This document outlines project specifications for replacing a water well supply line at Lake Mead National Recreation Area. The project involves replacing an existing water supply line with new PVC pipe that meets Clark County and AWWA standards for sanitary sewer applications. An air vacuum air relief valve will be installed and the existing valve demolished. Exposed ductile iron pipes and fittings above ground will be painted blue to match existing lines. The contractor will verify subsurface materials along the alignment, expected to include sand, gravel and cobbles. Water for dust control and compaction will be drawn from Lake Mohave with metering of usage. Testing, disinfection and final inspection of the completed line will be witnessed by National Park Service representatives. Excess materials will be disposed off-site and unsuitable excavated soils placed near sewage lagoons. Work includes removal and disposal of any exposed asbestos concrete pipe.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE 309342 Page 6 of 84
Z. PVC materials shall be manufactured within eighteen (18) months of installation. UDACS section 3.11.01. Pipe shall show no signs of damage or sun burns upon installation.
Material shall be inspected of manufacturing dates by the COR prior to installation.
AA. All products supplied for permanent installation shall be new and comply with Clark
County Specs and AWWA standards for sanitary sewer applications. Certifications for the products shall be included in the Operations and Maintenance Manuals (O&M) at the completion of the project. Inventory of all items installed shall be included in the O&M manual including as-builts and cut sheets showing manufacture, size, and model number.
BB. Air Vacuum Air Relief Valves (AVAR) shall be installed at high points if needed. There is 1 existing AVAR on the supply line. Demo the existing AVAR once the supply line is abandoned.
CC. Pipes, connections and materials used shall be industry standard.
DD. The exposed Ductile Iron pipes, elbows and fittings above ground shall be painted blue indicating waterline to match the existing blue pipes on site.
EE. No potholing of existing pipes or ground was performed. Material along the alignment is expected to be sand, gravel and cobble type rocks. Notify the CO and COR of differing site conditions when encountered. Contractor shall verify the material to be encountered.
FF. Existing water supply line shall be capped at each end before backfilling. Existing pipe does not need to be filled before abandonment. See UDACS 2.12.
GG. Water for dust control and compaction needs shall be drawn from Lake Mohave.
Contractor shall provide their own equipment for their water needs. A totalizer flow meter shall be installed on the pumps or tanks to record the amount of water used. The water totals shall be reported to the NPS monthly and for the project total amount used.
Location of the pumping equipment shall be approved by the COR. Location of the facilities shall minimize the disturbances to the park visiting public.
HH. Testing and Disinfecting of the system shall be done per UDACS Specs 3.27.
Chlorination and pressure testing shall be done with the COR or a USB representative present. Make arrangements with the COR to schedule COR/USB observers.
II. A final inspection and operational testing shall be performed at the site with the COR and a representative of the Lake Mead Utility Systems Branch (USB) present.
JJ. All excess material that has been removed/demolished or was unused shall be disposed of outside of the park boundaries. This includes asphalt, pipe, metal and concrete.
KK. A spoil pile for unsuitable soil material that was excavated during trenching operations shall be located near the sewage lagoons. Spoils may be graded on the roadway surface.
The COR shall approve of the exact location and material that may be disposed.
LL. Use of explosives shall be coordinated and approved by the CO and COR.
MM. Work includes removal and safe disposal of any damaged or exposed asbestos concrete pipe. Disposal documents must be provided to NPS.