This is a vendor questions and answers document for solicitation 140P8325R0002, a bathroom rehabilitation project at Craters of the Moon National Park Visitor Center. The document contains 8 questions and responses related to technical specifications and timeline details.
Key clarifications include: all water closets must be wall mounted, ADA Safety Aprons are required for visitor-accessible sinks, and the contractor is responsible for planning the plumbing system layout while adhering to local codes. No structural changes are needed as this is a straightforward remodel with existing wall-mounted toilets and water lines. Specific product requirements include Bobrick B-2706C Classic Series Surface-Mounted Napkin/tampon Vendor and Bobrick B-270 sanitary napkin disposal. Important dates are: site visit scheduled for 2/18/2025 at 10:00 PM MST (RSVP required by 2/17/2025), question cut-off on 3/05/2025 at noon MST, and RFP closing on 3/17/2025 at noon MST.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vendor questions and Park responses #1-#8 140P8325R0002 CRMO Visitor Center Bathroom Rehabilitation Project
NOTE: Clarification for Vendors:
This is a straightforward remodel. No structural issues, the toilets are already wall mounted, the water lines are already in place.
1. 22 40 00 6 2.2 calls for wall mounted water closets. Drawing A1 states wall or floor mounted water closets, please verify.
1. Response: All water closets shall be wall mounted.
2. 22 40 00 6 2.4 A7 A8 calls for ADA tailpiece and to insulate exposed pipes. Drawing
A1 shows an ADA safety apron, what is your preference? No
2. Response: All sinks, accessible to visitors, shall have an ADA Safety Apron.
3. Will the existing utility lines need to be re routed or will they stay in place?
3. Response: The Contractor shall be responsible for planning and organizing the plumbing system's layout to ensure its efficient and effective functionality, to include the necessary plumbing tasks. This encompasses determining the placement of pipes, fixtures, and other essential components, all while adhering to local plumbing codes and regulations. The plumber will follow industry best practices to ensure safety and reliability.
4. Are the carriers existing or will they need to be supplied?
4. Response: Is this question about structural carriers? No walls are to be moved;
only surface finishes will be altered. Any construction to the walls shall not change the structural integrity of the wall.
5. If we are re-routing the H2O and drain lines what are the tie-in sizes, materials and where are they located?
5. Response: The Contractor shall be responsible for planning and organizing the plumbing system's layout to ensure its efficient and effective functionality, to include the necessary plumbing tasks. This encompasses determining the placement of pipes, fixtures, and other essential components, all while adhering to local plumbing codes and regulations. The plumber will follow industry best practices to ensure safety and reliability.
6. The specifications and drawings only callout 36” and 42” grab bars, however drawing
A1 shows an 18” grab bar in the vertical position is this correct?
Vendor questions and Park responses #1-#8 140P8325R0002 CRMO Visitor Center Bathroom Rehabilitation Project
6. Response: The typical detail sheet, designated as A1, is included for reference and illustrative purposes. This sheet provides examples of work and elements that may be but are not necessarily within the scope of this particular contract. It is the responsibility of the Contractor to review the typical detail sheet in conjunction with the specific project requirements outlined in the Contract Documents.
7. Drawing A4 calls out item 7 as a Bobrick B-270 aka sanitary napkin disposal, drawing
A5 detail 8 A4 also has an item 7 but it is not a disposal. Can you provide the schedule information for this item?
7. Response: Sanitary napkin dispenser: Bobrick B-2706C Classic Series Surface-
Mounted Napkin/tampon Vendor, Free Vend Operation (Satin)
Sanitary napkin disposal: Bobrick B-270
8. Will you please clarify if the time mentioned below is accurate:
8. Response:
Request for Proposal (RFP) Closes:
3/17/2025 NOON MST
Question cut-off: 3/05/2025 NOON MST
Site Visit Scheduled for:
2/18/2025 10:00 PM MST
email geraldine_larsen@nps.gov no later than
2/17/2025 to attend.