This document is Questions and Answers related to the Brandywine Culvert Replacement project for Cuyahoga Valley National Park. The key details are:
The project solicitation number is P6424B0001 Amendment #1. It is a firm-fixed price construction contract between $1-5 million in value. The project requires replacing the Brandywine Creek historic culvert, including installing a new larger culvert adjacent to the existing one. The contractor must follow all permit conditions including an NPDES permit and USACE Nationwide Permit. The anticipated award date is early summer 2024, dependent on the review process after bid opening. The project is a 100% Small Business set-aside under NAICS code 238910 with a $19M size standard. Offerors must have a UEI number and be registered in SAM to be awarded the contract. The contracting point of contact is Christopher Bauer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6424B0001_Amd_0002.pdf | ||
| B09_Solicitation_Amendments_-_Application_0002.pdf | ||
| B09_Solicitation_Amendments_-_SWPPP_0002.pdf | ||
| Questions_and_Answers_-_Amend_2_0002.pdf | ||
| Sol_140P6424B0001_Amd_0001.pdf | ||
| Geotechnical_Report_0001.pdf | ||
| Structural_Test_and_Inspection_0001.pdf | ||
| OEPA-_Stormwater_Permit_Approval_through_2028_0001.pdf | ||
| Sol_140P6424B0001.pdf | ||
| B08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Drawings_-_Brandywine_Culvert.pdf | ||
| DOL_Wage_Determination.pdf | ||
| B08_Solicitation_-_Submittal_List.pdf | ||
| B08_Solicitation_-_Notice_to_Contractors_-_BWC.pdf | ||
| Construction_Contract_Administration.pdf | ||
| Specifications_-_Brandywine_Culvert.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: P6424B0001
Amendment #: 1
Brandywine Culvert Project – CUVA
Questions and Answers listed below:
QUESTIONS:
Question # Question Answer/Response
1. Is the geotechnical report for the project available for review?
A geotechnical report was completed by HDR and is dated March 15, 2022. It is attached for reference.
2. Who pays for soils testing, e.g. compaction, etc., the contractor or the owner?
The Contractor is to employ and pay for services of a licensed third party testing laboratory for all material evaluation and special inspections as required in the specifications.
3. Has the project received full funding? The project is funded and full funding will be in place prior to opening of the bids
4. Could you please specify an anticipated date for the project award? We are taking potential dates into consideration so that we can closely coordinate seasonal-dependent tasks within the specified 270-day performance period.
The anticipated award date will be early summer 2024. A firm award date is dependent on review times once the bid has been opened
5. Will the contractor need to consider permits related to areas adjacent to the project site (such as wetlands permits from the US Army Corps of Engineers), and if so, have these permits already been obtained
Yes, the Contractor must follow all permit conditions including: Ohio EPA National Pollutant Discharge Elimination System (NPDES) – Construction Site Stormwater General Permit and SWPPP; US Army Corps of Engineers Nationwide Permit and Preconstruction Notification. The NPS has applied for both permits.
The NPDES permit has been obtained and the USACE NWP is under-review and expected prior to the project award.
Additionally, the Contractor must adhere to the construction documents as reviewed by the State Historic Preservation Office (SHPO) deemed to have No
Adverse Effect if the work is completed as proposed. The Brandywine Creek Culvert was previously determined eligible for listing in the National Register of Historic Places and is included in the Park’s List of Classified structures. All proposed work must meet the Secretary of the Interior’s Standards.