OEPA-_Stormwater_Permit_Approval_through_2028_0001.pdf
PDF 129 KB Posted
- Attached to
- Brandywine Culvert Replacement Federal contract opportunity
- Solicitation number
- 140P6424B0001
About this file
This document is an approval letter from the Ohio Environmental Protection Agency (Ohio EPA) granting the National Park Service a National Pollutant Discharge Elimination System (NPDES) construction stormwater permit for the Brandywine Creek facility located in Cuyahoga Valley National Park in Ohio.
The key details are:
- The permit is effective June 15, 2023 and expires on April 22, 2028.
- The facility is required to comply with the permit requirements and prohibitions.
- If there are additional operators at the site, they must submit a Co-Permittee Notice of Intent (NOI) to be covered under this permit at no additional cost.
- The placement of fill into regulated waters may require additional permits from the Ohio EPA.
The related federal contract opportunity is a solicitation (IFB) from the National Park Service for the Brandywine Culvert Replacement project in the Cuyahoga Valley National Park. The project will replace the existing Brandywine Creek culvert. This is a firm-fixed price construction contract set aside for 100% Small Businesses, with a NAICS code of 238910 and a size standard of $19 million. The estimated project value is between $1 million and $5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6424B0001_Amd_0002.pdf | ||
| B09_Solicitation_Amendments_-_Application_0002.pdf | ||
| B09_Solicitation_Amendments_-_SWPPP_0002.pdf | ||
| Questions_and_Answers_-_Amend_2_0002.pdf | ||
| Geotechnical_Report_0001.pdf | ||
| Structural_Test_and_Inspection_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Sol_140P6424B0001_Amd_0001.pdf | ||
| Sol_140P6424B0001.pdf | ||
| B08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| B08_Solicitation_-_Notice_to_Contractors_-_BWC.pdf | ||
| Construction_Contract_Administration.pdf | ||
| Specifications_-_Brandywine_Culvert.pdf | ||
| Drawings_-_Brandywine_Culvert.pdf | ||
| DOL_Wage_Determination.pdf | ||
| B08_Solicitation_-_Submittal_List.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mike DeWine, Governor
Jon Husted, Lt. Governor
Anne M. Vogel, Director
50 West Town Street • Suite 700 • P.O. Box 1049 • Columbus, OH 43216-1049 epa.ohio.gov • (614) 644-3020 • (614) 644-3184 (fax)
June 15, 2023
National Park Service Midwest Region Lisa Petit 15610 Vaughn Road Brecksville OH 44141
Re: Approval Under Ohio EPA National Pollutant Discharge Elimination System (NPDES) – Construction Site Stormwater General Permit – OHC000006
Dear Applicant, Your NPDES Notice of Intent (NOI) application is approved for the following facility/site. Please use your Ohio EPA Facility Permit Number in all future correspondence.
Facility Name: Brandywine Creek Facility Location: Red Lock Area within Cuyahoga Valley Nat City: Sagamore County: Summit Ohio EPA Facility Permit Number: 3GC13839*BG Permit Effective Date: June 15, 2023 Permit Expiration Date: April 22, 2028
Please read and review the permit carefully. The permit contains requirements and prohibitions with which you must comply. A copy of the general permit may be viewed or downloaded from here. Coverage under this permit will remain in effect until a renewal of the permit is issued by the Ohio EPA.
If more than one operator (defined in the permit) will be engaged at the site, each operator shall seek coverage under the general permit. Additional operator(s) shall submit a Co-Permittee NOI to be covered under this permit. There is no fee associated with the Co-Permittee NOI form.
Please be aware that this letter only authorizes discharges in accordance with the above referenced General Permit.
The placement to fill into regulated waters of the state may require a 401 Water Quality Certification and/or Isolated Wetlands Permit from Ohio EPA. Failure to obtain the required permits in advance is a violation of Ohio Revised Code 6111 and potentially subjects you to enforcement and civil penalties.
If you need assistance or have questions, please call (614) 644-2001 and ask for Construction Site Stormwater General Permit support or visit our website at epa.ohio.gov.
Sincerely, Anne M. Vogel Director
File details come from the government source that posted it. Updated .