This set of construction documents includes plans and drawings for renovations to a maintenance building and associated HVAC systems. The drawings depict a floor plan, elevations, sections and details for modifications to an existing maintenance building that will include installing a new boiler room and cooling tower enclosure. Renovations include adding a new door opening, concrete slabs and pads, mechanical equipment, roofing, railings and stairs. The related federal contract opportunity is to remove and replace an HVAC system serving a visitor center. Work includes disconnecting from an existing geothermal loop and replacing it with a new fluid cooler and natural gas boiler near the maintenance building. The existing piping and heat pumps in the visitor center will be replaced along with ductless split systems and the addition of energy recovery ventilators. The solicitation was issued by the National Park Service Midwest Region for the Department of the Interior.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FE
UP
UP
23'-4" 5'-0"
COOLING
TOWER
ENCLOSURE
BOILER SHED
A101
A1013
A101
101-1
100-2
101-2
A101
EXISTING
MAINTENANCE
BUILDING
D1
DS
T.O. SLAB
ELEV:110'-3"
T.O. SLAB
ELEV: 110'-1"
T.O. SLAB
ELEV: 110'-2"
T.O. SLAB
ELEV: 110'-0"
T.O. SLAB
ELEV: 110'-1"
T.O. SLAB
ELEV: 110'-1"
T.O. SLAB
ELEV: 110'-0"
T.O. SLAB
ELEV: 110'-1"
T.O. SLAB
ELEV: 109'-11"
10'-0" 2'-8" 10'-8"
13 ±
± 12'-6"
A101
A101
FIRST FLOOR
110' - 3"
A101
T.O. CMU
120' - 3"
COOLING TOWER -
SEE MECH
PREFIN MET
COPING
CMU - PAINTED TO
MATCH EXISTING
CONC FTG - SEE STR
DRAINAGE
OPENING W/
EXPANDED METAL
MESH
4'-8"
CJCJ
FIRST FLOOR
110' - 3"
T.O. CMU
120' - 3"
COOLING TOWER -
SEE MECH
PREFIN MET
COPING
CMU - PAINTED TO
MATCH EXISTING
CONC FTG - SEE STRHM DOOR & FRAME -
PAINTED, TYP
101-2 100-2
EXISTING
BUILDING BEYOND
10'-8" CJ
A101
A102
A102ROOF
TERMINATION
BEYOND - SEE
6/A102
FIRST FLOOR
110' - 3"
A101
T.O. CMU
120' - 3"
CMU - PAINTED TO
MATCH EXISTING
CONC FTG - SEE STR
PREFIN MET
GUTTER &
DOWNSPOUT
4'-8"
CJCJ
FIRST FLOOR
110' - 3"
T.O. CMU
120' - 3"
COOLING TOWER -
SEE MECH
PREFIN MET
COPING
CMU - PAINTED TO
MATCH EXISTING
CONC FTG - SEE STR
BOND BEAM - SEE
STR
CONC SLAB - SEE STR
1/4" / 12"
PREFIN MET
GUTTER
MEMBRANE
ROOF
PREFIN MET TRIM
CMU -
PAINTED
TO MATCH
EXISTING
MECH EQUIP -
SEE MECH
A102
A102
A102
FIRST FLOOR
110' - 3"
T.O. CMU
120' - 3"
CONC SLAB - SEE STR
EXIST FTG
EXIST CMU WALL
MEMBRANE ROOF
EXIST ROOF &
GUTTER
A102
101-1
INSTALL A 'P' SHAPED
GUARDRAIL TO RECEIVE
HANDRAIL EXTENSION
TREADS
3'-0"
1 1/2" Ø STL PIPE
HANDRAILS W/ STL
BRACKETS @ EA POST
STL BAR GRATE
TREADS,TYP
RADIUS RETURN OF
HANDRAIL TO
GUARDRAIL,TYP
STL BAR GRATE
LANDING
L A
N D
IN
G
T
R E
A D
S
E
A
1'-0"
HANDRAIL
EXTENSION, TYP
RADIUS RETURN OF
HANDRAIL TO
GUARDRAIL,TYP
EXISTING WALL
CONSTRUCTION
A101
LANDING
5'-0"
RAILINGS TO BE
PAINTED SAFETY
YELLOW; ALL
OTHER STEEL TO
BE GALVANIZED
FIRST FLOOR
110' - 3"
101-1
MIDDLE RAIL TO BE
CENTERED BETWEEN TOP
RAIL AND STRINGER
RAILS: 1 1/2" Ø STL PIPE,
TYP
R
IS
E R
S
M A
X
V .I
.F
TREADS @ 11" EA
LANDING
5'-0"
11"
RADIUS OUTSIDE
CORNERS, TYP
RADIUS RETURN
END OF HANDRAIL
TO GUARDRAIL
STL BAR GRATE
TREADS, TYP
STL STRINGER -
SEE STR
STL CHANNELS -
SEE STR
STL BAR GRATING
LANDING - SEE STR
RAILINGS TO BE PAINTED
SAFETY YELLOW; ALL OTHER
STEEL TO BE GALVANIZED
T .O
H
A N
D R
A
IL
T .O
G
U A
R D
R A
IL
DASHED GUARDRAIL
CONTINUES AROUND
LANDING
1044 North 115th Street | Suite 300
Omaha, NE 68154
(402) 493-4800 www.schemmer.com
REVISED TITLE OF SHEET DRAWING NO.
SHEET
PMIS / PKG. NO.
OF
SUB SHEET NO.
ARCH/ENG PROJ #
DESIGNED
DRAWN
CHECKED
PREPARED
DATE
241749
00000
FORT SMITH NATIONAL HISTORIC SITE
301 PARKER AVE
FORT SMITH, AR 72901C
U s e rs \j fi e d le r\ D o c u m e n ts \R e v it te m p
\0
-A R
C H
R
-F O
S M jf ie d le r.
rv t
JLF
JLF
MJH
01/03/2020
07310.007
A101
FLOOR PLAN, ELEVATIONS &
BUILDING SECTION
07310007FOSM- 2- A101 FLOOR PLAN, ELEVATIONS & BUILDING SECTION
1 MECH EQUIP - SEE MECH
2 FLOOR SINK - SEE MECH
4 STRUCTURAL STOOP - SEE STR
5 SURFACE MOUNTED FIRE EXTINGUISHER (FE) - MOUNT 48" TO HIGHEST
OPERABLE PART TO RELEASE FROM MOUNTING BRACKET
6 PROVIDE EXPANDED METAL MESH ON INTERIOR SIDE OF CMU WALL TO
COVER DRAINAGE OPENING.
7 EXISTING MECH UNIT TO BE RELOCATED - SEE MECH
8 RELOCATED MECH UNIT - SEE MECH
9 CONC SPLASHBLOCK
10 CONC HOUSEKEEPING PAD - SEE STR
11 EXISTING DOWNSPOUT WITH UNDERGROUND STORM PIPING -
CONTRACTOR TO AVOID REMOVAL OR MODIFICATION IF POSSIBLE
12 EXISTING TREE TO REMAIN - PROVIDE PROTECTIVE FENCING AT DRIPLINE
OF TREE
13 EXISTING FORT WALL WALK TO REMAIN
REF. NOTES ( ):X
SCALE: 1/8" = 1'-0"
FLOOR PLAN - BOILER ROOM & COOLING TOWER ENCLOSURE
SCALE: 1/8" = 1'-0"
ELEVATION - WEST
SCALE: 1/8" = 1'-0"
ELEVATION - NORTH
SCALE: 1/8" = 1'-0"
ELEVATION - EAST
SCALE: 1/8" = 1'-0"
BUILDING SECTION
TRUE
NORTH
REF. DEMO NOTES ( ):DX
D1 SAWCUT AND REMOVE EXISTING WALL CONSTRUCTION AS REQ'D FOR
NEW DOOR OPENING. PROTECT CONSTRUCTION INDICATED TO REMAIN
AGAINST DAMAGE AND SOILING. PROVIDE LINTEL - SEE STR
PLAN
NORTH
SCALE: 1/8" = 1'-0"
WALL SECTION @ EXISTING
DATE INITIAL
08/12/2020 JLF
SCALE: 1/4" = 1'-0"
ENLARGED STAIR PLAN
SCALE: 1/4" = 1'-0"
STAIR SECTION
| Sheets |
| A101 - FLOOR PLAN, ELEVATIONS & BUILDING SECTION |
File details come from the government source that posted it. Updated .