Sol_140P6220B0002_Amd_0005.pdf
PDF 94 KB Posted
- Attached to
- Remove and Install a New HVAC unit. Federal contract opportunity
- Solicitation number
- 140P6220B0002
About this file
This document is an amendment to a solicitation for a federal contract opportunity to remove and install a new HVAC unit at a National Park Service visitor center. The amendment revises specification sections and drawings, adds questions and answers from offerors, and changes the bid due date to August 26, 2020. The project will replace the existing geothermal piping loop with a new fluid cooler and natural gas boiler located near a maintenance building. Existing piping and heat pumps in the visitor center will also be replaced, along with adding energy recovery ventilators and attic ductless split systems. The solicitation is issued by the National Park Service Midwest Region for qualified contractors to provide all labor, materials, equipment and services for the HVAC replacement project.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P6220B0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PMM
St Louis MO 63102 11 North 4th Street NPS, MWR - Missouri MABO
08/13/20200005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/08/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Legacy Doc #: NPS
This amendment is issued to:
- Add Revised Specification Sections 075323 and 087100, Attachments 25 and 26.
- Add Revised Drawings A101, A301, S101 and S201, Attachments 27, 28, 29 and 30.
- Add the Question and Answer Sheet, Dated 8/13/2020, Attachment 31.
The SF1442, Block 13, Bid Due Date has changed to 26 August 2020, the bid due time has not changed. All other references to the Bid Due Date is changed to read 26 August 2020.
Change FAR Clause 52.219-3, to use the Alternate I:
Current Clause:
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6220B0002/0005
52.219-3 NOTICE OF HUBZONE SET-ASIDE OR SOLE
SOURCE AWARD (MAR 2020)
(a) Definitions. See 13 CFR 125.1 and
126.103 for definitions of terms used in the clause.
(b) Applicability. This clause applies only to-
(1) Contracts that have been set aside or awarded on a sole source basis to, HUBZone small business concerns;
(2) Part or parts of a multiple-award contract that have been set aside for HUBZone small business concerns;
(3) Orders set-aside for HUBZone small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F);
and
(4) Orders issued directly to HUBZone small business concerns under multiple-award contracts as described in 19.504(c)(1)(ii).
(c) General.
(1) Offers are solicited only from HUBZone small business concerns. Offers received from concerns that are not HUBZone small business concerns will not be considered.
(2) Any award resulting from this solicitation will be made to a HUBZone small business concern.
(d) Limitations on subcontracting.The
Contractor shall spend¿
(1) For services (except construction), at least 50 percent of the cost of contract performance incurred for personnel on its own employees or employees of other HUBZone small business concerns;
(2) For supplies (other than acquisition from a nonmanufacturer of the supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, on the concern or other HUBZone small business concerns;
(3) For general construction¿
(i) At least 15 percent of the cost of contract performance incurred for personnel on its own employees;
(ii) At least 50 percent of the cost of the contract performance incurred for personnel on its own employees or on a combination of its own employees and employees of
HUBZone small business concern subcontractors; and
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6220B0002/0005
(iii) No more than 50 percent of the cost of contract performance incurred for personnel on concerns that are not HUBZone small business concerns; or
(4) For construction by special trade contractors¿
(i) At least 25 percent of the cost of contract performance incurred for personnel on its own employees;
(ii) At least 50 percent of the cost of the contract performance incurred for personnel on its own employees or on a combination of its own employees and employees of
HUBZone small business concern subcontractors;
(iii) No more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone small business concerns.
(e) A HUBZone small business contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraph (b)(1) or (2) of this clause¿
[Contracting Officer check as appropriate.]
_ By the end of the base term of the contract and then by the end of each subsequent option period; or
_ By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraph (b)(3) or (4) of this clause, by the end of the performance period for the order.
(f) A HUBZone joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause shall be performed by the aggregate of the
HUBZone small business participants.
(g) Notice. The HUBZone small business offeror acknowledges that a prospective HUBZone awardee must be a HUBZone small business concern at the time of award of this contract. The
HUBZone offeror shall provide the Contracting
Officer a copy of the notice required by 13 CFR
126.501 if material changes occur before contract award that could affect its HUBZone eligibility.
If the apparently successful HUBZone offeror is not a HUBZone small business concern at the time of award of this contract, the Contracting
Officer will proceed to award to the next
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6220B0002/0005 otherwise successful HUBZone small business concern or other offeror.
(End of clause)
Change to Alternate I as follow:
Alternate I (MAR 2020) . As prescribed in
19.1309(a)(2), substitute the following paragraphs (d)(3) and (d)(4) for paragraphs
(d)(3) and (d)(4) of the basic clause:
(3) For general construction, at least 15 percent of the cost of the contract performance to be incurred for personnel shall be spent on the concern's employees; or
(4) For specialty trade construction, at least 25 percent of the cost of the contract performance to be incurred for personnel shall be spent on the concern's employees.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)