These are technical design and control system drawings for the Mammoth Cave National Park Visitor's Center - Phase Two project located in Mammoth Cave, Kentucky. The documents detail the temperature control, network architecture, installation details, and mechanical system configurations for the facility's HVAC infrastructure, including:

Key technical specifications include multiple air handling units (AHU-1, AHU-2), fan coil units (FCU), variable air volume (VAV) terminal units, chilled water systems, and control network architecture. The drawings cover detailed wiring diagrams, controller configurations, device schedules, valve and damper specifications, and sequence of operations for various HVAC components. The project involves upgrading and expanding the existing HVAC control systems, with specific focus on temperature management, air circulation, and building environmental control across the main floor, attic, and basement levels of the visitor center.

View the file

Other files for this federal contract opportunity

Other files attached to MACA-UPGRADE INADEQUATE VC HVAC CONTROLS, newest first.
File Type Posted
A5_-_Questions_and_Answers_0002.pdf PDF
Sol_140P5325Q0015_Amd_0002.pdf PDF
A3_-_042525_MAC_VC_HVAC_Contractor_Site_Visit_0002.pdf PDF
Sol_140P5325Q0015_Amd_0001.pdf PDF
Sol_140P5325Q0015.pdf PDF
Statement_of_Work.pdf PDF
DOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAMMOTH CAVE NATIONAL PARK

VISITOR'S CENTER - PHASE TWO

MAMMOTH CAVE, KENTUCKY

Consulting

Engineer:

Architect:

Mechanical

Contractor:

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PROFESSIONAL MECHANICAL CONTRACTORS, INC.

ASHEVILLE, NC

AF

MIKE BERGER

1271 6/15/10

TC01

Page No.:

Total Project Pages:

Date:ECT Services Job Number:

Engineer :

CADD Design:

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

DATE INITIALS REVISION TYPE

A

9/2/10 AF ENGINEERING CHANGES

B

8/9/12 C2M REVISED AS-BUILT

C

D

SINCE 1981

TEMPERATURE CONTROL DRAWINGS

PAGE

NUMBER

DESCRIPTION

TEMPERATURE CONTROL DRAWINGS

PAGE

NUMBER

DESCRIPTION

NOTE:

THIS JOB IS AN EXTENSION

OF PHASE-I.

ECT JOB # 1061

B

REV.

B

REV.

B

REV.

Installation responsibilities

Mechanical Contractor shall be responsible for installing control valves, immersion temperature sensor wells, water differential pressure switches, water pressure sensors, water flow meters, etc.

These devices shall be provided to the mechanical contractor for installation. TC Installer will be responsible for all wiring on these devices.

Sheet Metal Contractor shall be responsible for installing control dampers, airflow measuring stations, etc. These devices shall be provided to the sheet metal contractor for installation. TC Installer will be responsible for mounting actuators and all wiring on these devices.

MS/TP

TECHNOLOGIES, INC.

R

MS/TP

TECHNOLOGIES, INC.

R

MS/TP

TECHNOLOGIES, INC.

R wht blk shield shield shield shield

22/2 22/2 wht wht blk blk blk wht o h m o h m

INSTALL 120 OHM END OF LINE

RESISTOR AS SHOWN ON FIRST

AND LAST CONTROLLER IN EACH

NETWORK TRUNK. SEE NETWORK

RISER DIAGRAM FOR ADDITIONAL

DETAILS.

INSTALL 120 OHM END OF LINE

RESISTOR AS SHOWN ON FIRST

AND LAST CONTROLLER IN EACH

NETWORK TRUNK. SEE NETWORK

RISER DIAGRAM FOR ADDITIONAL

DETAILS.

FIRST CONTROLLER

IN NETWORK TRUNK

TYPICAL CONTROLLER

LAST CONTROLLER

IN NETWORK TRUNK

NETWORK WIRING DETAIL

W

C

MOUNT SPACE TEMPERATURE SENSORS

AT 48" ABOVE FINISHED FLOOR.

CONFIRM MOUNTING HEIGHT WITH

CONSTRUCTION MANAGER.

FIELD VERIFY ALL SPACE

TEMPERATURE SENSOR

MOUNTING LOCATIONS

WITH CONSTRUCTION

MANAGER.

SPACE TEMPERATURE SENSOR INSTALLATION DETAILS

ST

1. USE ORANGE (PLENUM RATED, 2-CONDUCTOR, 22 GAUGE,

TWISTED SHIELED) WIRE FOR ALL NETWORK WIRING.

2. LAND SHIELD TO CHASSIS GROUND ONLY AT ONE POINT IN

NETWORK TRUNK. ALL OTHER SHIELDS SHOULD BE TIED

TOGETHER AND PROTECTED WITH ELECTRICAL TAPE.

ANY CAPILARY ENTRY INTO DUCT WORK MUST BE PROTECTED FROM THE CUT AWAY SECTION

OF DUCT. PROTECTION CAN BE ACCOMPLISHED WITH PLASTIC TUBING, RUBBER GROMMET OR

BUSHINGS. TO ELIMINATE RUBBING AND WEAR OF THE ELEMENT OR CAPILLARY IN A DUCT WITH

A LOT OF AIR MOVEMENT, ANCHOR THE ELEMENT AT ADDITIONAL POINTS.

FOR LOW LIMIT INSTALLATIONS ALWAYS BEGIN THE INSTALLATION OF CAPILLARY AT THE TOP

OF COIL (WITHIN 6") AND THEN MAKE CALCULATIONS TO DETERMINE HEIGHT OF SERPENTINE TO

COMPLETE THE INSTALLATION TO BOTTOM OF COIL. IF MORE THAN ONE LOW LIMIT IS

SPECIFIED, MOUNT ADDITIONAL LOW LIMIT ELEMENTS SO COIL SURFACE AREA IS DIVIDED

EQUALLY AMONG ALL LOW LIMIT THERMOSTATS.

AVERAGING TEMPERATURE SENSOR INSTALLATION DETAIL

LOW LIMIT THERMOSTAT INSTALLATION DETAIL

NOTICE

Any points or sequences shown in control specification will be limited to the capabilities of the factory controls that are supplied with the equipment.

DATE INITIALS REVISION TYPE

A

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-0.2

INSTALLATION DETAILS

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

AREA SERVED: AHU-1

CONTROLLER TYPE: 1188

DEVICE INSTANCE: 1001

PANEL

LOCATION: TCP-01

AREA SERVED: AHU-1

CONTROLLER TYPE: 1600

DEVICE INSTANCE: 1002

PANEL

LOCATION: TCP-01

AREA SERVED: CW SYSTEM

CONTROLLER TYPE: 660

DEVICE INSTANCE: 1003

PANEL

LOCATION: TCP-01

AREA SERVED: ROOMS 112, 114, 116

CONTROLLER TYPE: VAVI-SD

DEVICE INSTANCE: 1004

CONFIG: VAV

AREA SERVED: ROOMS 114, 116

CONTROLLER TYPE: 651

DEVICE INSTANCE: 1005

CONFIG: FCU

AREA SERVED: GREAT HALL

CONTROLLER TYPE: VAVI-SD

DEVICE INSTANCE: 1006

CONFIG: VAV

AREA SERVED: GREAT HALL

CONTROLLER TYPE: 651

DEVICE INSTANCE: 1007

CONFIG: FCU_2

AREA SERVED: GREAT HALL

CONTROLLER TYPE: VAVI-SD

DEVICE INSTANCE: 1008

CONFIG: VAV

AREA SERVED: GREAT HALL

CONTROLLER TYPE: 651

DEVICE INSTANCE: 1009

CONFIG: FCU

AREA SERVED: GREAT HALL

CONTROLLER TYPE: VAVI-SD

DEVICE INSTANCE: 1010

CONFIG: VAV

AREA SERVED: GREAT HALL

CONTROLLER TYPE: 651

DEVICE INSTANCE: 1011

CONFIG: FCU

AREA SERVED: GREAT HALL

CONTROLLER TYPE: VAVI-SD

DEVICE INSTANCE: 1012

CONFIG: VAV

AREA SERVED: GREAT HALL

CONTROLLER TYPE: 651

DEVICE INSTANCE: 1013

CONFIG: FCU_2

AREA SERVED: ROOMS 101, 102,

103, 123

CONTROLLER TYPE: 651

DEVICE INSTANCE: 1014

CONFIG: FCU

AREA SERVED: ROOMS 105, 106,

108, 109

CONTROLLER TYPE: 651

DEVICE INSTANCE: 1015

CONFIG: FCU

AREA SERVED: ROOMS 112, 116

CONTROLLER TYPE: 651

DEVICE INSTANCE: 1016

CONFIG: FCU

AREA SERVED: GREAT HALL

CONTROLLER TYPE: VAVI-SD

DEVICE INSTANCE: 1017

CONFIG: VAV

AREA SERVED: MECH/ELEC 111

CONTROLLER TYPE: VAVI-SD

DEVICE INSTANCE: 1018

CONFIG: VAV_HEAT

JACE 403

DEVICE INSTANCE: 1000

LAPTOP COMPUTER

SUPPLIED BY

ECT SERVICES

DESKTOP COMPUTER

SUPPLIED BY

ECT SERVICES

PRINTER SUPPLIED

BY ECT SERVICES

REQ.: 1200 X 12OO DPI RESOLUTION

MIN. CAP. 250 SHEETS

MIN. 120 CHARACTERS / SECOND

CHILLER

TRANE LON INTERFACE

BOARD

MAMMOTH CAVE

VISITOR'S CENTER

LAN

LOCATED IN IDF ROOM 113

JACE 120V POWER FED FROM

PANEL RP2 - CIRCUIT #20

BLUE 22/2

NON-SHIELDED

ECHELON CABLE

TERMINATES ON TB-J3 1 & 2

IN CHILLER

END OF LINE

RESISTOR

(120 OHM)

END OF LINE

RESISTOR

(120 OHM)

AREA SERVED: BOOKSTORE 130

EXHAUST

CONTROLLER TYPE: VAViH-SD

DEVICE INSTANCE: 1022

CONFIG: VAV2

AREA SERVED: MECH. ROOM 201

CONTROLLER TYPE: VLC-1188

DEVICE INSTANCE: 1046

CONFIG: AHU2a

AREA SERVED: MECH. ROOM 201

CONTROLLER TYPE: VLC-1600

DEVICE INSTANCE: 1021

CONFIG: AHU2b

AREA SERVED: CW SYSTEM

CONTROLLER TYPE: 444

DEVICE INSTANCE: 1045

LOCATION: TCP-01

AREA SERVED: STORAGE 132

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1023

CONFIG: FCU

AREA SERVED: BOOKSTORE 130

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1024

CONFIG: FCU

AREA SERVED: FCU-15, 16

CONTROLLER TYPE: VAViH-SD

DEVICE INSTANCE: 1025

CONFIG: VAV2

AREA SERVED: MECH. ROOM 201

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1026

CONFIG: FCU

AREA SERVED: FCU-17, 18

CONTROLLER TYPE: VAViH-SD

DEVICE INSTANCE: 1027

CONFIG: VAV2

AREA SERVED: SHIFT OFFICE 124

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1028

CONFIG: FCU

AREA SERVED: BASEMENT & SHIFT

OFFICE 124 EXHAUST

CONTROLLER TYPE: VAViH-SD

DEVICE INSTANCE: 1030

CONFIG: VAV2

AREA SERVED: BASEMENT

CONTROLLER TYPE: VAViH-SD

DEVICE INSTANCE: 1031

CONFIG: VAV2

AREA SERVED: FCU-22, 23

CONTROLLER TYPE: VAViH-SD

DEVICE INSTANCE: 1032

CONFIG: VAV2

AREA SERVED: EXHIBIT 133 SE

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1033

CONFIG: FCU

AREA SERVED: MANAGER 127

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1029

CONFIG: FCU

AREA SERVED: EXHIBIT 133 SW

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1034

CONFIG: FCU_CO2

AREA SERVED: GALLERY 129

EXHAUST

CONTROLLER TYPE: VAViH-SD

DEVICE INSTANCE: 1035

CONFIG: VAV2

AREA SERVED: FCU-19, 20, 21

CONTROLLER TYPE: VAViH-SD

DEVICE INSTANCE: 1036

CONFIG: VAV2

AREA SERVED: GALLERY 129

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1037

CONFIG: FCU

AREA SERVED: EXHIBIT 133 NE

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1038

CONFIG: FCU_CO2

AREA SERVED: EXHIBIT 133 NW

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1039

CONFIG: FCU

AREA SERVED: ELEV. MACH.

ROOM 010

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1040

CONFIG: FCU_HEAT

AREA SERVED: WILD CAVE TOUR

STG. 002

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1041

CONFIG: FCU_HEAT

AREA SERVED: BREAK ROOM 003

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1042

CONFIG: FCU

AREA SERVED: STAFF WK. AREA 004

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1043

CONFIG: FCU

AREA SERVED: LIBRARY 005

CONTROLLER TYPE: VLC-651

DEVICE INSTANCE: 1044

CONFIG: FCU

AREA SERVED: MECH/ELEC 111

CONTROLLER TYPE: 651

DEVICE INSTANCE: 1019

CONFIG: FCU

AREA SERVED: MECH ROOM 111

CONTROLLER TYPE: VIEWPORT

DEVICE INSTANCE: 1020

DATE INITIALS REVISION TYPE

A

8/9/12 C2M CHANGED DEVICE TYPES AS-BUILT

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-0.3

NETWORK ARCHITECTURE

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

REV.

A

DATE INITIALS REVISION TYPE

8/9/12 C2M CHANGED DEVICE TYPES AS-BUILT

B

C

D

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-0.4

NETWORK DEVICES

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

A

REV.

A

REV.

A

REV.

A

REV.

**CABLE #

22-4 SH.

RED

**NOTE:

SEE AHU CONTROLLER PAGE

FOR WIRING OF CONTROLLER I/O

(SAME CABLES)

GRN

GRN

GRN

RED

**CABLE #

22-4 SH.

GRN

**CABLE #

22-4 SH.

RED

GRN

CABLE #

22-4 SH.

R2

V-100

CABLE #

22-4 SH.

R3

V-100

RED

RED

RED

**CABLE #

18-3 SH.

**CABLE #

18-3 SH.

**CABLE #

18-3 SH.

RED

RED

**SEE NOTE

**SEE NOTE

**SEE NOTE

**SEE NOTE

**SEE NOTE

**SEE NOTE

V

C

BLU

HOT

R1

R2

R3

BRN

COM

R1

10 16

R2

10 16

R3

P A

N E

L

P

O W

E R

T R

A N

S F

O R

M E

R

WHITE

TERM. BLOCKS

GRAY

TERM. BLOCKS

BLACK

TERM. BLOCKS

RED

TERM. BLOCKS

BLU - 24V HOT

BRN - 24V COM

DATE INITIALS REVISION TYPE

A

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-0.5

AHU SAFETY CIRCUIT

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

Mechanical/Electrical Room 111

CHILLED WATER CONTROL

Enable

Setpoint

Call for Pumps

LON LON

Air-Cooled Chiller

CWP-1

Start/Stop

Status

Current

CWP-2

Start/Stop

Status

Current

Temp

TS-2104-GH-10

Temp

TS-2104-GH-10

To Phase 1

Equipment

From Phase 1

Equipment

To Phase 2

Equipment

From Phase 2

Equipment

2-Way Valve

LRB24-SR

A B

A

C

C

Typical

Phase 2

Coil &

Valve

C

C

Typical

Phase 1

Coil &

Valve

C

C

CRU-1

w/ Factory

Valve

Check

Valve

New CP-1

Start/Stop

Status

Revised

CRU-1 Piping

Note:

Refer to Job #1061 for Phase 1 of this project.

New (Phase 2)

Loop DP

V-PWXX04S

A

H

L

DATE INITIALS REVISION TYPE

A

9/2/10 AF REV. PER ENGINEER'S REQUEST

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-1.1

CHW SYSTEM LAYOUT

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

EXISTING VLC-651

CONFIG Chilled_Water_System

DEVICE 1003 LOCATED IN TCP-01

UNIVERSAL

INPUTS

IN00

Chilled Water Supply Temp

IN01

Chilled Water Return Temp

IN02 CWP-1 Status

IN03 CWP-2 Status

IN04 CHILLER CALL FOR CWP PUMPS

IN05

BO00 CWP-1 S/S

BO01 CWP-2 S/S

BO02 CHILLER START/STOP

BO03 FOR FUTURE USE

BO04 FOR FUTURE USE

BO05 CHILLER SETPOINT

POINT DESCRIPTION

BINARY

OUTPUTS

POINT DESCRIPTION

CHILLED WATER

SUPPLY TEMP

WHT

CABLE #44

08 IN00

COM

BLK

22-2 SH.

TS-2104-GH-10-AA

CHILLED WATER

RETURN TEMP

WHT

CABLE #45

10 IN01

COM

BLK

22-2 SH.

TS-2104-GH-10-AA

RED

CABLE #50

11 IN02

COM

GRN

22-4 SH.

OUT

COM

V-H908

CWP-1 STATUS

V-H908

RED

CABLE #51

13 IN03

COM

GRN

22-4 SH.

OUT

COM

V-H908

CWP-2 STATUS

V-H908

WHT

14 IN04

COM

BLK

WHT

16 IN05

COM

BLK

NOTE:

FROM PREVIOUS

MULTI-DROP

SHIELD

SHIELD

MULTI-DROP

TO NEXT

GROUND SHIELD ONLY

AT GLOBAL CONTROLLER.

TWIST AND TAPE

SO THERE IS NO

SHIELD EXPOSED

CABLE

CABLE

22-2 SH. ORG

22-2 SH. ORG

23+

23+

24-

24-

WHT

WHT

BLK

BLK

WHT

CABLE #50

BO00 21

COM

BLK

22-4 SH.

R

CWP-1 S/S

V-100 N.O.

V-100_NO

WHT

CABLE #51

BO01 23

COM

BLK

22-4 SH.

R

CWP-2 S/S

V-100 N.O.

V-100_NO

BO02 25

COM

BO03 03

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BO04 05

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

* NOTE:

FOR TRANSFORMER

DETAIL SEE TC03

24V COM 24 VAC

ERG

K

O R

5T E I S

L D

PE

N

E N

E

T R

0 5

I M

U N

Q P

E

MEANA

Y

M

GE NT

A

M P

M

X

HIGHHIGH

CAUTIONCAUTION

VOLTAGEVOLTAGE

R

BO2

7 8

BO1

R

BO0

R

64 531 2

OFF

MAC ADDRESSMAC ADDRESS

0.5A MAX

24VAC

GND

BO 3

COM

AO 0

BO 4

COM

IN 1

COM

COM

IN 3

IN 2

IN 0 / MSET

24VAC LOADS

POWER:

MOUNTING

ONLY

MADE IN USA

24VDC SOURCES 150mA

MAX LOAD - 40VA

NO BO'S - 10VA

FOR INDOOR USE ONLY

SUITABLE FOR PLENUM

USE COPPER CONDUCTORS

CLASS 2 WIRING DEVICE

FUSE, AGC-4 AMP FAST

120VAC @ 15A

240/277VAC @ 10A

120VAC 1HP

MOTOR LOAD -

RELAY RATINGS:

277VAC 3/4HP

240VAC 2HP

MS/TP

COM

IN 5

IN 4

24VDC

DATA

DATA

BACnet

250 OHM, 1% RESISTOR

ACROSS INPUT AND COM

SW1 = VLC MAC ADDRESS

4-20mA INPUTS REQUIRE

-1

-4

-7

R

BO3

BO4

R

R

STATUSSTATUS

(12FLA)

(6.9FLA)

(15FLA)

GENERAL PURPOSE -

24V COM

AO00 06

BLK

WHT

CABLE 55

18-2 SH.

WHT

CABLE #52

BLK

22-2 SH.

R

V-100 N.O.

CHILLER START/STOP

PANEL: 1TB3

V-100_NO

CHILLER SETPOINT

(FIELD VERIFY)

CHILLER SETPOINT CONNECTION NOT

AVAILABLE (IU2 OPTIONS MODULE REQUIRED)

[CABLE PULLED BUT NOT USED]

UNUSED

SPARE TERMINALS

NOT BEING USED

CABLE #00

22-4 SH.

CHILLER CALL FOR

CWP PUMPS

PANEL: 1TB4

FOR FUTURE USE

DATE INITIALS REVISION TYPE

A

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-1.2

EXISTING CHW DEVICE 1003

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

01 IN00

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

RED

03 IN01

COM

GRN

RED

GRN

(* OTHER CONDUCTORS USED)

H535NS

06 IN03

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

NOTE:

FROM PREVIOUS

MULTI-DROP

SHIELD

SHIELD

MULTI-DROP

TO NEXT

GROUND SHIELD ONLY

AT GLOBAL CONTROLLER.

TWIST AND TAPE

SO THERE IS NO

SHIELD EXPOSED

CABLE

CABLE

22-2 SH. ORG

22-2 SH. ORG

23+

23+

24-

24-

WHT

WHT

BLK

BLK

BO00 27

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

WHT

BO01 29

COM

BLK

R

H535NS

WHT

BLK

LINE

LOAD

(* OTHER CONDUCTORS USED)

BO02 30

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BO03 32

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

AO00 40

24V COM

24VAC

WHT

RED

BLK

AO01 42

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

AO02 43

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

AO03 45

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BLK

WHT

04 IN02

COM

Chilled Water Loop

Differential Pressure

24VAC

RED

V-PWLX04S

DATE INITIALS REVISION TYPE

A

9/2/10 AF REV. PER ENGINEER'S REQUEST

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-1.3

NEW CHW DEVICE 1045

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

TCP-01 LAYOUT

LOCATED IN MECH/ELEC ROOM 111

P-24" X 20" X 6"

(PANEL FRONT) (INSIDE PANEL)

TCP-01

TEMPERATURE CONTROLS

DESIGNED BY:

ECT SERVICES, INC.

LOUISVILLE, KENTUCKY

W

I R

E

T

R A

C K

2" WIRE TRACK

W

I R

E

T

R A

C K

2" WIRE TRACK

10 AMP MAIN

BREAKER

DEVICE 1001

AHU-1 PRIMARY

PANEL

TRANS-

FORMER

100 VA

VERIS

V-X100CAA

OFF = 0-10V

ON = 4-20mA

AO'S 0-7

BO 6

BO 7

BO 5

BO 4

BO 2

BO 3

BO 1

S

S

E

R

D

D

A

6 AMP MAX

BO 0

STATUS

MS/TP

This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

AO 2 - 43

COM - 44

AO 3 - 45

AO 4 - 46

COM - 47

AO 5 - 48

AO 6 - 49

COM - 50

AO 7 - 51

BACnet MS/TP

24 - DATA -

23 - DATA +

22 - 24 VDC

21 - COM

20 - IN 10

19 - IN 9

18 - COM

17 - IN 8

DRY CONTACT

THERMISTOR or

0 - 5VDC or 4-20mA

0 - 10VDC

INPUT SETUP JUMPERS

1 2 3 4

POWER:

MAX LOAD - 106VA

NO BO'S - 10VA

24VAC LOADS @ 0.5A MAX

24VDC SOURCES 100mA

TOTAL

FUSE: AGC-6 AMP FAST

CLASS 2 CIRCUITS ONLY

USE COPPER CONDUCTORS

ONLY

FOR INDOOR USE ONLY

SUITABLE FOR PLENUM

MOUNTING

SW1 = VLC MAC ADDRESS

SW2 = AO SETUP:

ON = 4-20mA

OFF = 0-10VDC

4-20mA INPUTS REQUIRE

250 OHM, 1% RESISTOR

ACROSS INPUT AND COM

BO 4 - 34

GND - 35

BO 5 - 36

BO 6 - 37

GND - 38

BO 7 - 39

AO 0 - 40

COM - 41

AO 1 - 42

24VAC - 25

GND - 26

BO 0 - 27

GND - 28

BO 1 - 29

BO 2 - 30

GND - 31

BO 3 - 32

GND - 33

EQUIPMENT 5K05

OPEN ENERGY MANAGEMENT

1 - IN 0 / MSET

2 - COM

3 - IN 1

4 - IN 2

5 - COM

6 - IN 3

7 - COM

8 - 24 VDC

LBL-VLC-1188-A

ASSEMBLED IN USA

VLC-1188

9 - IN 4

10 - COM

11 - IN 5

12 - IN 6

13 - COM

14 - IN 7

15 - COM

16 - 24 VDC

MS/TP

STATUS

ADDRESS

G

18 - DATA

17 - DATA +

16 - (NOT USED)

15 - 24VDC

14 - COM

13 - IN 7

12 - IN 6

11 - COM

10 - IN 5

ASSEMBLED IN USA

VLC-1600

L B

L V

L C

A

9 - 24VDC

8 - COM

7 - IN 4

6 - IN 3

5 - COM

4 - IN 2

3 - IN 1

2 - COM

1 - IN 0 / MSET

EQUIPMENT 5K05

OPEN ENERGY MANAGEMENT

IN 11 - 26

COM - 25

IN 10 - 24

IN 9 - 23

COM - 22

IN 8 - 21

GND - 20

24VAC - 19

24VDC - 34

COM - 33

IN 15 - 32

COM - 31

IN 14 - 30

IN 13 - 29

COM - 28

IN 12 - 27

SUITABLE FOR PLENUM MOUNTING

FOR INDOOR USE ONLY

USE COPPER CONDUCTORS ONLY

CLASS 2 CIRCUITS ONLY

ACROSS INPUT AND COM

250 OHM, 1% RESISTOR

4-20mA INPUTS REQUIRE

24VDC SOURCES 100mA TOTAL

POWER: MAX LOAD - 10VA

cause undesired operation.

including interference that may accept any interference received, interference, and (2) this device must

This device may not cause harmful to the following two conditions: (1) of the FCC Rules. Operation is subject

This device complies with Part 15

DEVICE 1002

AHU-1 SECONDARY

ERG

K

O R

5T E I S

L

D

P E

N E

N E

T R

0 5

I M

U N

Q P

E

MEAN A

Y

M

GE

N T

DEVICE 1003

CW SYSTEMS

120VAC FED FROM

PANEL RP2 -

CIRCUIT #12

DEVICE 1045

CW SYSTEMS

DATE INITIALS REVISION TYPE

A

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-1.4

PANEL LAYOUT - TCP-1

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

E n e r g y

W h e e l

Pressure

V-PXDLX02S

Temp

TS-2008-GD-10

%RH

V-HD3XVSX

Smoke Det.

By Others

Filter DP

V-PXDLX02S

HIGH

LOW

HEAT WHEEL

BYPASS N.C.

DAMPER

HEAT WHEEL DP

V-PXDLX02S

Low

High

RF VFD

Enable/Disable

Status

Speed Signal

BYPASS

Hi Limit

AFS-460-DSS

N.C. Damper

AF24-SR

EXHAUST

AIR

OUTSIDE

AIR

ENERGY WHEEL

START/STOP

STATUS

N.C. Damper

AF24-SR

Filter DP

V-PXDLX02S

Low

High

Freezestat

FS-50

CHW Valve

B330+AF24-SR

ABA

B

ELECTRIC

HEATING

0-10 VDC

SF VFD

Enable/Disable

Status

Speed Signal

AMPS

BYPASS

Hi Limit

AFS-460-DSS

Temp

TS-5012-RD-10

Temp

TS-2008-GD-10

Pressure

V-PXDXX02S

Air Flow Monitor

Factory-Provided

Low

(SP)

High

(TP)

%RH

V-HD3XVSX

Temp

TS-2008-GD-10

AHU-2 DUCT LAYOUT

DATE INITIALS REVISION TYPE

A

9/2/10 AF REV. PER ENGINEER'S REQUEST

B

8/9/12 C2M EDITED CABLE NUMBERS AS-BUILT

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-2.1

AHU2 DUCT LAYOUT

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

B

REV.

B

OFF = 0-10V

ON = 4-20mA

AO'S 0-7

BO 6

BO 7

BO 5

BO 4

BO 2

BO 3

BO 1

S

S

E

R

D

D

A

6 AMP MAX

BO 0

STATUS

MS/TP

This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

AO 2 - 43

COM - 44

AO 3 - 45

AO 4 - 46

COM - 47

AO 5 - 48

AO 6 - 49

COM - 50

AO 7 - 51

BACnet MS/TP

24 - DATA -

23 - DATA +

22 - 24 VDC

21 - COM

20 - IN 10

19 - IN 9

18 - COM

17 - IN 8

DRY CONTACT

THERMISTOR or

0 - 5VDC or 4-20mA

0 - 10VDC

INPUT SETUP JUMPERS

1 2 3 4

POWER:

MAX LOAD - 106VA

NO BO'S - 10VA

24VAC LOADS @ 0.5A MAX

24VDC SOURCES 100mA

TOTAL

FUSE: AGC-6 AMP FAST

CLASS 2 CIRCUITS ONLY

USE COPPER CONDUCTORS

ONLY

FOR INDOOR USE ONLY

SUITABLE FOR PLENUM

MOUNTING

SW1 = VLC MAC ADDRESS

SW2 = AO SETUP:

ON = 4-20mA

OFF = 0-10VDC

4-20mA INPUTS REQUIRE

250 OHM, 1% RESISTOR

ACROSS INPUT AND COM

BO 4 - 34

GND - 35

BO 5 - 36

BO 6 - 37

GND - 38

BO 7 - 39

AO 0 - 40

COM - 41

AO 1 - 42

24VAC - 25

GND - 26

BO 0 - 27

GND - 28

BO 1 - 29

BO 2 - 30

GND - 31

BO 3 - 32

GND - 33

EQUIPMENT 5K05

OPEN ENERGY MANAGEMENT

1 - IN 0 / MSET

2 - COM

3 - IN 1

4 - IN 2

5 - COM

6 - IN 3

7 - COM

8 - 24 VDC

LBL-VLC-1188-A

ASSEMBLED IN USA

VLC-1188

9 - IN 4

10 - COM

11 - IN 5

12 - IN 6

13 - COM

14 - IN 7

15 - COM

16 - 24 VDC

01 IN00

COM

BLK

WHT

03 IN01

COM

WHT

04 IN02

COM

BLK

WHT

06 IN03

COM

BLK

09 IN04

24V COM

24VAC

RED

BLK

WHT

BLK

WHT

11 IN05

COM

24VAC

RED

BLK

WHT

12 IN06

COM

24VAC

RED

BLK

WHT

14 IN07

COM

24VAC

RED

WHT

BO00 27

COM

BLK

R

V-100 N.O.

WHT

BLK WHT/YEL

WHT/BLU

YEL

ORG

WHT

BO01 29

COM

BLK

R

V-100 N.O.

WHT

BLK WHT/YEL

WHT/BLU

YEL

ORG

WHT

BO02 30

COM

BLK

R

V-100 N.O.

WHT

BLK WHT/YEL

WHT/BLU

YEL

ORG

BO03 32

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BO04 34

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BO05 36

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BO06 37

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BO07 39

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BLK

WHT

RED

V-PXDLX02S

HEAT WHEEL DP

24VAC

DATE INITIALS REVISION TYPE

A 8/9/12 C2M

MOVED TEMP SENSOR AND ADDED HEAT

WHEEL DP TO DEVICE

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-2.2

CONFIG - AHU2a (SHT 1 OF 2)

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

WHT

17 IN08

COM

BLK

PANEL TERMINALS OUT

SUPPLY FAN STATUS -- AMPS

WHT

19 IN09

COM

BLK

WHT

20 IN10

COM

BLK

NOTE:

FROM PREVIOUS

MULTI-DROP

SHIELD

SHIELD

MULTI-DROP

TO NEXT

GROUND SHIELD ONLY

AT GLOBAL CONTROLLER.

TWIST AND TAPE

SO THERE IS NO

SHIELD EXPOSED

CABLE

CABLE

22-2 SH. ORG

22-2 SH. ORG

23+

23+

24-

24-

WHT

WHT

BLK

BLK

WHT

AO00 40

COM

BLK

PANEL TERMINALS OUT

SUPPLY FAN SPEED OUTPUT

WHT

AO01 42

COM

BLK

PANEL TERMINALS OUT

EXHAUST FAN SPEED OUTPUT

WHT

AO02 43

COM

BLK

PANEL TERMINALS OUT

ELECTRIC HEAT OUTPUT

AO03 45

24V COM

24VAC

WHT

RED

BLK

AO04 46

24V COM

24VAC

WHT

RED

BLK

(NO)

AO05 48

24V COM

24VAC

WHT

RED

BLK

(NO)

AO06 49

24V COM

24VAC

WHT

RED

BLK

(NO)

AO07 51

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

(FIELD VERIFY)

DATE INITIALS REVISION TYPE

A

8/9/12 C2M EDITED TERMINAL NUMBERS

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-2.3

CONFIG - AHU2b (SHT 2 OF 2)

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

A

REV.

OUTSIDE AIR

TEMPERATURE

WHT

01 IN00

COM

BLK

TS-2008-GD-10-AA

03 IN01

OUTSIDE AIR

HUMIDITY

24V COM

24VAC

RED

BLK

WHT

V-HD2XVSX

BLK

WHT

04 IN02

COM

OUTSIDE AIR FILTER STATUS

24VAC

RED

V-PXDLX02S

BLK

WHT

06 IN03

COM

EXHAUST AIR FILTER STATUS

24VAC

RED

V-PXDLX02S

07 IN04

24V COM

BLK

WHT

SUPPLY HIGH STATIC LIMIT

AFS-460-DSS

10 IN05

24V COM

BLK

WHT

EXHAUST HIGH STATIC LIMIT

AFS-460-DSS

BLK

WHT

LOW TEMPERATURE

PROTECTION - DPDT

12 IN06

COM

FS-50

13 IN07

COM

IN08 21

COM

WHT

IN09 23

COM

BLK

(FIELD VERIFY)

PANEL TERMINALS IN

SUPPLY FAN VFD BYPASS STATUS

WHT

IN10 24

COM

BLK

(FIELD VERIFY)

PANEL TERMINALS IN

EXHAUST FAN VFD BYPASS STATUS

WHT

IN11 26

COM

BLK

HEAT WHEEL STATUS

V-H908

IN12 27

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

IN13 29

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

IN14 30

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

IN15 32

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

DATE INITIALS REVISION TYPE

A 8/9/12 C2M

REMOVED DUCT SMOKE INPUT AND MOVED

HEAT WHEEL DP SENSOR TO DEV.1020

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-2.4

CONFIG - AHU2b

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

A

REV.

TCP-2

P-18 LAYOUT

TEMPERATURE CONTROLS

Designed By:

ECT SERVICES

Louisville, Kentucky

PANEL

TRANS-

FORMER

100 VA

FUNCTIONAL DEVICES

TR100VA001

TCP-2 LAYOUT

P-18" X 16" X 6"

LOCATED IN MAMMOTH CAVE VISITORS CTR

ATTIC MECHANICAL ROOM 201

10 AMP MAIN

BREAKER

(PANEL FRONT) (INSIDE PANEL)

1-1/2" WIRE TRACK

1-1/2" WIRE TRACK

W

I R

E

T

R A

C K

W

I R

E

T

R A

C K

OFF = 0-10V

ON = 4-20mA

AO'S 0-7

BO 6

BO 7

BO 5

BO 4

BO 2

BO 3

BO 1

S

S

E

R

D

D

A

6 AMP MAX

BO 0

STATUS

MS/TP

This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

AO 2 - 43

COM - 44

AO 3 - 45

AO 4 - 46

COM - 47

AO 5 - 48

AO 6 - 49

COM - 50

AO 7 - 51

BACnet MS/TP

24 - DATA -

23 - DATA +

22 - 24 VDC

21 - COM

20 - IN 10

19 - IN 9

18 - COM

17 - IN 8

DRY CONTACT

THERMISTOR or

0 - 5VDC or 4-20mA

0 - 10VDC

INPUT SETUP JUMPERS

1 2 3 4

POWER:

MAX LOAD - 106VA

NO BO'S - 10VA

24VAC LOADS @ 0.5A MAX

24VDC SOURCES 100mA

TOTAL

FUSE: AGC-6 AMP FAST

CLASS 2 CIRCUITS ONLY

USE COPPER CONDUCTORS

ONLY

FOR INDOOR USE ONLY

SUITABLE FOR PLENUM

MOUNTING

SW1 = VLC MAC ADDRESS

SW2 = AO SETUP:

ON = 4-20mA

OFF = 0-10VDC

4-20mA INPUTS REQUIRE

250 OHM, 1% RESISTOR

ACROSS INPUT AND COM

BO 4 - 34

GND - 35

BO 5 - 36

BO 6 - 37

GND - 38

BO 7 - 39

AO 0 - 40

COM - 41

AO 1 - 42

24VAC - 25

GND - 26

BO 0 - 27

GND - 28

BO 1 - 29

BO 2 - 30

GND - 31

BO 3 - 32

GND - 33

EQUIPMENT 5K05

OPEN ENERGY MANAGEMENT

1 - IN 0 / MSET

2 - COM

3 - IN 1

4 - IN 2

5 - COM

6 - IN 3

7 - COM

8 - 24 VDC

LBL-VLC-1188-A

ASSEMBLED IN USA

VLC-1188

9 - IN 4

10 - COM

11 - IN 5

12 - IN 6

13 - COM

14 - IN 7

15 - COM

16 - 24 VDC

CONFIG AHU2a

CONFIG AHU2b

DATE INITIALS REVISION TYPE

A

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-2.5

PANEL LAYOUT - TCP-2

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

VAV

Controller

LOCATED: Refer to Schedule

Config: VAV2 -- QTY 8

COOLING-ONLY VAV TERMINAL UNIT

Unit Heater

UH-4 or 5

S/S

QTY 2 – Refer to Config FCU_Heat

DEV. 1040, 1041

ELECTRIC CABINET UNIT HEATER

Space Temp

TS-1101-WA-10

AB A

C

C

Microset II

MS-2000-BT

1FS

FLOAT

SWITCH

LOCATED: See Schedule

Config: FCU -- QTY 9, Config: FCU_Heat – Qty 2, DEV. 1040, 1041

FAN COIL UNIT

Electric Heating

Coil

Temp

TS-2004-FB-10

VLC-660

DDC Controller

BACnet

MS/TP

(2) #14 THHN

AB A

C

C

Microset II

MS-2000-BT

1FS

FLOAT

SWITCH

LOCATED: See Schedule

Config: FCU_CO2 -- QTY 2

DEV. 1034, 1038

FAN COIL UNIT W/CO2 SENSOR

Electric Heating

Coil

Temp

TS-2004-FB-10

VLC-660

DDC Controller

BACnet

MS/TP

(2) #14 THHN

CO2 SENSOR

V-CWLSXX

BACnet

+ 24VAC

Power

MS/TP

AB A

C

C

Microset II

MS-2000-BT

1FS

FLOAT

SWITCH

LOCATED: See Schedule

Config: FCU -- Qty 2

DEV. 1028, 1037

FAN COIL UNIT (BLOWER-COIL UNIT)

Electric Heating

Coil

Temp

TS-2004-FB-10

VLC-660

DDC Controller

BACnet

MS/TP

(2) #14 THHN

Refer to Sheets FP-1.3 & M3

DATE INITIALS REVISION TYPE

A

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-3.1

TERMINAL DUCT LAYOUT

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

24V COM24 VAC

VAViH-SD

BACNET

MS/TP

IN00 9

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

IN01 11

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

IN02 12

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

IN03 14

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

IN04 16

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

NOTE:

FROM PREVIOUS

MULTI-DROP

SHIELD

SHIELD

MULTI-DROP

TO NEXT

GROUND SHIELD ONLY

AT GLOBAL CONTROLLER.

TWIST AND TAPE

SO THERE IS NO

SHIELD EXPOSED

CABLE

CABLE

22-2 SH. ORG

22-2 SH. ORG

23+

23+

24-

24-

WHT

WHT

BLK

BLK

BO005

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BO016

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BO027

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

BO058

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

DATE INITIALS REVISION TYPE

A

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-3.2

CONFIG - VAV2

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ORG

BLK

WHT

RED

BLK

WHT

24 VAC

2 COM

ROOM TEMPERATURE

SENSOR

08 IN00

MS-2000-BT

WHT

10 IN01

COM

BLK

V-H300

SUPPLY FAN STATUS

WHT

11 IN02

COM

BLK

TS-2004-FB-10-AA

DISCH AIR TEMP.

BLK

WHT

13 IN03

COM

SPACE CO2

(4-20 mA)

V-CWLSXX

17 24VDC

RED

14 IN04

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

CONDENSATE

OVERFLOW ALARM

16 IN05

COM

WHT

BO00 21

COM

BLK

PANEL TERMINALS OUT

FAN START/STOP

WHT

BO01 23

COM

BLK

PANEL TERMINALS OUT

HEAT STAGE 1

BO02 25

COM

03 BO03

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

05 BO04

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

CHILLED

WATER VALVE

06 AO00

TF24-SR

02 24V GRD

01 24VAC

WHT

RED

BLK

TF24-SR-V

24V COM

24 VAC

IN00 MICROSET II Thermostat

IN01

IN02

IN03

BO00 Supply Fan Start/Stop

BO01 Heat Stage 1

BO02 FOR FUTURE USE

BO03 FOR FUTURE USE

UNIVERSAL

INPUTS POINT DESCRIPTION

BINARY

OUTPUTS POINT DESCRIPTION

VLC-651R

CONFIG FCU_CO2

AO00 Chilled Water Valve Control

ANALOG

OUTPUTS POINT DESCRIPTION

NOTE:

FROM PREVIOUS

MULTI-DROP

SHIELD

SHIELD

MULTI-DROP

TO NEXT

GROUND SHIELD ONLY

AT GLOBAL CONTROLLER.

TWIST AND TAPE

SO THERE IS NO

SHIELD EXPOSED

CABLE

CABLE

22-2 SH. ORG

22-2 SH. ORG

18+

18+

19-

19-

WHT

WHT

BLK

BLK

IN04

IN05

Discharge Air Temperature

FOR FUTURE USE

BO04 FOR FUTURE USE

FOR FUTURE USE

Space CO2 Sensor

ER

G

K

O R

5T E I S

L D

PE

N

E N

E

T R

0 5

I M

U N

Q P

E

MEANA

Y

M

GE

NT

Supply Fan Status

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

(POWER FROM FCU)

07 COM

250 Ohm Resistor

500 Ohm Resistor

DATE INITIALS REVISION TYPE

A 8/9/12 C2M

EDITED DEVICE TYPE, ADDED RESISTORS AND

MOVED CONDENSATE ALARM INPUT AS-BUILT

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-3.3

CONFIG - FCU_CO2

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

A

REV.

A

REV.

A

REV.

WHT

RED

BLK

WHT

24 VAC

2 COM

MS-2000-BT

ROOM TEMPERATURE

SENSOR

08 IN00

WHT

10 IN01

COM

BLK

V-H300

SUPPLY FAN

STATUS

WHT

11 IN02

COM

BLK

TS-2004-FB-10-AA

DISCH AIR TEMP.

13 IN03

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

WHT

14 IN04

COM

BLK

MANUFACTURER

SUPPLIED

THERMOSTAT

16 IN05

COM

WHT

BO00 21

COM

BLK

PANEL TERMINALS OUT

FAN START/STOP

WHT

BO01 23

COM

BLK

PANEL TERMINALS OUT

HEAT STAGE 1

BO02 25

COM

WHT

03 BO03

COM

BLK

UNIT HEATER

START/STOP

R

V-120 N.O.

WHT

BLK WHT/YEL

WHT/BLU

YEL

ORG

COM

LOAD

05 BO04

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

CHILLED

WATER VALVE

TF24-SR

WHT

RED

BLK

TF24-SR-V

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

CONDENSATE

OVERFLOW ALARM

24V COM

24 VAC

IN00 MICROSET II Thermostat

IN01

IN02

IN03

BO00 Supply Fan Start/Stop

BO01 Heat Stage 1

BO02 FOR FUTURE USE

BO03 Unit Heater Start/Stop

UNIVERSAL

INPUTS POINT DESCRIPTION

BINARY

OUTPUTS POINT DESCRIPTION

VLC-651R

CONFIG FCU_HEAT

AO00 Chilled Water Valve Control

ANALOG

OUTPUTS POINT DESCRIPTION

NOTE:

FROM PREVIOUS

MULTI-DROP

SHIELD

SHIELD

MULTI-DROP

TO NEXT

GROUND SHIELD ONLY

AT GLOBAL CONTROLLER.

TWIST AND TAPE

SO THERE IS NO

SHIELD EXPOSED

CABLE

CABLE

22-2 SH. ORG

22-2 SH. ORG

18+

18+

19-

19-

WHT

WHT

BLK

BLK

IN04

IN05

Discharge Air Temperature

FOR FUTURE USE

BO04 FOR FUTURE USE

Manufacturer Supplied Thermostat

FOR FUTURE USE

ER

G

K

O R

5T E I S

L D

P E

N E

N E

T R

0 5

I M

U N

Q P

E

MEANA

Y

M

GE

NT

Supply Fan Status

(POWER FROM FCU)

500 Ohm Resistor

06 AO00

02 24V GRD

01 24VAC

07 COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

DATE INITIALS REVISION TYPE

A 8/9/12 C2M

DEVICE TYPE, RESISTORS, CONDENSATE ALARM INPUT

AND MFR-SUPPLIED STAT MOUNTED AS-BUILT

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-3.4

CONFIG - FCU_HEAT

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

A

REV.

A

REV.

A

REV.

WHT

RED

BLK

WHT

24 VAC

2 COM

MS-2000-BT

ROOM TEMPERATURE

SENSOR

08 IN00

WHT

10 IN01

COM

BLK

V-H300

SUPPLY FAN

STATUS

WHT

11 IN02

COM

BLK

TS-2004-FB-10-AA

DISCH AIR TEMP.

13 IN03

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

14 IN04

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

WHT

BO00 21

COM

BLK

PANEL TERMINALS OUT

FAN START/STOP

WHT

BO01 23

COM

BLK

PANEL TERMINALS OUT

HEAT STAGE 1

WHT

BO02 25

COM

BLK

PANEL TERMINALS OUT

HEAT STAGE 2

(Existing on FCU-17 & -21

Only)

03 BO03

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

05 BO04

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

CHILLED WATER

VALVE

06 AO00

TF24-SR

24V COM

24VAC

WHT

RED

BLK

TF24-SR-V

CONDENSATE

OVERFLOW ALARM

24V COM

24 VAC

IN00 MICROSET II Thermostat

IN01

IN02

IN03

BO00 Supply Fan Start/Stop

BO01 Heat Stage 1

BO02 Heat Stage 2 (FCU-17 & -21 ONLY)

BO03

UNIVERSAL

INPUTS POINT DESCRIPTION

BINARY

OUTPUTS POINT DESCRIPTION

VLC-651R

CONFIG FCU_HEAT

AO00 Chilled Water Valve Control

ANALOG

OUTPUTS POINT DESCRIPTION

NOTE:

FROM PREVIOUS

MULTI-DROP

SHIELD

SHIELD

MULTI-DROP

TO NEXT

GROUND SHIELD ONLY

AT GLOBAL CONTROLLER.

TWIST AND TAPE

SO THERE IS NO

SHIELD EXPOSED

CABLE

CABLE

22-2 SH. ORG

22-2 SH. ORG

18+

18+

19-

19-

WHT

WHT

BLK

BLK

IN04

IN05

Discharge Air Temperature

FOR FUTURE USE

BO04 FOR FUTURE USE

FOR FUTURE USE

ER

G

K

O R

5T E I S

L D

P E

N E

N E

T R

0 5

I M

U N

Q P

E

MEANA

Y

M

GE

NT

Supply Fan Status

(POWER FROM FCU)

500 Ohm Resistor

07 COM

FOR FUTURE USE

FOR FUTURE USE

16 IN05

COM

UNUSED

BLK

WHT

SPARE TERMINALS

NOT BEING USED

DATE INITIALS REVISION TYPE

A 8/9/12 C2M

DEVICE TYPE, RESISTOR, CONDENSATE ALARM INPUT AND

ADDED STAGE 2 HEAT NOTE AS-BUILT

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-3.5

CONFIG - FCU

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

A

REV.

A

REV.

A

REV.

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-A.1

VAV SCHEDULE

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

A

9/2/10 AF REV. PER ENGINEER'S REQUEST

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-A.2

DAMPER SCHEDULE

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-A.3

VALVE SCHEDULE

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

A

9/2/10 AF REV. PER ENGINEER'S REQUEST

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-A.4

BILL OF MATERIALS

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

A

9/2/10 AF REV. PER ENGINEER'S REQUEST

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-A.5

SEQUENCE OF OPERATIONS

(SHT 1 OF 3)

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-A.6

SEQUENCE OF OPERATIONS

(SHT 2 OF 3)

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

A

9/2/10 AF REV. PER ENGINEER'S REQUEST

B

C

D

= VFD TERMINALS

PANEL TERMINAL

BLOCK

CONNECTIONS

CHILLER

TERMINALS

WIRED IN SERIES

W/AUTO SIDE OF

STARTER

= BOILER TERMINALS=

AHU/RTU/PACKAGE

UNIT TERMINALS

COOLING TOWER

TERMINALS

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

TC-A.7

SEQUENCE OF OPERATIONS

(SHT 3 OF 3)

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

SP

SP

SP

SP

SP SP

SP

SP

DATE INITIALS REVISION TYPE

A

B

C

D

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

FP-1.1

FLOOR PLAN - MAIN FLOOR

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

SP MS

- MICROSET

- CARBON

DIOXIDE

SENSOR

- FAN COIL UNIT

- VAV

- DUCTLESS

SPLIT SYSTEM

- REHEAT COIL

- UNIT VENTILATOR

- RANGE HOOD

- MCP/TCP

- UNDER SLAB

- SNS CABLE

- COMM CABLE

- 18/4 CABLING

- AHU

- RTU

- MAU

- BLOWER COIL

- UNIT HEATER

- RELIEF AIR FAN

STAINLESS PLATE

SENSOR

DUCT STATIC

PRESSURE SENSOR

PUMP

EXHAUST FAN

LOUVER

CO

RHC-##

DSS

- BOILER

- CHILLER

- COOLING TOWER

AHU

RTU

B

CT

CHL

MAU

- SUPPLY AIR FAN

- CONDENSING UNIT

- MOTORIZED DAMPERM

DP

DN

DN

SP

DATE INITIALS REVISION TYPE

A

B

C

D

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

FP-1.2

FLOOR PLAN - ATTIC

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

SP MS

- MICROSET

- CARBON

DIOXIDE

SENSOR

- FAN COIL UNIT

- VAV

- DUCTLESS

SPLIT SYSTEM

- REHEAT COIL

- UNIT VENTILATOR

- RANGE HOOD

- MCP/TCP

- UNDER SLAB

- SNS CABLE

- COMM CABLE

- 18/4 CABLING

- AHU

- RTU

- MAU

- BLOWER COIL

- UNIT HEATER

- RELIEF AIR FAN

STAINLESS PLATE

SENSOR

DUCT STATIC

PRESSURE SENSOR

PUMP

EXHAUST FAN

LOUVER

CO

RHC-##

DSS

- BOILER

- CHILLER

- COOLING TOWER

AHU

RTU

B

CT

CHL

MAU

- SUPPLY AIR FAN

- CONDENSING UNIT

SP

SP

SP

T

T

A

A

DATE INITIALS REVISION TYPE

A

9/2/10 AF REV. PER ENGINEER'S REQUEST

B

C

D

Mechanical

Contractor:

Consulting

Engineer:

Architect:

Page Number:

Job Number:Engineer:

Date:

Project:

Checked By:

CADD:

Page Title:

Project Mgr:

6/15/10

JIM LICHTEFELD AF

ASHEVILLE, NC

PROFESSIONAL MECH. CONTRACTORS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

NORFOLK, VA

PARSONS, BRINKERHOFF, QUADE, & DOUGLAS, INC.

MSB

MIKE BERGER

MAMMOTH CAVE, KENTUCKY

MAMMOTH CAVE NAT'L PARK - PHASE TWO

FP-1.3

FLOOR PLAN - BASEMENT

PHONE: (502) 636-2402

1501 S. Preston St.

Louisville, KY 40217

NOITAR

E

TNI

G

DLUB GNII

FAX: (502) 636-0105

ectservices.com

SINCE 1981

SP MS

- MICROSET

- CARBON

DIOXIDE

SENSOR

- FAN COIL UNIT

- VAV

- DUCTLESS

SPLIT SYSTEM

- REHEAT COIL

- UNIT VENTILATOR

- RANGE HOOD

- MCP/TCP

- UNDER SLAB

- SNS CABLE

- COMM CABLE

- 18/4 CABLING

- AHU

- RTU

- MAU

- BLOWER COIL

- UNIT HEATER

- RELIEF AIR FAN

STAINLESS PLATE

SENSOR

DUCT STATIC

PRESSURE SENSOR

PUMP

EXHAUST FAN

LOUVER

CO

RHC-##

DSS

- BOILER

- CHILLER

- COOLING TOWER

AHU

RTU

B

CT

CHL

MAU

- SUPPLY AIR FAN

- CONDENSING UNIT

File details come from the government source that posted it. Updated .