This is a Questions & Answers document for solicitation 140P8325R0002, concerning the rehabilitation of restrooms at Craters of the Moon National Preserve Visitor Center. The document contains 19 vendor questions and National Park Service responses, clarifying technical specifications and project requirements.

Key details include: the project is a straightforward remodel with no structural changes; all water closets must be wall-mounted; ADA Safety Aprons are required for visitor-accessible sinks; urinals are to be replaced with washout urinals; the flooring/wainscot system requires re-application of epoxy rather than tile; paint color is specified as Sherwin Williams Antique White; and new entry/exit doors, lighting, and sprinkler heads are required. Important dates include: RFP closing on 3/17/2025 at noon MST, question cut-off on 3/05/2025 at noon MST, and work to commence 12/1/2025 with a 90-day completion period. The facility will be closed to the public from December 1, 2025, to January 29, 2026, with limited access available during holiday weeks.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor questions and Park responses #1-#8 140P8325R0002 CRMO Visitor Center Bathroom Rehabilitation Project NOTE: Clarification for Vendors:

This is a straightforward remodel. No structural issues, the toilets are already wall mounted, the water lines are already in place.

1. 22 40 00 6 2.2 calls for wall mounted water closets. Drawing A1 states wall or floor mounted water closets, please verify.

1. Response: All water closets shall be wall mounted.

2. 22 40 00 6 2.4 A7 A8 calls for ADA tailpiece and to insulate exposed pipes. Drawing A1 shows an ADA safety apron, what is your preference? No

2. Response: All sinks, accessible to visitors, shall have an ADA Safety Apron.

3. Will the existing utility lines need to be re routed or will they stay in place?

3. Response: The Contractor shall be responsible for planning and organizing the plumbing system's layout to ensure its efficient and effective functionality, to include the necessary plumbing tasks. This encompasses determining the placement of pipes, fixtures, and other essential components, all while adhering to local plumbing codes and regulations. The plumber will follow industry best practices to ensure safety and reliability.

4. Are the carriers existing or will they need to be supplied?

4. Response: Is this question about structural carriers? No walls are to be moved; only surface finishes will be altered. Any construction to the walls shall not change the structural integrity of the wall.

5. If we are re-routing the H2O and drain lines what are the tie-in sizes, materials and where are they located?

5. Response: The Contractor shall be responsible for planning and organizing the plumbing system's layout to ensure its efficient and effective functionality, to include the necessary plumbing tasks. This encompasses determining the placement of pipes, fixtures, and other essential components, all while adhering to local plumbing codes and regulations. The plumber will follow industry best practices to ensure safety and reliability.

6. The specifications and drawings only callout 36” and 42” grab bars, however drawing A1 shows an 18” grab bar in the vertical position is this correct?

6. Response: The typical detail sheet, designated as A1, is included for reference and illustrative purposes. This sheet provides examples of work and elements that may be but are not necessarily within the scope of this particular contract. It is the responsibility of the Contractor to review the typical detail sheet in conjunction with the specific project requirements outlined in the Contract Documents.

7. Drawing A4 calls out item 7 as a Bobrick B-270 aka sanitary napkin disposal, drawing A5 detail 8 A4 also has an item 7 but it is not a disposal. Can you provide the schedule information for this item?

7. Response: Sanitary napkin dispenser: Bobrick B-2706C Classic Series Surface-Mounted Napkin/tampon Vendor, Free Vend Operation (Satin)

Sanitary napkin disposal: Bobrick B-270

8. Will you please clarify if the time mentioned below is accurate:

8. Response:

Request for Proposal (RFP) Closes:

3/17/2025 NOON MST

Question cut-off: 3/05/2025 NOON MST

Site Visit Scheduled for:

2/18/2025 10:00 AM MST

email geraldine_larsen@nps.gov no later than 2/17/2025 to attend.

2/21/2025

Question #9 Will you please confirm that the product used for the bathroom flooring is as stated in the spec section 09-67-23 part ‘J’.

Park Response: The system consisted of a moisture vapor transmission barrier on the floor and a Lt Gray base coat with a double broadcast of "0" size chips creating a color blend called "Salt & Pepper". The broadcast was completed both the floors and walls to 4'--4''height. A clear urethane topcoat was then applied to seal all surfaces. Epoxy Systems, Inc. was the company that was hired to do the epoxy install.

Question #10 During the site walk through on 2/18, it was noted that the urinals in the men's bathroom are to be replaced with flushing models. This is consistent with the plumbing fixtures called out on A4 but note 8 on A2 states they are to remain. Can you confirm that this scope of work includes the replacement of existing urinals with the flushing units shown on the plumbing schedule.

Park Response: Yes. Urinals are to be replaced with washout urinals.

Question # 11:

Q: What color of paint?

A: Sherwin Williams Antique White Question # 12 Q: Does the project include new entry/exit doors?

A: Yes, new doors are needed.

Question # 13:

Q: Is the lighting part of the fixtures that need to be replaced?

A: Yes Question # 14:

Q: Are the sprinkler heads part of the fixtures that need to be replaced?

A: Yes Question # 15

15. Solicitation says work to start 12-1-25 with a 90 day completion. This is in the holiday schedule. What days will the facility be closed during December, January and February? Can the finish date be extended because of these holidays?

Park Response: The park will be closed to the public beginning December 1, 2025 to January 29, 2026. We can work with the contractor to grant access if needed, the week of 12/22/2025 – 01/04/2026. The finish date will not be extended.

Question # 16

16. During the walk-through we were told/saw that the wainscot is to be epoxy. The plans/specs call for tile. Can this be clarified?

Park Response: There is no tile work to be done. The current epoxy needs to be re-applied.

Question # 17:

17. Is it the intent to completely remove the existing epoxy flooring/wainscot or can we “refresh” what is existing?

Park Response: The specific approach, whether through re-epoxy or other refreshing techniques, is secondary to the importance of ensuring that the quality of the product remains on par with that of the initial installation. As you saw, the restrooms have held up amazingly well since the last remodel 20 years ago and we are committed to achieving a similar level of quality and longevity with this upcoming project.

Question # 18

18. Drawings sheet 4 sheet A2 note 8 says “Existing urinals to remain” but on sheet A4 plumbing schedule #16 provides specs for new urinals. Also, during our pre-bid walk we were told that the existing would be replaced. Please clarify.

Park Response: Existing urinals are to be replaced with washout urinals. The drawings are currently being revised.

Question # 19

19. Drawings sheet 6 A4 plumbing schedule #3 only shown 2 grab bar sizes but code requires an 18” grab bar as well as detailed in the TYP accessible details on A1 sheet 3.

Park Response: Vertical grab bars are not explicitly required by the ADA/ABA/ABAAS guidelines. However, these bars are often mandated by the American National Standards Institute (ANSI) guidelines and various local, state, and city building codes. These regulations are designed to ensure that buildings and facilities are accessible and usable for all individuals.

In light of this, it is essential for the contractor to adhere to the most appropriate and applicable standard. This is why vertical grab bars are included in the TYP accessible details on sheet A1-3. This inclusion ensures compliance with the highest standards of accessibility and usability, as per ANSI and local building codes, even if not directly required by ADA/ABA/ABAAS guidelines.