B09 - Amendment4Atch17M501_Rev1_0004.pdf
PDF 781 KB Posted
- Attached to
- Remove and Install a New HVAC unit. Federal contract opportunity
- Solicitation number
- 140P6220B0002
About this file
This document contains a mechanical equipment schedule and related specifications for a federal contract project to replace the HVAC system at a National Park Service visitor center. Key equipment to be provided includes a new fluid cooler, natural gas boiler, heat pumps, energy recovery ventilators, pumps, and associated ductwork and piping. The project scope involves disconnecting the existing geothermal loop and replacing it with the new fluid cooler and boiler located near the maintenance building. Existing piping and heat pumps in the visitor center will also be replaced. Manufacturers are specified for major equipment such as heat pumps, fans, and pumps. Relevant details involving equipment capacities, electrical specifications, and connection requirements are included.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOOR
HOT WATER BOILER
ET-1
STRAINER
AUTOMATIC
AIR VENT
AS-1
DRAIN VALVE
B-1
HPWS
HPWR
THERMOMETER (TYP)
P-1B
BELOW GRADE
TO VISITOR CENTER
B O
IL
E
R
O
O M
T O
W
N
C L
O S
U R
E
SEE DETAIL 5/M402
FOR PUMP
SPECIALITIES
P-1A
CT-1
SEE DETAIL 2/M402
FOR TOWER
CONNECTION
DETAIL
SEE DETAIL 3/M402
FOR AIR
SEPARATOR AND
EXPANSTIN TANK
CONNETIONS
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
241749
00000
FORT SMITH NATIONAL HISTORIC SITE
301 PARKER AVE
FORT SMITH, AR 72901C
U s e rs \a p u llm a n n
\D o c u m e n ts \R e v it te m p
\T S
A -M
E C
H
R
F O
S M a p u llm a n n
L T
M M
V .r v t
ARP
ARP
BGJ
01/03/2020
07310.007
M501
SCHEDULE - MECHANICAL
07310007FOSM- 5- M501 SCHEDULE - MECHANICAL
NOTES: 1. UNIT TO HAVE MERV 8 FILTERS, BACNET CONTROL INTERFACE, AND MOTORIZED OUTDOOR AND RETURN AIR DAMPER
ERV-2 MECH 1,065 1/2 0.75 750 1/3 0.75 99.1/79.6 89.8/74.8 88.2/69.8 58% 14.7/11.9 34.5/29.6 41.9/40.3 67% 10.7 15.0 208 1 60 GREENHECK ECV-20H-FM 1
ERV-1 ATTIC 1,330 3/4 0.75 1,000 1/2 0.75 99.1/79.6 85.7/72.4 92.5/72.6 56% 17.4/11.9 43.3/36.4 31.1/30.9 64% 6.8 15.0 208 3 60 GREENHECK ECV-20H-FM 1
CFM
FAN POWER
(HP) ESP (IN WG) CFM
FAN POWER
(HP) ESP (IN WG)
O/A
DB / WB
SUPPLY DB
/ WB
EXHAUST
DB / WB
MIN TOTAL
EFFECT.
O/A
DB / WB
SUPPLY DB
/ WB
EXHAUST
DB / WB
MIN TOTAL
EFFECT. MCA MOCP VOLTS PH HZMARK LOCATION
VENTILATION AIR SIDE RELIEF AIR SIDE SUMMER PERFORMANCE WINTER PERFORMANCE ELECTRICAL DATA
BASIS OF DESIGN
MANUFACTURER AND
MODEL NUMBER REMARKS
ENERGY RECOVERY VENTILATOR SCHEDULE
INTERNAL REDUNDANCY, MULTIPE UNITS TO BE PROVIDED.
3. BOILER IS SIZED FOR FULL REDUNDANCY AT 1,000 MBH WITH ONE INTERNAL MODULE DOWN. IF ALTERNATE IS PROVIDED WITHOUT
2. PROVIDE WITH CONDENSATE NEUTRALIZER KIT.
NOTES: 1. PROVIDE WITH BAS INTERFACE.
B-1 BOILER ROOM CONDENSING 1,500 60 >95% 15:1 58 68 RIELLO AR1500 1-3
EWT (°F) LWT (°F)MARK LOCATION TYPE
INPUT MBH
(NAT GAS)
MAX BOILER
FLOW (GPM)
COMBUSTION
EFFICIENCY (%)
TURNDOWN
RATIO
WATERSIDE DATA BASIS OF DESIGN
MANUFACTURER AND
MODEL NUMBER REMARKS
GAS FIRED HOT WATER BOILER SCHEDULE
3. PROVIDE WITH SOUND ATTENUATION PACKAGE WITH COMPRESSOR AND HEAT EXCHANGER VIBRATION ISOLATION, INSULATED COMPRESSOR ENCLOSURE, AND GASKETED UNIT CASING.
2. PROVIDE WITH BACNET CONTROL INTERFACE, HOT GAS REHEAT, DUCTED FILTER RACK, AND CONDENSATE OVERFLOW SENSOR.
NOTES: 1. EXISITNG HEAT PUMP UNITS TO HAVE NEW PIPING SPECIALITIES REPLACED AND HEAT EXCHANGER CLEANED PRIOR TO RECONNECTION TO NEW PIPING SYSTEM.
HP-15 OFFICE 300 25 0.5 1.4 1.8 86 102.2 8.8 7.3 11.4 12.4 0.76 68 55.5 11.1 8.7 4.56 208 1 5.23 15 TRANE GEHE009 2
HP-14 OFFICE 425 30 0.5 2.2 2.4 86 120.2 13.7 10.5 17.8 12.9 1.19 68 55.7 17.8 13.5 4.3 208 1 10.58 15 TRANE GEHE015 2
HP-13 OFFICE 400 25 0.5 1.8 1.8 86 102.3 11.4 9.5 14.7 13.2 0.97 68 55.7 14.3 11.1 4.7 208 1 8.58 15 TRANE GEHE012 2
HP-12 (E) ELV. MECH. 912 -- 0.7 5.4 2.9 86 100.8 32.4 23.5 40.2 16.8 2.27 68 55.3 43.9 34.2 5.5 208 3 15.25 20 EXISTING TRANE EXVF036
HP-11 OFFICE 575 30 0.5 2.7 3.1 86 102.7 17.4 13.9 22.5 13.0 1.5 68 55.5 21.7 16.9 4.4 208 1 14.1 20 TRANE GEHE018 2
HP-10 (E) BREAK ROOM 1,197 60 0.7 11.6 10.6 86 94.5 40.4 30.4 49.4 16.8 2.65 68 60.3 55.6 44.4 5.3 208 3 20.9 30 EXISTING TRANE EXHF042 1
HP-9 OFFICE 570 50 0.7 5.0 9.2 86 95.0 17.6 13.9 22.4 13.0 1.4 68 60.8 22.9 18.0 4.47 208 1 14.1 20 TRANE GEHE018 2
HP-8 (E) OFFICE 912 20 0.7 7.2 4.2 86 97.2 33.0 24.0 40.5 17.0 2.2 68 58.3 44.5 34.9 5.4 208 3 15.25 20 EXISTING TRANE EXHF036 1
HP-7 (E) LIBRARY 570 120 0.6 4.0 3.78 86 97.4 18.6 14.5 22.9 16.7 1.24 68 58.5 23.9 18.9 5.1 208 1 13.5 20 EXISTING TRANE EXHF018 1
HP-6 (E) OFFICE 570 20 0.6 4.0 3.78 86 97.4 18.6 14.5 22.9 16.7 1.24 68 58.5 23.9 18.9 5.1 208 1 13.5 20 EXISTING TRANE EXHF018 1
HP-5 EXHIBIT 9,000 450 0.5 87.5 18.3 86 94.8 319.8 240.3 382.8 13.9 22.73 68 61.3 366.4 294.4 4.3 208 3 122.83 150 TRANE GEVE300 2-3
HP-4 (E) EXHIBIT 6,400 500 0.6 40.0 7.5 86 101.1 251.1 183.5 302.8 15.1 19.39 68 57.5 263.3 210.3 4.6 208 3 81.73 110 EXISTING TRANE GEVE240 1
HP-3 LOBBY 3,500 615 0.6 35.0 27.1 86 94.4 124.2 91.9 147.3 14.5 8.18 68 61.7 134.2 109.6 4.5 208 3 40.9 50 TRANE GEVE120 2
HP-2 AV 2,400 600 0.45 9.0 12.1 86 106.6 75.9 61.2 92.8 15.2 5.89 68 53.7 79.4 64.2 4.6 208 3 26.7 35 TRANE GEVE072 2
HP-1 JAIL 2,900 465 0.35 26.3 18.9 86 94.6 94.4 73.8 112.6 15.1 6.26 68 61.6 102.2 84.3 4.5 208 3 31.8 45 TRANE GEVE090 2
EWT (°F) LWT (°F)
TOTAL CAP
(MBTUH)
SENSIBLE
CAP
(MBTUH)
HT REJ
(MBTUH) AHRI EER
TOTAL
POWER
(KW) EWT (°F) LWT (°F)
TOTAL CAP
(MBTUH)
HT ABS
(MBTUH) AHRI COP VOLTS PH
MIN CIRC
AMPS
MAX FUSE
AMPS
BASIS OF DESIGN
MANUFACTURER AND MODEL
NUMBER REMARKSMARK SERVES
SUPPLY
AIR (CFM)
OUTDOOR
AIR (CFM)
ESP (IN.
W.G.)
FLOW
RATE
(GPM)
PRESS.
DROP (FT
WATER)
COOLING DATA HEATING DATA ELECTRICAL DATA
WATER SOURCE HEAT PUMP SCHEDULE
3. CONTRACTOR TO CONFIRM SIZE OF EXISTING OPENING PRIOR TO ORDERING.
2. LOUVER TO BE PAINTED TO MATCH ADJACENT CONSTRUCTION.
NOTES: 1. PROVIDE WITH BIRSCREEN.
L-1 ERV-2 ALUMINUM 750 0.1 36 22 6 PRIMER GREENHECK ESD-635 1-3
W H DMARK SERVES MATERIAL CFM
MAX SP (IN
WG)
SIZE (INCHES)
FINISH
BASIS OF DESIGN
MANUFACTURER AND
MODEL NUMBER REMARKS
LOUVER SCHEDULE
NOTES: 1. UNIT WEIGHS 362 LBS. DEVICE TO BE SUPPORTED INDEPENDENT OF DUCT FROM FLOOR BELOW WITH UNISTRUT STAND.
DS-1 DUCT SILENCER HP-5 MEZZANINE 4,500 CFM,0.05 IN WG APD -- KINETICS 24-KCCS-F-4-B2-48 1
ET-1 EXPANSION TANK HOT WATER SYSTEM BOILER RM SYSTEM GALLONS = 640, TEMP. RANGE = 50°F -- TACO CBX-84
AS-1 AIR SEPARATOR HOT WATER SYSTEM BOILER RM 240 GPM @ 2.0 FT WAT PD -- SPIROTHERM VDT400
MARK FUNCTION SERVES LOCATION OPERATING CONDITIONS CAPACITY AND MOTOR HP
BASIS OF DESIGN MANUFACTURER
AND MODEL NUMBER REMARKS
MISCELLANEOUS MECHANICAL EQUIPMENT SCHEDULE
4. PROVDIE WITH PIGGYBACK FLOAT SWITCH.
3. PROVIDE 24" X 30" POLYETHYLENE BASIN. WITH AIR TIGHT COVER.
2. PROVDIE WITH SUCTION DIFFUSER.
NOTES: 1. PROVIDE WITH INVERTER DUTY MOTOR AND SHAFT GROUNDING RING.
SP-1 BOILER RM SAN SUMP PUMP 57 25 --- 3,450 1/2 115 1 60 ZOELLER M163 3-4
P-1A/B BOILER RM HPWS/R END SUCTION 240 140 78 1760 15 208 3 60 TACO CI2506D 1-2
RPM HP VOLTS PH HZMARK LOCATION SERVES TYPE FLOW GPM
HEAD FT
WG MIN % EFF
ELECTRICAL DATA BASIS OF DESIGN
MANUFACTURER AND MODEL
NUMBER REMARKS
PUMP SCHEDULE
NOTES: 1. GRILLLE TO BE INSTALLED ON EACH SIDE OF DOOR. INSTALL GRILLE IN BOTTOM HALF OF DOOR.
R-1 RETURN GRILLE 30X24 30X24 WHITE 0.05 NA CT-700L 1
S-1 SUPPLY DIFFUSER 24X24 SEE PLAN WHITE 0.1 25 TMSA
MARK SERVES TYPE
FACE SIZE
(IN.)
NECK SIZE
(IN.) FINISH
MAX PD (IN
WG)
MAX NC AT
PD SHOWN
TITUS MODEL
NUMBER REMARKS
DIFFUSER, REGISTER AND GRILLE SCHEDULE
3. TOWER TO HAVE COPPER COIL AND BASIN HEATER.
2. TOWER HAS (2) FANS POWERED BY SINGLE MOTOR.
NOTES: 1. FAN AND PUMP VFD SUPPLIED BY ELECTRICAL CONTRACTOR.
CT-1 GRADE HPWS/R 47,280 WATER 240 98.0 86.0 5.6 79.0 143 7.5 3 208 3 60 MARLEY MHF7103 1-3
FAN HP PUMP HP VOLT PH HZMARK LOCATION SERVES FAN CFM FLUID
FLUID FLOW
(GPM) EWT (°F) LWT (°F)
MAX PD
(PSI)
WET BULB
TEMP (°F)
TOTAL
CAPACITY
(MBH)
ELECTRICAL
BASIS OF DESIGN
MANUFACTURER AND
MODEL NUMBER REMARKS
CLOSED CIRCUIT COOLLING TOWER SCHEDULE
2. WALL HYDRANT TO HAVE INTEGRAL VACUUM BREAKER.
NOTES: 1. FLOOR SINK TO HAVE BOTTOM DOME STRAINER.
WH-1 WALL HYDRANT -- 3/4" -- -- -- 24" A.F.F. -- WOODFORD 65 2
FS-1 FLOOR SINK -- -- SEE PLANS 2" -- FLOOR -- ZURN Z1926 1
HOT
WATER
COLD
WATER WASTE VENT OTHER FIXTURE ACCESSORY #1 REMARKSMARK DESCRIPTION
FIXTURE CONNECTIONS
MOUNTING HEIGHT FLOW RATE
BASIS OF DESIGN MANUFACTURER AND MODEL NUMBER
PLUMBING FIXTURE SCHEDULE
NOTES: 1. PROVIDE WITH SURFACE MOUNT FRAME AND INTEGRAL THERMOSTAT AND DISCONNECT.
EWH-1 BOILER ROOM 6,825 2.0 208 1 60 12" BERKO FRC4020F 1
BTUH KW VOLTS PH HZMARK LOCATION
HEATER ELECTRICAL DATA
RECOM'D MOUNTING
HEIGHT
BASIS OF DESIGN
MANUFACTURER AND
MODEL NUMBER REMARKS
ELECTRIC UNIT HEATER SCHEDULE
PRODUCT MANUFACTURERS LISTED ON EQUIPMENT SCHEDULES
ARE THE BASIS OF DESIGN AND INDICATE MINIMUM SYSTEM
PERFORMANCE REQUIREMENTS. SEE MECHANICAL SPECIFICATIONS
FOR EQUIPMENT MANUFACTURER EQUALS AND EQUIPMENT AND
PRODUCT SALIENT CHARACTERISTICS.
SCALE: NOT TO SCALE
MECHANICAL SYSTEM ONE-LINE
DATE INITIAL
08/06/2020 ARP
140P6220B0002 Attachment 17 Amendment 4
| Sheets |
| M501 - SCHEDULE - MECHANICAL |