This document is an Amendment (Amendment 0001) to a Request for Quote (RFQ) for HVAC equipment replacement at the Tuskegee Airmen National Historic Site. The amendment includes a detailed Questions and Answers attachment that clarifies specific technical requirements for the project. Key details include replacing a 7.5 Ton Heat Pump Split System with an American Standard system (Condenser Model TWA09043AAAE02P, Air Handler model TWE09043AAAP01H), with an IEER rating of 12.4. The project allows alternative refrigerants like R454B or R32, requires a new 4" concrete pad, and mandates a formal air balancing report. The park specifically seeks a humidity measurement control system and wants rigid conduit for wiring, with careful attention to neatness given the historical site context.

The contract period of performance is from 04/07/2025 to 06/06/2025, issued by the National Park Service Southeast Region (NPS SER EAST MABO) in Atlanta, Georgia. The solicitation addresses several technical nuances, including wiring installation, refrigerant type, and system specifications. Contractors are advised that while a Wage Rate Determination exists for the project, they will not be required to submit official payroll records. The amendment provides clarity on system requirements, installation methods, and specific technical expectations for potential bidders on this HVAC replacement project.

View the file

Other files for this federal contract opportunity

Other files attached to Equipment Replacement - Replace Heating, Ventilati, newest first.
File Type Posted
B08_Attachment_0007_Questions_and_Answers_140P5125Q0011_0001.pdf PDF
A04_Attachment_0006_Revised_SOW_140P5125Q0011_0001.pdf PDF
B08_Attachment_0004_PPQ_140P5125Q0011.pdf PDF
B03_Attachment_0002_WDOL_WD_140P5125Q0011.pdf PDF
B08_Attachment_0003_Price_Schedule_140P5125Q0011.xls XLS spreadsheet
Sol_140P5125Q0011.pdf PDF
A04_Attachment_0001_SOW_0044011354-01.pdf PDF
B08_Attachment_0005_Site_Visit_Information_140P51250011.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P5125Q0011 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PSE

Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW

NPS SER EAST MABO

PSE

Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW

NPS SER EAST MABO

03/17/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/17/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide a revised statement of work and questions and answers received in response to the solicitation.

The revised statement of work is provided as attachment 0006.

Questions and answers are provided as attachment 0007.

Period of Performance: 04/07/2025 to 06/06/2025

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Edward Dingle

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0001; RFQ # 140P5125Q0011 Attachment 0007

Tuskegee Airmen National Historic Site

Equipment Replacement - Replace Heating, Ventilation, & Air-conditioning Unit

Solicitation #140P5125Q0011

Questions and Answers

Question 1. It says “humidifier” just trying to confirm this or if it was supposed to be a “dehumidifier”?

Answer: It was supposed to mean just humidity control. This area would be more of a de-humidifier.

Question 2. Asking for R410A but with the new refrigerant out now 410a equipment is getting hard to come by. So, would it be okay to quote R454B or R32?

Answer: Yes, a like supplement refrigerant would be ok. This would also be more environmentally friendly.

Question 3. With Trane the system will come with communicating control and shielded cable will have to be run. With the historical site are we able to run wire in conduit up the outside wall near unit?

Answer: Running rigid conduit is ok because the site already has like kind there. Just needs to be very neat.

Question 4. What are the furnace BTUs and tonnage and what efficiency you would like to go with?

Answer: Brand – American Standard 7.5 Ton (Like Kind), System Type – Heat Pump Split System, Condenser Model Number - TWA09043AAAE02P, Air Handler model number – TWE09043AAAP01H, Electric Heater Kit model number – BAYHTRN325A, IEER rating – 12.4

Question 5. Refrigerant type is listed as 410A. Can R454B or R32 equipment be used for new equipment?

Answer: Please see response to question number 2 above.

Question 6. Do you want certified test and balance performed or air-flow verification with CFM values?

Amendment 0001; RFQ # 140P5125Q0011 Attachment 0007

Answer: Yes, The park would like a current test and balance performed or something with valves before and after.

Question 7. Scope of work calls for a humidifier which is not typical for this area. Do you want a humidifier or a dehumidifier?

Answer: The park would like a humidity measurement control, so it can understand what that valve is.

Question 8. Please clarify the requirement for a "Automatic Humidifier". Should this be a De-humidifier to reduce excess moisture in areas with high humidity levels.?

Answer: Just a humidity measurement control where we can monitor the humidity within the building.

Question 9. The existing concrete pad has settled, should a new concrete pad that is 4" tall be poured?

Answer: Yes.

Question 10. The tasks identified air Balancing, is a formal Air Balancing Report Required for the project?

Answer: Yes.

Question 11. This project has a Wage Rate Determination; Will the contractor be required to submit official payroll records?

Answer: No.