Inspections_report_0002.pdf
PDF 466 KB Posted
- Attached to
- LARO- FY26 Fire Alarm Repairs, Kettle Falls, WA.
- Solicitation number
- 140P8326Q0005
About this file
This is an inspection record form for a fire suppression system valve. The document is a handwritten inspection checklist used to document the operational status and performance parameters of a wet system fire suppression valve during an annual inspection cycle.
The form indicates that inspections are performed annually and captures critical system data including static water pressure (39 PSI), residual water pressure (05 PSI), and confirmation that alarms operated (YES). The inspection documents whether low points were drained (checkmark present) and confirms the supply valve was left open (YES). Additional fields include air pressure, air pressure trip point, trip time in seconds, and water flow time, though these were not completed during this inspection. The valve is identified as a 2½" Grinnell model F2000 series, with the inspection noted as occurring on 12/15/25 and signed off by an inspector. A handwritten note indicates "Gong only" relative to the air pressure field. This form serves as a maintenance and compliance record for fire protection system equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8326Q0005_Amd_0002.pdf | ||
| QA_0002.pdf | ||
| Site_VIsit_Roster_3-13-26_0002.pdf | ||
| Sol_140P8326Q0005_Amd_0001.pdf | ||
| sprinkler_map.pdf | ||
| Sol_140P8326Q0005.pdf | ||
| Final_SOW_FY246_LARO_Repair_KF_Fire_Suppression_System_12162025.pdf | ||
| B08_Past_Performance_Questionaires.docx | DOCX document | |
| SCA_WD_2015-5537_20251203.pdf | ||
| B08_Forms_to_Return_with_QUOTE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .