This document contains answers to questions submitted for the solicitation to replace a water supply line at Lake Mead National Recreation Area. The existing lines can be turned off for tie-in portions for up to two days depending on time of year. Lodging will be available at nearby RV parks and motels managed by a concessionaire, though contractors should contact the concessionaire regarding operational status. Plan sheets C02 and C03 provide details on existing and replacement valves. A new bypass valve location is shown on sheet C15 in an approximate location in the desert. The termination point of replacement C900 PVC pipe is detailed on sheet C15 from Amendment 1. There are no as-built records of existing transite pipe locations. As-builts are available for preexisting lines to storage tanks but not those following the main road. Previous past performance evaluations can be used for this solicitation.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cottonwood Cove Water Supply Line Replacement
140P8121R0009
Submitted Questions #2:
1. It is our understanding that the existing lines can be briefly turned off for the tie-in portion of the project. What amount of time can the water be turned off?
Depends on the time of the week and the year. Generally 2 days maximum is a good estimate.
2. During the site walk it was discussed that the RV villages, hotels available on site.
Will availability of this lodging be affected during the project timeline due to COVID?
The motels and RV park is managed by the Concessionaire. It should be open and operating at full capacity. Their operational status in the off season is up to the concessionaire. Contractor will need to contact the concessionaire to inquire about their operational status.
3. Can the Government please pinpoint on map any/all valves that are currently existing and which need to be replaced/installed?
See details on plansheets C02. See sheet C03.
4. Can the government provide the location, on a map or provide the coordinates, of the new bypass valve to be installed allow influent water from lake to be stored in storage tanks whenever WTP is down for maintenance?
See plansheet C15. Approximately out in the desert.
5. Please identify the termination point of the C900 PVC replacement pipeline at the Water Treatment Plant.
See detail on sheet C15 from Amendment 1.
6. If existing transite pipe needs to be removed/replaced if encountered, and can we be provided as-builts for the transite piping?
There are no as-builts of known locations of the transite pipe.
7. Are As‐Builts available for preexisting operational lines leading to the storage tanks along the main road
Yes. This project does not follow the main road.
8. Can we use previous PPQ forms from prior solicitations or CPARS evaluations from other federal project for past performance?
Yes.