QA_0002.pdf
PDF 59 KB Posted
- Attached to
- LARO- FY26 Fire Alarm Repairs, Kettle Falls, WA.
- Solicitation number
- 140P8326Q0005
About this file
This is a Questions and Answers (Q&A) document for the LARO Fire Protection project addressing contractor inquiries about system repair scope and execution requirements.
The document clarifies that a lift will be required to access sprinkler heads, with one access panel available for measuring dry sprinkler head dimensions. The existing system is confirmed as a wet system with upright heads integrated into that wet system. For newly installed sprinkler heads, pressure testing requirements are detailed in a referenced PDF attachment containing a previous example. The 1-inch copper water line replacement is explicitly included as part of the fire sprinkler system repair in accordance with the stated scope of work. Final testing and inspection are mandatory prerequisites for project acceptance and payment; permit requirements follow standard commercial practice if applicable. The document does not address pricing terms, response dates, or award information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8326Q0005_Amd_0002.pdf | ||
| Inspections_report_0002.pdf | ||
| Site_VIsit_Roster_3-13-26_0002.pdf | ||
| Sol_140P8326Q0005_Amd_0001.pdf | ||
| sprinkler_map.pdf | ||
| Sol_140P8326Q0005.pdf | ||
| Final_SOW_FY246_LARO_Repair_KF_Fire_Suppression_System_12162025.pdf | ||
| B08_Past_Performance_Questionaires.docx | DOCX document | |
| SCA_WD_2015-5537_20251203.pdf | ||
| B08_Forms_to_Return_with_QUOTE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LARO Fire Protection QA
Q.1. Will a lift be required to access any of the sprinkler heads?
A.1. Yes a lift will be required.
Q.2. Are there access panels available to measure the dry sprinkler heads?
A.2. There is one access panel available to measure the dry sprinkler heads.
Q.3. What type of pressure test will be required for the newly installed heads?
A.3. See the PDF attachment for a previous example.
Q.4. Will a permit be required for this project, and will a final inspection be necessary?
A.1. Final test and inspection will be necessary, before acceptance and payment.
Requirements for a permit is unknown. If that is standard commercial practice, then yes.
Q.5.Is the copper water line included as part of the fire sprinkler system repair?
A.5. Yes supply/installation of the copper water line is part of the system repair in accordance with the scope of work.
Q.6. Can you confirm whether the existing sprinkler system is a wet system or a dry system, and if the dry barrel upright heads are part of a larger dry system or installed on a wet system?
A.6. It is a wet system. Upright heads are part of the wet system.
Q.7. Also, for the copper pipe replacement, can you confirm whether the 1” copper line is part of the fire sprinkler system or part of a domestic water line?
A.7. The 1" copper line is part of the fire sprinkler system.