Sol_140P5224B0001_Amd_0003.pdf
PDF 91 KB Posted
- Attached to
- REPLACE FORT PICKENS EAST LIFT STATION Federal contract opportunity
- Solicitation number
- 140P5224B0001
About this file
This document is a solicitation amendment for Solicitation Number 140P5224B0001, which is for the replacement of the East Lift Station at Fort Pickens in the Gulf Islands National Seashore in Florida. The amendment provides clarifications and additional information related to the project requirements, including that a single individual can perform the roles of Superintendent, Safety and Security Officer, and Quality Control Manager, that soil boring reports are not available but the construction site is a previously disturbed area, the lift station depth, and dewatering discharge requirements. It also provides notice that a public bid opening will be held on July 2, 2024 at 2:05 PM CDT, and the period of performance is July 30, 2024 to November 28, 2024. The estimated price range for this single fixed-price construction contract is between $500,000 and $1,000,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI__1_-_9_CLARIFICATIONS_0003.zip | ZIP file | |
| C4_SHEET_5_OF_11_REVISION_FP-2024-EAST-Lift_Station_Revised_Site_Plan_0003.pdf | ||
| Site_Visit_Sign-In_Sheet_0003.pdf | ||
| Sol_140P5224B0001_Amd_0002.pdf | ||
| Sol_140P5224B0001_Amd_0001.pdf | ||
| Site_Visit_Agenda.pdf | ||
| BID_SCHEDULE.xlsx | XLSX spreadsheet | |
| Engineer_s_Estimated_Quantity.pdf | ||
| Atch_4_-_BID_BOND__SF24-16e.pdf | ||
| Sol_140P5224B0001.pdf | ||
| Atch_1_-_PLANS_DWG__635_192070_Final_Construction_Documents.pdf | ||
| ReadThisFirst.pdf | ||
| Atch_3_-_WAGE_DETERMINATION_FL20240112.pdf | ||
| B08_Atch_2_-_SPECS_-FP-East_LS-FINAL_Contract_Documents.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P5224B0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
SW1
Gulf Breeze FL 32563 1801 Gulf Breeze Parkway DOI, NPS, SER - GUIS Admin. Office
PSW
Tupelo MS 38804 CO Andre Ward 850-232-4630 2680 Natchez Trace Parkway NPS, SER - West MABO
PMIS 30376005/17/20240003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/17/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SOLICITATION AMENDMENT 0003: UPLOAD REVISED SITE PLAN SHEET C4 (5 OF 11) with 80KW
Generator, Site Visit Documentation, and Clarifications to RFIs 1 thru 9.
The hour and date for receipts of bids remain at 07/02/2024 1400 CDT.
INCORPORATED BY ATTACHMENTS:
ATCH 8 SITE VISIT AGENDA,
ATCH 9 SITE VISIT SIGN-IN
ATCH 10 REVISED SITE PLAN C4 (5 OF 11 PAGE REPLACEMENT), AND
ATCH 11 RFIS 1 - 9 NPS RESPONSE (ZIP FILE) TO CLARIFY PROJECT REQUIREMENTS ARE POSTED TO
SAM.GOV FOR PUBLIC VIEWING
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Evans Ward
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P5224B0001/0003
Additional clarifications of project requirements in response to industry inquiry as follows:
1. Must the Superintendents, SSO and QC Manager need to be 3 separate individuals.
NPS response - No. Project Magnitude would allow a single person to perform functions on-site.
2. Are soil boring reports available?
NPS response - No.
If soil boring reports are unavailable, may
Bidders assumed that excavation will be clear of rocks and obstructions.
NPS response - Yes. Construction Site is a previous disturb area of native sand with existing structures and foundations as per
Construction Documents.
3. What is the Lift Station Depth.
NPS response - 12 feet deep.
4. Where should Dewatering be Discharge?
NPS response - Locate discharge line on the NE side of the construction footprint at a distance of 50 feet (minimum).
5. Can the existing wet well be reused.
NPS response - NO. Bid price should reflect build new wet well as per Construction Documents.
NOTICE: A Public Bid Opening at 2:05 PM JUL 2ND
2024 will be held as Park Headquarters in the conference room. The officer shall then (1) personally and publicly open all bids received before that time, (2)if practical, read the bids aloud to the persons present, and (3) have the bids recorded.
Period of Performance: 07/30/2024 to 11/28/2024
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .