This document is an amendment to a solicitation for a federal contract to remove and install a new HVAC unit. The work includes disconnecting an existing geothermal system from a visitor center and replacing it with a new fluid cooler and natural gas boiler located near a maintenance building. Existing piping and heat pumps in the visitor center will also be replaced, and an attic ductless split system replaced with heat pump units. Energy recovery ventilators will be added. The National Park Service Midwest Region is the contracting agency. The amendment provides corrections to drawings, answers questions about permitting and taxes, and identifies the current fire alarm system provider as Alert Alarm Company. The bid due date is unchanged by this amendment.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P6220B0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PMM
St Louis MO 63102 11 North 4th Street NPS, MWR - Missouri MABO
07/13/20200002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/08/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Legacy Doc #: NPS
This amendment is issued to make corrections to the drawings, provide the most recent questions with answers and provide the Site Visit sign in sheet.
The Bid Due Date has not changed.
Change the Drawings, Sheet M200, Note 7, to read, "Tower located on 12" concrete pad".
The Site Visit Attendance record is attached.
Question: Will this project be permitted? If so, who will be responsible for pulling the
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Michael Schreiber
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6220B0002/0002 permit, and the permit fees?
Answer: Fees are not required on Federal Property however, the City of Fort Smith may require fees for connections to Water and /or Sewer. Also, Oklahoma Gas and Electric (OG&E) headquartered in
Oklahoma City, is our electric service provider and, Arkansas Oklahoma Gas, (AOG) is the local natural gas service for Fort Smith. The Bidder is responsible for all fees, etc. (See FAR 52.236-7, Permits and Responsibilities).
Question: Is the project considered taxable?
Answer: The contract price is to include all applicable taxes. The contractor is responsible for contacting the State and Local taxing authority to determine if a tax exemption exists.
If an exemption exists, the contractor is to request the necessary documentation from the CO.
If the tax exempt amount is more than $250.00 the contract price will be adjusted.
Question: Who is the current fire alarm system provider?
Answer: The current alarm system has been installed and currently monitored by Alert Alarm
Company, Fort Smith, AR. 479-782-4954.
Question: Sheet S101 Detail section 3 states the mech. pad to be 12" thick, Sheet M200 note 7 states the pad to be 16". Can you provide the correct thickness?
Answer: Drawing Sheet M200, Note 7, is changed to read, "Tower located on 12" concrete pad."