Questions_and_Answers_-_Amendment_2_0002.pdf

PDF 90 KB Posted

Attached to
REMOVE DEBRIS PILES - COLLAPSED HOUSES Federal contract opportunity
Solicitation number
140P5326Q0021
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This is a Questions and Answers document (Amendment 2) for federal contract opportunity 140P5326Q0021 concerning debris removal services in Buxton, North Carolina.

The contract involves removal of debris from collapsed houses stored in a parking lot. The tonnage referenced in the scope of work (720 tons) is for reference only and must be verified in person; bidders are instructed not to bid based on assumptions and a site visit is highly recommended. This is a fixed firm price contract with no over-and-above tonnage clause for base removal. Photos of the site are available in the scope of work and satellite imagery is accessible. The debris is strictly from fallen homes, with potential encounters of asbestos, lead-based paint, or common household products, though no consolidated environmental hazards have been identified. The debris has not been tested for asbestos, and no EPA report is available. If hazardous materials are discovered, the contractor must dispose of them in accordance with North Carolina Department of Environmental Quality and EPA regulations at no additional cost. No liquidated damages are associated with schedule non-performance. The sorting area is a large parking lot with ample surrounding space for debris sorting and various removal techniques. All contract clauses flow down to subcontractors. For optional debris, the government will attempt to separate new piles from existing ones within the same parking lot or, if infeasible, at an alternative site within one mile or at Ramp 23 parking lot (approximately 20 miles north on Highway 12). The parking lot is currently closed to the public with NPS barricades at Forest Road and Lighthouse Road intersection; the contractor is responsible for maintaining barricades during work and daily shutdown, while the walking path remains open with caution tape. Additional protective fencing, signage, and barricades require COR approval.

View the file

Other files for this federal contract opportunity

Other files attached to REMOVE DEBRIS PILES - COLLAPSED HOUSES, newest first.
File Type Posted
Sol_140P5326Q0021_Amd_0002.pdf PDF
Questions_and_Answers_0001.pdf PDF
Sol_140P5326Q0021_Amd_0001.pdf PDF
Price_Schedule.pdf PDF
A1_-_Scope_of_Services_3-24-2026.pdf PDF
Sol_140P5326Q0021.pdf PDF
ATTACHMENT_4___TECHNICAL_ACCEPTABILITY_TEMPLATE_(SERVICES).docx DOCX document
DOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P5326Q0021

Amendment 2

Questions and Answers

1. Question: Photos for Initial Assessment – Are there any photos of the lot used to store the debris piles of collapsed houses in Buxton, NC. Would like to see them prior to determining to planning a site visit.

a. There are a few photos in the scope of work, you can also use any live satellite feeds you have access to, like GIS. We highly recommend a site visit.

2. Question: Site Waste Characterization- Any known environmental hazards consolidated there that require special certifications to handle and dispose of according to

Federal/State Codes?

a. No, we are not aware of any consolidated environmental hazards. You may encounter asbestos, lead based paint or other common household products. The debris is strictly fallen homes.

3. Question: Sorting Area - Is there any adjacent land/space that can be allocated for sorting the debris prior to disposal. This could allow for various removal techniques to be utilized.

a. The area is a large parking lot and there is plenty of area surrounding the debris to use for sorting.

4. Question: Liquidated Damages – Schedule - I did not see any clause in regards to liquidated damages if the schedule is not met. Can you confirm.

a. There are no liquidated damages associated with this contract.

5. Question: If a company bids at the assumption there is 720 tons, and the amount actually removed is higher is there a over and above tonnage clause available.

a. Do not bid based on an assumption of tons. The tonnage in the scope of work was provided for reference use only and must be verified in person for your bid. We highly recommend a site visit prior to bidding. This is a fixed firm price contract for debris removal as it sits there today and there will not be an over and above tonnage clause on the base removal.

6. Question: Will the option debris be moved by the government? When will it be moved in the same spot as the current debris pile?

a. In the event options are exercised in this contract, the piles will be separated from the existing piles to the best of the government's ability. The location of any new piles is intended to be in the same parking lot location, if feasible. If it is not feasible to put in the same parking lot location, an alternative site will be selected that is either within a mile radius of the current pile location or at Ramp 23 parking lot, which is about 20 miles north of Buxton on Hwy 12.

7. Question: Has the debris been checked for asbestos? Will the agency provide an exemption letter if it has?

a. No, the debris has not been checked for asbestos containing material.

8. Question: What clauses in this contract are mandatory flow downs for sub contractors?

a. All clauses flow down to subcontractors.

9. Question: Based on the language of section 3.2. if hazardous waste was found would this result in a change order for its disposal?

a. No, if any hazardous material is found, the contractor shall dispose of it in accordance with North Carolina Department of Environmental Quality (NCDEQ) and the Environmental Protection Agency (EPA) regulations.

10. Question: Has the EPA done a test on this debris area? Is a report available?

a. No, EPA test on this debris has been completed and there is no report available.

11. Question: What type, if any, fencing or barricade is required around the job site for the duration of the work?

a. The parking lot and area are currently closed to the public and a NPS barricade is up at the intersection of Forest Rd and Lighthouse Rd. While a NPS barricade is anticipated to be in place for the duration for this project, the contractor will be responsible for ensure it is set in place to best keep the public from entering the area while they are working and at the end of their work day. The walking path in the area will remain open to the public throughout the project and caution tape put up by NPS will remain in place to keep walking/biking traffic out of the worksite. Any additional protective fencing, signing and barricades the contractor deems necessary shall be approved by the COR in the field