B09 Current Power Loads_0003.pdf

PDF 46 KB Posted

Attached to
Consolidation Point Rehab, Lake Mead National Recr
Solicitation number
140P8121R0003
Issued by

About this file

This document contains technical specifications for electrical loads at a consolidation point undergoing rehab as part of solicitation number 140P8121R0003 from the National Park Service Pacific West Region. The consolidation point is located within Lake Mead National Recreation Area. The specifications list current AC and DC power loads including two Bendix King B150 units drawing 120VAC at 20A each, a Watchdog 100P Environmental Monitor drawing 1A of 120VAC, POE injectors drawing between 6-12VDC, Cisco networking switches drawing between 9.6-60VDC, a Cambium wireless system drawing 54VDC at 6A, and other monitoring equipment. The total existing AC load is 41A and the total DC load is 31.9A. The solicitation seeks to upgrade the electrical infrastructure at this consolidation point to support the listed equipment loads.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AC Loads Unit Quantity Power Type Voltage Load Total load Bendix King B150 2 AC 120VAC 20A 40A Watchdog 100P Environmental Monitor 1 AC 120VAC 1A 1A

Total AC Amps 41 DC Loads

POE Injectors 3 DC 12 - 48VDC 6A 18A IP-224 1 DC 12Vdc 1.5A 1.5A Cisco Catalyst IE-3200 Switch 1 DC 9.6 - 60VDC 3.2A 3.2A Cisco Catalyst 2955 Switch 1 DC 9.6 - 60VDC 3.2A 3.2A Cambium PTP300 PIDU (POE Injector) 1 DC 54VDC 6A 6A

Total DC Amps 31.9

Consolidation PT power system loads

Sheet1

File details come from the government source that posted it. Updated .