institute
5959 Shallowford Road, Suite 419
Chattanooga, Tennessee 37421
12/97 01420-4
CLFMI Chain Link Fence Manufacturers Institute
9891 Broken Land Parkway, Suite 300
Columbia, Maryland 21046
CRA California Redwood Association
405 Enfrente Drive, Suite 200
Novato, California 94949
CRI Carpet and Rug Institute
Box 2048
Dalton, Georgia 30722-2048
CRSI Concrete Reinforcing Steel Institute
933 N. Plum Grove Road
Schaumburg, Illinois 60173-4758
CS Commercial Standard of NBS
(U.S. Department of Commerce)
Government Printing Office
Washington, D.C. 20402
CSSB Cedar Shingle and Shake Bureau
515 116th Avenue, Suite 275
Bellevue, Washington 98004-5294
DHI Door and Hardware Institute
14170 Newbrook Drive
Chantilly, Virginia 22021-2223
EPA Environmental Protection Agency
401 M Street, SW
Washington, D.C. 20460
EWA Engineered Wood Association
P.O. Box 11700
Tacoma, Washington 98411-0700
FHA Federal Housing Administration
(U.S. Department of Housing and Urban Development)
451 7th Street, SW
Washington, D.C. 20201
FHVA Fine Hardwood Veneer Association
260 S. First Street, Suite 2
Zionsville, Indiana 46077
FM Factory Mutual Engineering Corporation
1151 Boston-Providence Turnpike
P.O. Box 9102
Norwood, Massachusetts 02062
FS Federal Specifications
See General Provisions
GA Gypsum Association
810 First, NE, Suite 510
Washington, D.C. 20002
GANA Glass Association of North America
3310 SW Harrison Street
Topeka, Kansas 66611-2279
12/97 01420-5
HI Hydronics Institute
35 Russo Place
P.O. Box 218
Berkeley Heights, New Jersey 07922
HMA Hardwood Manufacturers Association
(Formerly Southern Hardwood Lumber Manufacturers Association)
400 Penn Center Boulevard, Suite 531
Pittsburgh, Pennsylvania 15235
HPMA Hardwood Plywood Manufacturers Association
P.O. Box 2789
Reston, Virginia 22090-2789
IA Irrigation Association
1911 N. Fort Myer Drive, Suite 1009
Arlington, Virginia 22209-1630
ICBO International Conference of Building Officials
5360 S. Workman Mill Road
Whittier, California 90601
ICEA Insulated Cable Engineers Association, Inc.
P.O. Box 440
South Yarmouth, Massachusetts 02664
IEEE The Institute of Electrical and Electronics Engineers
345 E. 47th Street
New York, New York 10017-2394
IES Illuminating Engineering Society of North America
120 Wall Street, FI 17
New York, New York 10005-4001
IGCC Insulating Glass Certification Council
3393 Route 11, Industrial Park
P.O. Box 2040
Cortland, New York 13045-0950
ILIA Indiana Limestone Institute of America, Inc.
Suite 400, Stone City Bank Building
Bedford, Indiana 47421
KCMA Kitchen Cabinet Manufacturers Association
1899 Preston White Drive
Reston, Virginia 22091-4326
LIA Lead Industries Association, Inc.
295 Madison Avenue, 19th Floor
New York, New York 10017
MBMA Metal Building Manufacturers Association
1300 Sumner Avenue
Cleveland, Ohio 44115-2851
MFMA Maple Flooring Manufacturers Association
60 Revere Drive, Suite 500
Northbrook, Illinois 60062
MIA Marble Institute of America
30 Eden Alley, Suite 201
Columbus, Ohio 43215
12/97 01420-6
MIMA Mineral Insulation Manufacturers Association
1420 King Street
Alexandria, Virginia 22314
MLSFA Metal Lath/Steel Framing Association - A Division of NAAMM
8 South Michigan Avenue, Suite 1000
Chicago, Illinois 60603
MS Military Standardization Documents
See General Provisions
MSHA Mine Safety and Health Administration
4015 Wilson Boulevard, Room 601
Arlington, Virginia 22203
MSS Manufacturers Standardization Society of the Valve and Fittings Industry
127 Park Street, NE
Vienna, Virginia 22180
NAAMM The National Association of Architectural Metal Manufacturers
8 South Michigan Avenue, Suite 1000
Chicago, Illinois 60603
NACE National Association of Corrosion Engineers
1440 South Creek Drive
P.O. Box 218340
Houston, Texas 77218-8340
NAIMA North American Insulation Manufacturers Association
44 Canal Center Plaza, Suite 310
Alexandria, Virginia 22314
NAPA National Asphalt Pavement Association
NAPA Building
5100 Forbes Boulevard
Lanham, Maryland 20706-4413
NAPCA National Association of Pipe Coating Applicators
8th Floor, Commercial National Bank Building
333 Texas Street, Suite 800
Shreveport, Louisiana 71101-3673
NBS National Bureau of Standards
(U.S. Department of Commerce)(See NIST)
NCMA National Concrete Masonry Association
2302 Horse Pen Road
Herndon, Virginia 22071-3499
NEC National Electrical Code (by NFPA)
NECA National Electrical Contractors Association
3 Bethesda Metro Center, Suite 1100
Bethesda, Maryland 20814
NELM Northeastern Lumber Manufacturers' Association
272 Tuttle Road
P.O. Box 87A
Cumberland Center, Maine 04021-0687
12/97 01420-7
NEII National Elevator Industry, Inc.
185 Bridge Plaza North, Suite 310
Fort Lee, New Jersey 07024
NEMA National Electrical Manufacturers Association
2101 L Street, NW, Suite 300
Washington, D.C. 20037-1526
NFPA National Fire Protection Association
1 Batterymarch Park
P.O. Box 9101
Quincy, Massachusetts 02269-9101
NHLA National Hardwood Lumber Association
P.O. Box 34518
Memphis, Tennessee 38184-0518
NHPMA Northern Hardwood and Pine Manufacturers Association, Inc., c/o Northern Softwood Lumber Bureau
Box 217
Dear River, Minnesota 56636
NIOSH National Institute for Occupational Safety and Health
NIOSH Building 1, Room 3007
1600 Clifton Road, NE
Atlanta, Georgia 30333
NIST National Institute of Standards and Technology
(US Department of Commerce)
Administration Building, Room E128
Gaithersburg, Maryland 20899
Send requests for publications to:
Superintendent of Documents
Government Printing Office
Washington, D.C. 20402
NOFMA National Oak Flooring Manufacturers Association
P.O. Box 3009
Memphis, Tennessee 38173-0009
NPA National Particleboard Association
18928 Premiere Court
Gaithersburg, Maryland 20879-1569
NRCA National Roofing Contractors Association
O'Hare International Center
10255 W. Higgins Road, Suite 600
Rosemont, Illinois 60018-5607
NSF National Sanitation Foundation
3475 Plymouth Road
P.O. Box 130140
Ann Arbor, Michigan 48113-0140
NTMA The National Terrazzo and Mosaic Association
3166 Des Plaines Avenue, Suite 132
Des Plaines, Illinois 60018
12/97 01420-8
NWWDA National Wood Window and Door Association
1400 East Touhy Avenue, Suite 470
Des Plaines, Illinois 60018
OSHA Occupational Safety and Health Administration
(U.S. Department of Labor)
Government Printing Office
Washington, D.C. 20402
PCA Portland Cement Association
5420 Old Orchard Road
Skokie, Illinois 60077-1083
PCI Precast/Prestressed Concrete Institute
175 W. Jackson Boulevard
Chicago, Illinois 60604
PDI Plumbing and Drainage Institute
45 Briston Drive, Suite 101
South Euston, Massachusetts 02375
PEI Porcelain Enamel Institute, Inc.
4004 Hillsboro Pike, Suite 224-B
Nashville, Tennessee 37215
PI Perlite Institute, Inc.
88 New Dorp Plaza
Staten Island, New York 10306
PS Product Standard of NBS (U.S. Department of Commerce)
Government Printing Office
Washington, D.C. 20402
RFCI Resilient Floor Covering Institute
966 Hungerford Drive, Suite 12-B
Rockville, Maryland 20850
RIS Redwood Inspection Service (Grading Rules)
405 Enfrente Drive, Suite 200
Novato, California 94949
RMMI Rocky Mountain Masonry Institute
1780 South Bellaire Street, No. 602
Denver, Colorado 80222
SCMA Southern Cypress Manufacturers Association
400 Penn Center Blvd., Suite 530
Pittsburgh, Pennsylvania 15235
SDI Steel Deck Institute
P.O. Box 9506
Canton, Ohio 44711
SDI Steel Door Institute
30200 Detroit Road
Cleveland, Ohio 44145-1967
SFPA Southern Forest Products Association
P.O. Box 52468
New Orleans, Louisiana 70152
12/97 01420-9
SGCC Safety Glazing Certification Council
ETL Testing Labs, Inc., Industrial Park
3933 U.S. Route 11
P.O. Box 2040
Cortland, New York 13045-0950
SIGMA Sealed Insulating Glass Manufacturers Association
401 N. Michigan Avenue
Chicago, Illinois 60611
SJI Steel Joist Institute
3127 10th Avenue, North Ext.
Myrtle Beach, South Carolina 29577-6760
SMACN
A
Sheet Metal and Air-Conditioning Contractors' National Association
4201 Lafayette Center Drive
Chantilly, Virginia 22021
SPIB Southern Pine Inspection Bureau (Grading Rules)
4709 Scenic Highway
Pensacola, Florida 32504-9094
SSPC Steel Structures Painting Council
40 24th Street, 6th Floor
Pittsburgh, Pennsylvania 15222-4643
SWI Steel Window Institute c/o Thomas Associates, Inc.
1300 Sumner Avenue
Cleveland, Ohio 44115-2851
TCA Tile Council of America
100 Clemson Research Boulevard
Anderson, South Carolina 29625
TIMA Thermal Insulation Manufacturers Association (See NAIMA)
TPI Truss Plate Institute
583 D'Onofrio Drive, Suite 200
Madison, Wisconsin 53719
UBC Uniform Building Code (by ICBO)
UL Underwriters Laboratories, Inc.
333 Pfingsten Road
Northbrook, Illinois 60062
USDA U.S. Department of Agriculture
Independence Avenue, between 12th and 14th Streets, SW
Washington, D.C. 20250
WCLB West Coast Lumber Inspection Bureau (Grading Rules)
P.O. Box 23145
Portland, Oregon 97281
WIC Woodwork Institute of California
P.O. Box 980247
3164 Industrial Boulevard
West Sacramento, California 95798-0247
12/97 01420-10
WMMPA Wood Moulding and Millwork Producers Association
P.O. Box 25278
Portland, Oregon 97225-0278
WRI Wire Reinforcement Institute, Inc.
203 Loudoun Street, SW
Leesburg, Virginia 22075
WSFI Wood and Synthetic Flooring Institute (See MFMA)
WWPA Western Wood Products Association (Grading Rules)
Yeon Building
522 S.W. 5th Avenue
Portland, Oregon 97204-2122
WWPA Woven Wire Products Association
2515 Nordica Avenue
Chicago, Illinois 60635
PART 2 PRODUCTS- NOT USED.
PART 3 EXECUTION- NOT USED.
PART 4 MEASUREMENT AND PAYMENT- NOT USED.
12/97 01430-1
CONTRACTOR QUALITY CONTROL
SECTION 01430
A. The work of this section consists of preparing and executing a quality control program during performance of this painting contract.
1 .2 SUBMITTALS
A. Quality Control Plan: At the time of the preconstruction conference, submit for approval a written Contractor
Quality Control (CQC) plan. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan within 10 days. The Government reserves the right to require changes in the plan during the contract period as necessary to obtain the quality specified. No change in the approved plan may be made without written concurrence by the Contracting Officer. The plan shall include:
1. A list of personnel responsible for quality control and assigned duties. Include each person's qualifications.
2. A copy of a letter of direction to the Contractor's quality control supervisor outlining assigned duties.
3. Names and descriptions of laboratories to perform sampling and testing, and samples of proposed report forms.
4. Methods of monitoring and controlling environmental pollution and contamination as required by regulations and laws.
5. Methods of performing, documenting, and enforcing quality control of all work.
B. Daily Submittals: Submit Daily Quality Control Report showing all inspections and tests on the first workday following the date covered by the report.
C. Tests: Submit triplicate copies of complete test results not later than three calendar days after the test was performed. Submit failing test results and proposed remedial actions within four hours of noted deficiency.
D. Off Site Inspection Reports: Submit prior to shipment.
E. Progress Payments: If the CQC plan and Daily Quality Control Reports are not submitted in a timely manner, the Contracting Officer may retain an appropriate amount of the applicable progress payment.
1 .3 QUALITY ASSURANCE
A. General: Except for tests or other items of work specified to be performed by the Government, the quality of all work shall be the responsibility of the Contractor. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings.
B. Quality Control Staff: The Contractor's job supervisory staff may be used for quality control, supplemented as necessary by additional technicians. The Contractor's designated Quality Control Supervisor shall be employed full time at the project site whenever contract work is in progress.
12/97 01430-2
PART 2 PRODUCTS NOT USED.
3 .1 OFF-SITE CONTROL
A. Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication.
3 .2 ON-SITE CONTROL
A. Notify the Contracting Officer at least 24 hours in advance of the initial and follow-up phases.
B. Preparatory: Perform before beginning each feature of work.
1. Review control submittal requirements with personnel directly responsible for the quality control work.
2. Ensure that provisions have been made for field control testing.
3. Examine the work area to ensure that all preliminary work has been completed.
4. Verify all field dimensions and advise the Contracting Officer of discrepancies.
5. Ensure that necessary equipment and materials are at the project site and that they comply with approved shop drawings and submittals.
C. Initial: As soon as work begins, inspect and test a representative portion of a particular feature of work for quality of workmanship. Review control testing procedures to ensure compliance with contract requirements.
D. Follow-Up: Inspect and test as work progresses to ensure compliance with contract requirements until completion of work.
3 .3 DOCUMENTATION
A. Maintain Daily Quality Control Reports (sample attached) of quality control activities and tests. Daily Quality
Control Reports may not be substituted for other written reports required under the General Provisions, such as
Disputes, Differing Site Conditions, or Changes.
3 .4 ENFORCEMENT
A. The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff or the Contracting Officer. Construction shall not proceed on any feature of work containing uncorrected work.
4 .1 CONTRACTOR QUALITY CONTROL
12/97 01430-3
CONTRACTOR'S Q.C. DAILY REPORT
REPORT NO. SHEET 1 OF
PROJECT CONTRACT NO. DATE
PARK CONTRACTOR'S REPRESENTATIVE ON THE JOB
WEATHER (Rain, Snow, Cloudy, Windy, etc.)
RAINFALL
Inches
TEMPERATURE GROUND CONDITIONS (Dry, Damp, Wet, Frozen, etc.)
MAX. MIN.
1. PRIME CONTRACTOR
NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON
JOB
NO.
UNITS
HRS. WORKING
YES NO Comments
WORK PERFORMED BY PRIME CONTRACTOR:
MATERIALS DELIVERED OFFICIAL VISITORS TO SITE
2A. SUBCONTRACTOR, : (If more than one subcontractor use copies of following page.)
NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON
JOB
NO.
UNITS
WORK PERFORMED BY SUBCONTRACTOR:
3. SPECIFIC INSPECTIONS: (Inspections performed, results, and corrective actions)
4. TESTING: 1 Check if any testing was performed today. (Complete and attach Test Report Information Sheets.)
Type and Location of Testing:
5. VERBAL INSTRUCTION RECEIVED FROM GOVERNMENT ON CONSTRUCTION DEFICIENCIES OR RE-TESTING
REQUIRED:
6. REMARKS:
7. CERTIFICATION:
I certify that the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the prime contractor and each subcontractor and determined that all materials, equipment, and workmanship are in strict compliance with the plans and specifications except as may be noted above.
Contractor's Designated Quality Control Representative
12/97 01430-4
SUBCONTRACTOR WORK CONTINUED: CONTRACT NO. REPORT NO.
SHEET OF
2 SUBCONTRACTOR,
NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON
JOB
NO.
UNITS
2 SUBCONTRACTOR,
NO. EMPLOYEES BY JOB CATEGORIES Hours HEAVY EQUIPMENT ON
JOB
NO.
UNITS
JOB
NO.
UNITS
JOB
NO.
UNITS
YES NO COMMENTS
12/97 01430-5
TEST REPORT INFORMATION SHEET
CONTRACT NO. REPORT NO.
SHEET OF
1. Individual Making Inspection or Test:
2. Testing Laboratory; Name: Phone #:
Address:
3. Description of Work and Test Method:
4. Location of Samples and Tests or Inspections:
5. Specification Section:
6. Inspection or Test Data:
7. Test Results and Interpretations of Test Results:
8. Comments or Professional Opinion About Compliance of Inspected Work or Tested Work with contract Document Requirements:
9. Recommendations:
10. Corrective Actions Taken:
CERTIFICATION:
I certify that the above testing report is complete and correct and that all testing performed this day for this contract is in strict compliance with the plans and specifications except as noted above.
Signature of Inspector
SECTION 1600
MATERIAL AND EQUIPMENT
A. The work of this section consists of the general procedures for handling, storing, and protecting material and equipment.
1 .2 TRANSPORTATION AND HANDLING
A. Arrange deliveries of materials in accordance with construction schedules; coordinate to avoid conflict with work and conditions at the site. Deliver materials in undamaged condition, in manufacturer's original containers or packaging, with identifying labels intact and legible.
Contractor is encouraged to obtain materials in biodegradable or recyclable/reusable packaging which uses the minimum amount of packaging possible.
1 .3 STORAGE AND PROTECTION
A. Store materials in accordance with manufacturer's instructions, with seals and labels accessible for inspection.
B. Interior Storage: Maintain temperature and humidity within the ranges required by manufacturer's instructions.
C. Exterior Storage:
1. Store products subject to damage by the elements in weathertight enclosures.
2. Store fabricated products above the ground, on blocking or skids; prevent soiling or staining. Cover products subject to damage or deterioration with impervious sheet coverings; provide adequate ventilation to avoid condensation.
3. Store loose granular materials in a well-drained area on solid surfaces to prevent mixing with foreign matter.
D. Protection After Installation: Provide adequate coverings as necessary to protect installed materials from damage resulting from natural elements, traffic, and subsequent construction.
Remove when no longer needed.
3 .1 MATERIAL AND EQUIPMENT
12/97 01600-1
MATERIAL AND EQUIPMENT
SECTION 100
07/99 01770-1
PROJECT CLOSEOUT
A. The work of this section consists of final cleanup, closeout submittals, and final inspection procedures.
PART 2 PRODUCTS
2 .1 CLEANING MATERIALS
A. As recommended by the manufacturer of the surface to be cleaned.
3 .1 CLEANING
A. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces.
Thoroughly clean building interiors. Pick up all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.
3 .2 CLOSEOUT SUBMITTALS
A. Submit before final inspection request.
1. Guarantees and Bonds: As specified in individual sections.
2. Spare Parts and Materials: As specified in individual sections.
3. All product submittals are provided and accepted.
3 .3 SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. When project, or designated portion of project, is substantially complete, request in writing a final inspection. Upon receipt of written request that project is substantially complete, the Contracting
Officer will proceed with inspection within 10 days of receipt of request or will advise the
Contractor of items that prevent the project from being designated as substantially complete.
B. If, following final inspection, the work is determined to be substantially complete, Contracting
Officer will prepare a list of deficiencies to be corrected before final acceptance and issue a Letter of Substantial Completion. Contractor shall complete the work described on the list of deficiencies within 30 calendar days, as weather permits. If the Contractor fails to complete the work within this time frame, the Contracting Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for reinspection costs in accordance with the Inspection of Construction clause of the contract..
07/99 01770-2
C. If, following final inspection, the work is not determined to be substantially complete, Contracting
Officer will notify Contractor in writing. After completing work, Contractor shall request a new final inspection. All reinspection costs may be charged against the Contractor in accordance with the Inspection of Construction clause of the contract.
3 .4 FINAL ACCEPTANCE OF THE WORK
A. After all deficiencies have been corrected, a Letter of Final Acceptance will be issued.
4 .1 PROJECT CLOSEOUT
SECTION 09900 - PAINTING
09900-1
PART 1: GENERAL
1.01 SUMMARY
A. The work done under this contract includes all labor, materials and incidentals required to do a complete job of painting the exterior of government buildings located within Point Reyes NS.
B. “Paint”, as used herein, means all coating systems materials, including primers. emulsions, enamels, sealers, and fillers, stains, and other applied materials, whether used as prime, intermediate, or finish coats.
C. All surfaces previously painted are to be repainted including walls, trim and railings. The colors shall match existing and will be determined at a later date and selected by the Contracting Officer.
D. Surfaces to be painted will include: all wall surfaces previously painted, new wood, wood window frames (sash not to be painted), pipes and conduits attached to the exterior wall surfaces, metal flashing except roof vent pipes, decorative items, or items whose operation will be compromised, electrical circuit panels, rafter tails, gutters, and exposed surfaces of foundations.
E. Contractor will be required to seal all existing gaps between wall surfaces and trim using a non-shrink, paintable caulk.
1.02 SUBMIITTALS
A. Manufacturer’s Data: Submit three copies of manufacturer’s specifications, including paint label analysis and application instructions for each material specified. Data is to be submitted and approved before work begins.
B. Colors: Paint samples may be taken from the buildings to allow the
Contractor’s paint supplier to match the existing colors as closely as possible. The final determination of actual color shall be selected by the
Contracting Officer. Samples to be 36” x 36” minimum; provide adequate samples until sheen and finish are acceptable. These will serve as quality comparisons.
C. Sealants and caulks: Provide three samples of proposed products.
D. As specified in Section 01300.
09900-2
1.03 CLOSEOUT SUBMITTAL
A. As specified in Section 01770
B. Provide manufacturers maintenance and cleaning data
C. Submit one gallon of virgin paint for each color selected
1.04 QUALITY ASSURANCE
A. Qualifications of Painters: Use only qualified journeyman painters for the mixing application of paint on exposed surfaces; in the acceptance or rejection of installed painting, no allowance will be made for the lack of skill on the part of the painters. Contractor will possess a valid C-33
Painting and Decorating license from the State of California.
B. Project inspection: Surface preparation and application of primer(or first coat) on the trim and all other painted surfaces shall be inspected (and approved) by the Contracting Officer prior to the next (or final) coat of paint shall be applied.
C. Inspection and acceptance of the primer or first coat application by the
Contracting Officer is required before the contractor may proceed to the next phase of the painting operation.
D. Federal Specifications: Federal Specifications referenced define the general type and quality of paint required, but are not intended to limit acceptable materials to an exact formulation.
E. Comply with applicable regulations of OSHA, 28 CFR 1926-1993, and
EPA and State of California regulations regarding Volatile Organic
Compounds (VOC).
F. Paint thickness, where specified, is minimum dry film thickness. Paint thickness shall meet manufacturer’s recommendation for minimum dry film thickness measured in mils.
G. For unspecified materials such as turpentine or linseed oil, provide best grade recommended by selected manufacturer.
H. Guarantee all surface finishes for the guarantee period to remain free of defects including serious or uneven fading, and evidence of blistering, peeling or chalking
09900-3
1.05 PRODUCT HANDLING
A. Delivery and Storage: Deliver all materials to the job site in original, new, and unopened packages and containers bearing manufacturer’s name and level.
1.06 HAZARDOUS MATERIALS
A. Preparing historic buildings for new paint will likely disturb existing, lead-based paint finishes. The contractor shall comply with applicable codes and regulations regarding the removal and disposal of lead paint. Part 3
– Execution, below, describes several procedures the Park expects the contractor to include in the lead-based paint removal and disposal safety plan. The contractor shall ensure that removal and disposal regulations are met, and worker safety is maintained
1.07 PROJECT CONDITIONS
A. Use extra care in the protection, preparation, and painting of features and materials on historic structures. Protect adjacent historic and non-historic materials.
B. The use of burning tools or any…
This is the start of the file's text. The full file is on GovTribe.