The provided document is a Site Plan for the replacement of the East Lift Station at the Gulf Islands National Seashore in Escambia County, Florida. The key details are:

The project consists of demolishing the existing lift station, 50-KW diesel generator, pump control panel, and 200-amp, 240 volt, 3-pole automatic transfer switch. A new lift station with a fiberglass wet well and 15 horsepower pump, an 80-KW propane generator with 250-gallon propane tanks, a pump control panel, and a 200-amp, 240 volt, 3-pole service rated automatic transfer switch will be installed. The bid items include Site Preparation, Site Improvements, Site Mechanical Utilities, and Site Electrical Utilities. The estimated price range for this Firm Fixed Price construction contract is between $500,000 and $1,000,000. An organized site visit is scheduled for May 29, 2024, and the solicitation is being issued as an Invitation for Bids under FAR Part 14 - Sealed Bidding. Bids must include a bid bond, and the contract will be awarded to the responsible bidder whose bid is most advantageous to the Government, considering only price and price-related factors.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSED 6' DIAMETER FIBERGLASS WETWELL

CONTRACTOR TO PROVIDE CONNECTIONS TO

EXISTING UTILITIES INCLUDING TWO (2) GRAVITY

CONNECTIONS AND TWO (2) PRESSURE PIPE

CONNECTIONS

NEW 12'x18' CONCRETE

PAD

SEE SHEET C6 FOR LIFT

STATION LAYOUT FOR

APPROXIMATE PIPED

CONNECTIONS

o o o o o o o o o o o o o o o o o o o o o o o o ooooooooooo

NEW 10' WIDE GRAVEL

ACCESS ROAD

oo o o

NEW 12' WIDE CHAIN

LINK GATE

NEW CONTROL PANEL

TO BE PLACED ON

EXISTING CONCRETE

PAD

NEW 80 KW

GENERATOR TO BE

PLACED ON EXISTING

CONCRETE PAD

NEW CHAIN LINK FENCE

NEW 1'x1' CONCRETE

PAD WITH POTABLE

WATER HOSE BIB

CONNECTING LINES SHOWN FOR REFERENCE.

CONTRACTOR TO FIELD LOCATE GRAVITY AND

PRESSURE PIPES TO DETERMINE CONNECTION

POINTS TO NEW WET WELL.

NEW CONCRETE PAD

FOR 250 GALLON

GENERATOR FUEL

STORAGE TANK

SCALE ASCALE A

SITE PLAN

C4

SCALE OF FEET

NOTES

1. 4" PF FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) #57 STONE, 60 MIL

GEOFABRIC WEED CONTROL LINER UNDER STONE PLACED AT ALL NON-PAVED

AREAS WITHIN CHAIN LINK FENCE

2. SEE SHEETS C5 & C6 FOR LIFT STATION PLAN AND SECTION DETAILS.

3. SEE ELECTRICAL PLANS FOR ELECTRICAL CONNECTIONS

4. CONTRACTOR SHALL BRING IN SAND FILL AS REQUIRED TO MATCH ORIGINAL

GRADE.

5. CONTRACTOR TO PROVIDE TEMPORARY PUMPING OF SANITARY SEWER TO MAINTAIN

OPERATIONS THROUGHOUT CONSTRUCTION. TEMPORARY PUMPING SHALL BE

SUBMITTED AND APPROVED BY THE CONTRACTING OFFICE PRIOR TO USE.

6. APPROXIMATELY 60' IN 1" PVC MAY BE NEEDED FOR WATER LINE EXTENSION.

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

OF

TITLE OF PROJECT

TITLE OF SHEET

A/E FIRM

CROFT &

ASSOCIATES

KENNESAW,

GEORGIA

01/09/2024

Jim Downey

Ken Bates

Lee Hale

303760

XXXXXX

XX

GULF ISLAND NATIONAL SEASHORE

SITE PLAN

REPLACE EAST LIFT STATION

C4

10505

32'-8"

18'-0"

12'-0"

40'-0"

35'-0"