BIHO - 186113

050611

01 57 23.10 - 1

UNDER-AN-ACRE POLLUTION PREVENTION

SECTION 01 57 23.10 – UNDER-AN-ACRE POLLUTION PREVENTION

PART 1 - GENERAL

1.1 SUMMARY

A. NPS Standards and Guidelines require that water quality be protected at all times to ensure compliance with the Organic Act. The Contractor shall prepare an Under-An-Acre Pollution Prevention Plan (UPPP) for each project resulting in less than 1 acre of soil disturbance or not otherwise subject to the requirements of the NPDES program.

https://www.nps.gov/dscw/upload/UnderAnAcre-UPPP_Guideline_3-30-16_AF_120417.pdf.

B. The work of this section consists of implementing measures to Temporary Storm Water Pollution during construction activities, either through compliance with the NPDES permit program; Or in conformance with NPS guidance for UPPPs.

1.2 DEFINITIONS

A. Environmental Pollution and Damage: The presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances;

or degrade the utility of the environment for aesthetic, cultural, or historical purposes.

B. UPPP: Developed and implemented pollution prevention plan (including stormwater management measures, if needed) to protect the environment from pollutants on construction projects with less than one acre of disturbance in conformance with NPS guidelines.

1.3 SUBMITTALS

A. After contract award and before the pre-construction conference, prepare and submit:

1. A UPPP in conformance with NPS guidelines and adherence to all applicable construction storm water management practices.

B. Inspection Schedule: Submit schedule for inspection and monitoring of all pollution prevention measures.

C. Erosion Control Products: Submit manufacturer’s product information and installation recommendations for silt fence, filter fabric, erosion control blanket, straw bales, and any other materials proposed for use on this project.

1.4 QUALITY ASSURANCE

A. The Contractor shall prepare and submit a plan to the Contracting Officer (CO) for review and concurrence.

B. Orientation Meeting: The Contractor shall be responsible for arranging and conducting a Pollution Prevention meeting/briefing to inform all parties scheduled to be on-site during the project of the

01 57 23.10 - 2

TEMPORARY STORM WATER POLLUTION PREVENTION

measures to be implemented for proper pollution prevention and control (may be included as part of the Pre-Construction Meeting).

1. Installation of silt fences, storm drain protection, and all other forms of pollution prevention controls shall not begin until after this meeting has occurred.

C. Pollution Prevention Manager: The Contractor shall designate the Pollution Prevention Manager who will be responsible for the implementation, inspection, maintenance, and amendments to the approved plan.

1. The Pollution Prevention Manager shall be familiar with UPPP procedures and Best Management Practices (BMPs) and shall ensure that emergency procedures and the plan are updated as needed and available for inspection.

2. When changes in the approved plan are required, the Pollution Prevention Manager shall prepare and certify an amendment and submit to the CO for review and concurrence.

PART 2 - PRODUCTS

2.1 UNDER-AN-ACRE POLLUTION PREVENTION PLAN:

A. Provide a UPPP which conforms to all NPS requirements (utilize UPPP template) and include the following information and forms:

1. Responsible Parties

2. General Information: Project Scope, Project Details, Site Information, and Spill

Prevention.

3. Standards and Constraints

4. Project Scheduling

5. Known Data on Soil and Fill

6. Activities with the Potential to Generate Sediment

7. Activities and Materials with the Potential to Pollute Storm Water

8. Management and Reporting BMPs

9. Waste Management BMPs

10. Non-Storm Water Pollution Control BMPs

11. Soil Stabilization BMPs

12. Sediment Control BMPs

PART 3 - EXECUTION

3.1 ENVIRONMENTAL PROTECTION

A. Protection of Natural Resources: Comply with applicable regulations and these specifications.

Preserve the natural resources within the project boundaries and outside the limits of work performed under this Contract in their existing condition or restore to an equivalent or improved condition as approved by the CO.

http://www.nps.gov/dscw/publicforms.htm

01 57 23.10 - 3

TEMPORARY STORM WATER POLLUTION PREVENTION

B. Construction Zone: Arrange construction activities to minimize pollution (i.e., erosion, trash, etc.)

to the maximum practical extent.

1. Clearing, excavation, and grading shall be limited to those areas of the project site necessary for construction. Minimize the area exposed and unprotected.

2. Clearly mark and delineate the limits of work activities.

3. Equipment shall not be allowed to operate outside the limits of work or to disturb existing vegetation.

4. Excavation and grading shall be completed during the dry season to the maximum extent possible

5. Material should be stored away from locations where water is present to the greatest extent practicable.

3.2 UNDER-AN_ACRE POLLUTION PREVENTION PLAN

A. Review and Acceptance: The Contractor and the CO will jointly review the draft Plan and agree to any needed revisions. The Contractor shall incorporate all revisions, sign, and submit the final Plan to the CO. The final Plan will be the document enforced on the project.

1. The accepted Plan will describe and ensure implementation of the practices which will be used to reduce the pollutants in storm water discharges.

2. The Contractor shall maintain a current copy of the Plan and all associated records and forms at the jobsite throughout the duration of the project.

3. The Plan shall be available at all times for public inspection and for the inspection and use of the CO.

4. Approval of Contractor’s Plan will not relieve the Contractor of responsibility for compliance with applicable environmental regulations.

B. Implementation: Implement the Plan as required throughout the construction period and maintain all erosion control elements in proper working order.

1. Do not perform clearing and grubbing or earthwork until the Plan has been implemented.

3.3 SITE INSPECTIONS AND PLAN REVISIONS

A. Inspections: The Contractor and the CO will perform a weekly inspection of the site during periods of earth disturbance.

1. The inspection shall include disturbed areas that have not been completely stabilized, areas used for storage of materials, locations where vehicles enter or exit the site, and all other erosion and sediment controls that are included in the Plan.

2. Inspections shall be documented.

3. The inspection forms shall be retained onsite in the Plan notebook throughout the construction period.

B. Plan Revisions: It may be necessary to revise the Plan during construction to make necessary improvements, revisions, or to respond to unforeseen conditions noted during construction or site inspections.

01 57 23.10 - 4

TEMPORARY STORM WATER POLLUTION PREVENTION

1. The Plan shall specify the mechanism whereby revisions may be proposed by the Contractor or the CO.

2. The Contractor and the CO will jointly review each revision to the Plan before changes are incorporated and implemented. The Contractor will then provide a revised copy of the Plan to the CO.

3. Accepted modifications will be implemented within 7 calendar days following the date of the inspection when deficiencies or necessary corrections are first noted.

C. Negligence: Provide additional temporary erosion and pollution controls made necessary by Contractor’s errors or negligence at no additional cost to the Government.

3.4 EROSION CONTROL MEASURES

A. Erosion control measures shall consist of any and all BMPs for storm water discharges, including but not limited to silt fencing, barrier protectors, straw bales, temporary soil retention blankets, excelsior drainage filters, sediment traps and berms.

B. Berms and excelsior drainage filters shall be used to form sediment traps and to control run-on and run-off into other areas, including creeks, streams, marshes, access roads, well areas, and the staging areas.

C. Erosion control measures shall be used to contain only direct precipitation in the construction zone. The contained water shall be allowed to percolate into the ground or drain slowly through the drainage filter sediment traps.

D. Earthen sediment traps or holding ponds shall not be used unless accepted by the CO.

E. Reduce runoff velocity as well as direct surface runoff around and away from all fuel containment, storage, and borrow areas.

F. Divert surface runoff around and away from cut and fill slopes.

G. Place drainage filters around all catch basins to create sediment traps to control run-off from the construction area.

H. Excess water used for dust control shall be contained within the demolition areas by the erosion control measures.

I. The Contractor shall prevent the deposition of materials onto paved areas. The Contractor shall inspect the paved areas for deposited materials weekly and remove the materials immediately.

J. Furnish, install, maintain, and operate necessary control measures and other equipment necessary to prevent erosion as described in the approved UPPP.

K. Before the work begins, sufficient equipment shall be available on the site to assure that the operation and adequacy of the erosion control system can be maintained.

01 57 23.10 - 5

TEMPORARY STORM WATER POLLUTION PREVENTION

3.5 MAINTENANCE OF TEMPORARY FACILITIES

A. Ensure erosion and sediment control structures remain effective throughout excavation and grading operations. Relocate structures as necessary.

B. Inspect control structures after each significant rainfall. Promptly repair breaches which occur.

C. The Contractor shall remove entrapped sediment from behind excelsior drainage filter after each storm.

3.6 REPORTING

A. If a discharge occurs or if the project receives a written notice or order from any regulatory agency, the Contractor will immediately notify the CO and will file a written report to the Agency(ies) with Jurisdiction within 7 days of the discharge event, notice, or order. Corrective measures shall be implemented immediately following the discharge, notice, or order. The report to the Agency(ies) with Jurisdiction shall contain the following items at a minimum:

1. The date, time, location, nature of operation, and type of discharge, including the cause or nature of the notice or order.

2. The BMPs deployed before the discharge event, or prior to receiving the notice or order.

3. The date of deployment and type of BMPs deployed after the discharge event, or after receiving the notice or order, including additional BMPs installed or planned to reduce or prevent re-occurrence.

4. An implementation and maintenance schedule for any affected BMPs.

3.7 SEDIMENT DISPOSAL

A. Sediment excavated from temporary sediment control structures shall be disposed on the site with general fill, or with topsoil. Sediment shall be allowed to dry out as required before reuse.

B. Contractor shall place the sediment removed from traps and other structures where it will not enter a storm drain or watercourse and where it will not immediately reenter the basin.

3.8 REMOVAL OF TEMPORARY POLLUTION CONTROL MEASURES

A. All temporary control measures shall be removed with permission of the CO within 20 working days after final acceptance of the project, and/or once grading is completed and slopes have stabilized.

END OF SECTION 01 57 23

PART 1 - GENERAL
1.1 SUMMARY
A. NPS Standards and Guidelines require that water quality be protected at all times to ensure compliance with the Organic Act. The Contractor shall prepare an Under-An-Acre Pollution Prevention Plan (UPPP) for each project resulting in less than 1 acre of soil disturbance or not otherwise subject to the requirements of the NPDES program. https://www.nps.gov/dscw/upload/UnderAnAcre-UPPP_Guideline_3-30-16_AF_120417.pdf.
B. The work of this section consists of implementing measures to Temporary Storm Water Pollution during construction activities, either through compliance with the NPDES permit program; Or in conformance with NPS guidance for UPPPs.
1.2 DEFINITIONS
A. Environmental Pollution and Damage: The presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances; or degrade the utility of the environment for aesthetic, cultural, or historical purposes.
B. UPPP: Developed and implemented pollution prevention plan (including stormwater management measures, if needed) to protect the environment from pollutants on construction projects with less than one acre of disturbance in conformance with NPS guidelines.
1.3 SUBMITTALS
A. After contract award and before the pre-construction conference, prepare and submit:
B. Inspection Schedule: Submit schedule for inspection and monitoring of all pollution prevention measures.
C. Erosion Control Products: Submit manufacturer’s product information and installation recommendations for silt fence, filter fabric, erosion control blanket, straw bales, and any other materials proposed for use on this project.
1.4 QUALITY ASSURANCE
A. The Contractor shall prepare and submit a plan to the Contracting Officer (CO) for review and concurrence.
B. Orientation Meeting: The Contractor shall be responsible for arranging and conducting a Pollution Prevention meeting/briefing to inform all parties scheduled to be on-site during the project of the measures to be implemented for proper pollution prevention and control (may be included as part of the Pre-Construction Meeting).
C. Pollution Prevention Manager: The Contractor shall designate the Pollution Prevention Manager who will be responsible for the implementation, inspection, maintenance, and amendments to the approved plan.
PART 2 - PRODUCTS
2.1 UNDER-AN-ACRE POLLUTION PREVENTION PLAN:
A. Provide a UPPP which conforms to all NPS requirements (utilize UPPP template) and include the following information and forms:
PART 3 - EXECUTION
3.1 ENVIRONMENTAL PROTECTION
A. Protection of Natural Resources: Comply with applicable regulations and these specifications. Preserve the natural resources within the project boundaries and outside the limits of work performed under this Contract in their existing condition or restore to an equivalent or improved condition as approved by the CO.
B. Construction Zone: Arrange construction activities to minimize pollution (i.e., erosion, trash, etc.) to the maximum practical extent.
3.2 UNDER-AN_ACRE POLLUTION PREVENTION PLAN
A. Review and Acceptance: The Contractor and the CO will jointly review the draft Plan and agree to any needed revisions. The Contractor shall incorporate all revisions, sign, and submit the final Plan to the CO. The final Plan will be the document enforced on the project.
B. Implementation: Implement the Plan as required throughout the construction period and maintain all erosion control elements in proper working order.
3.3 SITE INSPECTIONS AND PLAN REVISIONS
A. Inspections: The Contractor and the CO will perform a weekly inspection of the site during periods of earth disturbance.
B. Plan Revisions: It may be necessary to revise the Plan during construction to make necessary improvements, revisions, or to respond to unforeseen conditions noted during construction or site inspections.
C. Negligence: Provide additional temporary erosion and pollution controls made necessary by Contractor’s errors or negligence at no additional cost to the Government.
3.4 EROSION CONTROL MEASURES
A. Erosion control measures shall consist of any and all BMPs for storm water discharges, including but not limited to silt fencing, barrier protectors, straw bales, temporary soil retention blankets, excelsior drainage filters, sediment traps and berms.
B. Berms and excelsior drainage filters shall be used to form sediment traps and to control run-on and run-off into other areas, including creeks, streams, marshes, access roads, well areas, and the staging areas.
C. Erosion control measures shall be used to contain only direct precipitation in the construction zone. The contained water shall be allowed to percolate into the ground or drain slowly through the drainage filter sediment traps.
D. Earthen sediment traps or holding ponds shall not be used unless accepted by the CO.
E. Reduce runoff velocity as well as direct surface runoff around and away from all fuel containment, storage, and borrow areas.
F. Divert surface runoff around and away from cut and fill slopes.
G. Place drainage filters around all catch basins to create sediment traps to control run-off from the construction area.
H. Excess water used for dust control shall be contained within the demolition areas by the erosion control measures.
I. The Contractor shall prevent the deposition of materials onto paved areas. The Contractor shall inspect the paved areas for deposited materials weekly and remove the materials immediately.
J. Furnish, install, maintain, and operate necessary control measures and other equipment necessary to prevent erosion as described in the approved UPPP.
K. Before the work begins, sufficient equipment shall be available on the site to assure that the operation and adequacy of the erosion control system can be maintained.
3.5 MAINTENANCE OF TEMPORARY FACILITIES
A. Ensure erosion and sediment control structures remain effective throughout excavation and grading operations. Relocate structures as necessary.
B. Inspect control structures after each significant rainfall. Promptly repair breaches which occur.
C. The Contractor shall remove entrapped sediment from behind excelsior drainage filter after each storm.
3.6 REPORTING
A. If a discharge occurs or if the project receives a written notice or order from any regulatory agency, the Contractor will immediately notify the CO and will file a written report to the Agency(ies) with Jurisdiction within 7 days of the discharge event, notice, or order. Corrective measures shall be implemented immediately following the discharge, notice, or order. The report to the Agency(ies) with Jurisdiction shall contain the following items at a minimum:
3.7 SEDIMENT DISPOSAL
A. Sediment excavated from temporary sediment control structures shall be disposed on the site with general fill, or with topsoil. Sediment shall be allowed to dry out as required before reuse.
B. Contractor shall place the sediment removed from traps and other structures where it will not enter a storm drain or watercourse and where it will not immediately reenter the basin.
3.8 REMOVAL OF TEMPORARY POLLUTION CONTROL MEASURES
A. All temporary control measures shall be removed with permission of the CO within 20 working days after final acceptance of the project, and/or once grading is completed and slopes have stabilized.