B08_Attachment_0007_Questions_and_Answers_140P5125Q0011_0001.pdf

PDF 108 KB Posted

Attached to
Equipment Replacement - Replace Heating, Ventilati
Solicitation number
140P5125Q0011
Issued by

About this file

This document is a Questions and Answers (Q&A) attachment for Request for Quote (RFQ) #140P5125Q0011 for the Tuskegee Airmen National Historic Site HVAC equipment replacement project. The Q&A addresses eight key technical questions about the equipment specifications, including refrigerant type, system configuration, and installation requirements. Significant details include approval to use alternative refrigerants like R454B or R32, confirmation of a 7.5 Ton American Standard Heat Pump Split System with specific model numbers, and requirements for a new 4" concrete pad, humidity measurement control, and a formal Air Balancing Report. The project involves replacing the existing HVAC system with a more environmentally friendly and energy-efficient unit, with specific guidelines for installation at the historical site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0001; RFQ # 140P5125Q0011 Attachment 0007

Tuskegee Airmen National Historic Site

Equipment Replacement - Replace Heating, Ventilation, & Air-conditioning Unit

Solicitation #140P5125Q0011

Questions and Answers

Question 1. It says “humidifier” just trying to confirm this or if it was supposed to be a “dehumidifier”?

Answer: It was supposed to mean just humidity control. This area would be more of a de-humidifier.

Question 2. Asking for R410A but with the new refrigerant out now 410a equipment is getting hard to come by. So, would it be okay to quote R454B or R32?

Answer: Yes, a like supplement refrigerant would be ok. This would also be more environmentally friendly.

Question 3. With Trane the system will come with communicating control and shielded cable will have to be run. With the historical site are we able to run wire in conduit up the outside wall near unit?

Answer: Running rigid conduit is ok because the site already has like kind there. Just needs to be very neat.

Question 4. What are the furnace BTUs and tonnage and what efficiency you would like to go with?

Answer: Brand – American Standard 7.5 Ton (Like Kind), System Type – Heat Pump Split System, Condenser Model Number - TWA09043AAAE02P, Air Handler model number – TWE09043AAAP01H, Electric Heater Kit model number – BAYHTRN325A, IEER rating – 12.4

Question 5. Refrigerant type is listed as 410A. Can R454B or R32 equipment be used for new equipment?

Answer: Please see response to question number 2 above.

Question 6. Do you want certified test and balance performed or air-flow verification with CFM values?

Amendment 0001; RFQ # 140P5125Q0011 Attachment 0007

Answer: Yes, The park would like a current test and balance performed or something with valves before and after.

Question 7. Scope of work calls for a humidifier which is not typical for this area. Do you want a humidifier or a dehumidifier?

Answer: The park would like a humidity measurement control, so it can understand what that valve is.

Question 8. Please clarify the requirement for a "Automatic Humidifier". Should this be a De-humidifier to reduce excess moisture in areas with high humidity levels.?

Answer: Just a humidity measurement control where we can monitor the humidity within the building.

Question 9. The existing concrete pad has settled, should a new concrete pad that is 4" tall be poured?

Answer: Yes.

Question 10. The tasks identified air Balancing, is a formal Air Balancing Report Required for the project?

Answer: Yes.

Question 11. This project has a Wage Rate Determination; Will the contractor be required to submit official payroll records?

Answer: No.