B09 - Amendment4Atch15Section232500_0004.pdf
PDF 708 KB Posted
- Attached to
- Remove and Install a New HVAC unit. Federal contract opportunity
- Solicitation number
- 140P6220B0002
About this file
This document contains a section specification for HVAC water treatment on a federal construction project. The specification requires manual and automatic chemical feed equipment to maintain water quality in closed hydronic systems, including maintaining pH between 9.0-10.5, alkalinity between 100-500 ppm, and limiting microbiological growth. Water quality in open systems like cooling towers must be maintained within separate parameter ranges. The specification outlines performance requirements, product requirements for equipment like water meters, chemical controllers and feed pumps, chemical tank requirements, and installation instructions. Testing is required to verify proper installation and operation of the water treatment system prior to and after substantial completion. The contractor must provide one year of maintenance services after installation to maintain water quality through chemical treatment.
The related federal contract opportunity is a solicitation to remove and replace the HVAC system at a National Park Service visitor center. The project includes replacing an existing geothermal piping loop with a new fluid cooler and natural gas boiler, replacing piping and heat pumps in the visitor center, adding attic ductless split systems, and installing energy recovery ventilators. The soliciting agency is the Department of the Interior National Park Service Midwest Region.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOSM – 241749 232500 - 1
031414 HVAC WATER TREATMENT
SECTION 232500
HVAC WATER TREATMENT
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following HVAC water-treatment systems:
1. Manual and automatic chemical-feed equipment and controls.
2. Stainless steel pipes and fittings.
3. Chemicals.
4. TSS controllers.
1.2 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
1.3 QUALITY ASSURANCE
A. HVAC Water-Treatment Service Provider Qualifications: An experienced HVAC water-treatment service provider, capable of analyzing water qualities, installing water-treatment equipment, and applying water treatment as specified in this Section.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Provide all hardware, chemicals, and other material necessary to maintain HVAC water quality in all systems as indicated in this Specification. Water quality for HVAC systems shall minimize corrosion, scale buildup, and biological growth for optimum efficiency of HVAC equipment without creating a hazard to operating personnel or to the environment.
B. Base HVAC water treatment on quality of water available at Project site, HVAC system equipment material characteristics and functional performance characteristics, operating personnel capabilities, and requirements and guidelines of authorities having jurisdiction.
C. Closed hydronic systems, including heat pump water shall have the following water qualities:
1. pH: Maintain a value within 9.0 to 10.5.
2. Alkalinity: Maintain a value within 100 to 500 ppm.
3. Boron: Maintain a value within 100 to 200 ppm.
4. Chemical Oxygen Demand: Maintain a maximum value of 100 ppm.
5. Soluble Copper: Maintain a maximum value of 0.20 ppm.
6. TSS: Maintain a maximum value of 10 ppm.
7. Ammonia: Maintain a maximum value of 20 ppm.
8. Free Caustic Alkalinity: Maintain a maximum value of 20 ppm.
9. Microbiological Limits:
a. Total Aerobic Plate Count: Maintain a maximum value of 1,000 organisms/mL.
b. Total Anaerobic Plate Count: Maintain a maximum value of 100 organisms/mL.
c. Nitrate Reducers: Maintain a maximum value of 100 organisms/mL.
d. Sulfate Reducers: Maintain a maximum value of zero organisms/mL.
140P6220B0002 Attachemnt 15 Amendment 4
FOSM – 241749 232500 - 2
e. Iron Bacteria: Maintain a maximum value of zero organisms/mL.
D. Open hydronic systems, including fluid-cooler spray water, shall have the following water qualities:
1. pH: Maintain a value within 8.0 to 9.1.
2. Alkalinity: Maintain a maximum value of 100 ppm.
3. Chemical Oxygen Demand: Maintain a maximum value of 100 ppm.
4. Soluble Copper: Maintain a maximum value of 0.20 ppm.
5. TSS: Maintain a maximum value of 10 ppm.
6. Ammonia: Maintain a maximum value of 20 ppm.
7. Free "OH" Alkalinity: Maintain a maximum value of zero ppm.
8. Dispersants: Provide sufficient dispersants to prevent sedimentation of fine particulate matter.
9. Microbiological Limits:
a. Total Aerobic Plate Count: Maintain a maximum value of 10,000 organisms/mL.
b. Total Anaerobic Plate Count: Maintain a maximum value of 1,000 organisms/mL.
c. Nitrate Reducers: Maintain a maximum value of 100 organisms/mL.
d. Sulfate Reducers: Maintain a maximum value of zero organisms/mL.
e. Iron Bacteria: Maintain a maximum value of zero organisms/mL.
E. Passivation for Galvanized Steel:
1. Passivation of all galvanized-steel cooling towers and other system components must be conducted strictly in accordance with manufacturer's instructions in order to validate warranties. During the required passivation period, all water-quality parameters must be maintained in accordance with manufacturer's specifications, and all other requirements must be observed.
2.2 MANUAL CHEMICAL-FEED EQUIPMENT
A. Bypass Feeders: Steel, with corrosion-resistant exterior coating, minimum 3-1/2-inch (89-mm) fill opening in the top, and NPS 3/4 (DN 20) bottom inlet and top side outlet. Provide quarter-turn or threaded fill cap with gasket seal and diaphragm arranged to lock the top onto the feeder when exposed to system pressure in the vessel. Provide a NPS 3/4 IN (DN 20) quarter-turn valve on inlet and outlet.
1. Capacity: 2 gal. (7.6 L).
2. Minimum Working Pressure: 175 psig (1210 kPa).
2.3 AUTOMATIC CHEMICAL-FEED EQUIPMENT
A. Water Meter, Oscillating Piston:
1. AWWA C700, oscillating-piston, magnetic-drive, totalization meter.
2. Body: Bronze.
3. Minimum Working-Pressure Rating: 150 psig (1035 kPa).
4. Maximum Pressure Loss at Design Flow: 3 psig (20 kPa).
5. Registration: Gallons (Liters) or cubic feet (cubic meters).
6. End Connections: Threaded.
7. Controls: Flow-control switch with normally open contacts, rated for maximum 10 A, 250-
V ac, that will momentarily close at adjustable increments of total flow.
B. Inhibitor Injection Timers:
1. Microprocessor-based controller with digital display in NEMA 250, Type 12 enclosure with gasketed and lockable door.
2. Programmable timers with infinite adjustment over full range, mounted in cabinet with hand-off-auto switches and status lights.
3. Test switch.
FOSM – 241749 232500 - 3
4. Hand-off-auto switch for chemical pump.
5. Illuminated legend to indicate feed when pump is activated.
6. Programmable lockout timer with indicator light. Lockout timer to deactivate the pump and activate alarm circuits.
7. Digital display makeup totalizer to measure amount of makeup and bleed-off water from two water meter inputs.
C. pH Controller:
1. Microprocessor-based controller, 1 percent accuracy in a range from zero to 14 units.
Incorporate solid-state integrated circuits and digital display in NEMA 250, Type 12 enclosure with gasketed and lockable door. Digital display and touch pad for input.
2. Sensor probe adaptable to sample stream manifold.
3. High, low, and normal pH indication.
4. High or low-pH-alarm-light trip points, field adjustable; with silence switch.
5. Hand-off-auto switch for acid pump.
6. Internal adjustable hysteresis or deadband.
D. TSS Controller:
1. Microprocessor-based controller, 1 percent accuracy in a range from 0.001 mg/L to 50 g/L. Incorporate solid-state integrated circuits and digital display in NEMA 250, Type 4X enclosure.
2. Digital display and touch pad for input.
3. Sensor probe adaptable to sample stream manifold.
4. High- or low-value-alarm-light trip points, field adjustable; with silence switch.
5. Hand-off-auto switch for solenoid bleed-off valve.
6. Bleed-off valve activated indication.
7. Internal adjustable hysteresis or deadband.
E. Biocide Feeder Timer:
1. Microprocessor-based controller with digital display in NEMA 250, Type 12 enclosure with gasketed and lockable door.
2. 24-hour timer with 14-day skip feature to permit activation any hour of day.
3. Precision, solid-state, bleed-off lockout timer and clock-controlled biocide pump timer.
Prebleed and bleed lockout timers.
4. Solid-state alternator to enable use of two formulations.
5. 24-hour display of time of day.
6. 14-day display of day of week.
7. Battery backup, so clock is not disturbed by power outages.
8. Hand-off-auto switches for biocide pumps.
9. Biocide A and Biocide B pump running indication.
F. Chemical Solution Tanks:
1. Chemical-resistant reservoirs fabricated from high-density opaque polyethylene with minimum 110 percent containment vessel.
2. Molded cover with recess for mounting pump.
3. Capacity: 30 gal. (114 L).
G. Chemical Solution Injection Pumps:
1. Self-priming, positive displacement; rated for intended chemical with minimum 25 percent safety factor for design pressure and temperature.
2. Adjustable flow rate.
3. Metal and thermoplastic construction.
4. Built-in relief valve.
5. Fully enclosed, continuous-duty, single-phase motor. Comply with requirements in
Section 230513 "Common Motor Requirements for HVAC Equipment."
FOSM – 241749 232500 - 4
6. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.
H. Chemical Solution Tubing: Polyethylene tubing with compression fittings and joints, except ASTM A269/A269M, Type 304 stainless steel for steam boiler injection assemblies.
I. Injection Assembly:
1. Quill: Minimum NPS 1/2 (DN 15) with insertion length sufficient to discharge into at least
25 percent of pipe diameter.
2. Ball Valve: Two-piece stainless steel, as described in "Stainless Steel Pipes and Fittings"
Article; selected to fit quill.
3. Packing Gland: Mechanical seal on quill of sufficient length to allow quill removal during system operation.
4. Assembly Pressure/Temperature Rating: Minimum 600 psig (4137 kPa) at 200 deg F (93 deg C).
2.4 CHEMICALS
A. Chemicals shall be as recommended by water-treatment system manufacturer that are compatible with piping system components and connected equipment and that can attain water quality specified in "Performance Requirements" Article.
PART 3 - EXECUTION
3.1 WATER ANALYSIS
A. Perform an analysis of supply water to determine quality of water available at Project site.
3.2 INSTALLATION
A. Install chemical-application equipment on concrete bases, level and plumb. Maintain manufacturer's recommended clearances. Arrange units, so controls and devices that require servicing are accessible. Anchor chemical tanks and floor-mounting accessories to substrate.
Install all chemical application equipment within a spill-containment area without floor drains.
B. Install water-testing equipment on wall near water-chemical-application equipment.
C. Install interconnecting control wiring for chemical-treatment controls and sensors.
D. Mount sensors and injectors in piping circuits.
E. Bypass Feeders: Install in closed hydronic systems, including heat pump water, and equip with the following:
1. Install bypass feeder in a bypass circuit around circulating pumps unless otherwise indicated on Drawings.
2. Install water meter in makeup-water supply.
3. Install a gate or full-port ball isolation valves on inlet, outlet, and drain below feeder inlet.
4. Install a swing check on inlet after the isolation valve.
F. Install automatic chemical-feed equipment for open fluid-cooler spray water and include the following:
1. Install water meter in makeup-water supply.
FOSM – 241749 232500 - 5
2. Install inhibitor injection pumps and solution tanks with injection-timer-sensing contacts in water meter.
a. Pumps shall operate for timed interval on contact closure at water meter in makeup-water supply connection. Injection pump shall discharge into boiler feedwater tank or feedwater supply connection at boiler.
3. Install TSS controller with sensor and bleed valves.
a. Bleed valves to cycle, to maintain maximum TSS concentration.
4. Install pH sensor and controller with injection pumps and solution tanks.
a. Injector pumps shall operate to maintain required pH.
5. Install biocide feeder alternating timer with two sets of injection pumps and solution tanks.
a. Injection pumps shall operate to feed biocide on an alternating basis.
3.3 PIPING CONNECTIONS
A. Piping installation requirements are specified in other Sections. Drawings indicate general arrangement of piping, fittings, and specialties.
B. Where installing piping adjacent to equipment, allow space for service and maintenance.
C. Make piping connections between HVAC water-treatment equipment and dissimilar-metal piping with dielectric fittings. Dielectric fittings are specified in Section 232113 "Hydronic Piping."
D. Install shutoff valves on HVAC water-treatment equipment inlet and outlet.
E. See Section 221119 "Domestic Water Piping Specialties" for backflow preventers required in makeup-water connections to potable-water systems.
3.4 ELECTRICAL CONNECTIONS
A. Confirm applicable electrical requirements in electrical Sections for connecting electrical equipment.
3.5 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.
B. Testing Agency: Engage a qualified testing agency to perform tests and inspections.
C. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect components, assemblies, and equipment installations, including connections.
D. Perform tests and inspections.
E. Tests and Inspections:
1. Inspect field-assembled components and equipment installation, including piping and electrical connections.
2. Inspect piping and equipment to determine that systems and equipment have been cleaned, flushed, and filled with water, and are fully operational before introducing chemicals for water-treatment system.
3. Place HVAC water-treatment system into operation, and calibrate controls during the preliminary phase of HVAC system's startup procedures.
FOSM – 241749 232500 - 6
4. Do not enclose, cover, or put piping into operation until it is tested and satisfactory test results are achieved.
5. Test for leaks and defects. If testing is performed in segments, submit separate report for each test, complete with diagram of portion of piping tested.
6. Leave uncovered and unconcealed new, altered, extended, and replaced water piping until it has been tested and approved. Expose work that has been covered or concealed before it has been tested and approved.
7. Cap and subject piping to static water pressure of 50 psig (345 kPa) above operating pressure, without exceeding pressure rating of piping system materials. Isolate test source and allow test pressure to stand for four hours. Leaks and loss in test pressure constitute defects.
8. Repair leaks and defects with new materials, and retest piping until no leaks exist.
F. Equipment will be considered defective if it does not pass tests and inspections.
G. Prepare test and inspection reports.
H. At six-week intervals following Substantial Completion, perform separate water analyses on hydronic systems to show that automatic chemical-feed systems are maintaining water quality within performance requirements specified in this Section. Submit written reports of water analysis, advising Owner of changes necessary to adhere to "Performance Requirements" Article.
3.6 MAINTENANCE SERVICE
A. Scope of Maintenance Service: Provide chemicals and service program to maintain water conditions required above, to inhibit corrosion, scale formation, and biological growth for heat pump water piping and equipment. Services and chemicals shall be provided for a period of one year from date of Substantial Completion and shall include the following:
1. Initial water analysis and HVAC water-treatment recommendations.
2. Startup assistance for Contractor to flush the systems, clean with detergents, and initially fill systems with required chemical treatment prior to operation.
3. Periodic field service and consultation.
4. Customer report charts and log sheets.
5. Laboratory technical analysis.
6. Analyses and reports of all chemical items concerning safety and compliance with government regulations.
3.7 DEMONSTRATION
A. Train Owner's maintenance personnel to adjust, operate, and maintain HVAC water-treatment systems and equipment.
B. Training: Provide a "how-to-use" self-contained breathing apparatus video that details exact operating procedures of equipment. When training is complete, turn over video to Owner for future use.
END OF SECTION