B08_140P5124Q0019_Attach_0007_Q-A_FOSU-LISQ-FOMO_HVAC-Chiller_Rental_0003.pdf
PDF 118 KB Posted
- Solicitation number
- 140P5124Q0019
About this file
This document is an excerpt containing questions and answers related to a Request for Proposal (RFP) for the rental of heating, ventilation, and air conditioning (HVAC) equipment for the Fort Sumter Liberty Square Visitor Center in Charleston, SC and the Fort Moultrie National Historic Park Visitor Center in Sullivan's Island, SC.
The key details are: The solicitation number is 140P5124Q0019 and the agency is the Department of the Interior National Park Service Southeast Region. The questions cover responsibilities for the chiller hose tie-in, required gallons per minute and head pressure, power requirements, the need for a transformer or generator, the availability of a scissor lift and crane, and other logistical considerations. The contractor is responsible for providing the HVAC rental equipment, licensed electrician services, and all necessary setup and logistics per the statement of work. No further details are provided about pricing, set-asides, award dates, or other contract terms.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001; RFP #140P5124Q0019 Attachment 0007
Fort Sumter liberty Square Visitor Education Center
Charleston, South Carolina & Fort Moultrie Visitor Center
Sullivan’s Island, South Carolina Solicitation # 140P5124Q0019
Questions and Answers
Fort Sumpter
Question 1. Who is responsible for the tie-in/line break on the chiller hose?
Answer: Offeror/contractor.
Question 2. What are the gallons needed per minute (GPMs)?
Answer: Unknown.
Question 3. What is the head pressure?
Answer: City water pressure to the building is 30 PSI.
Fort Moultrie
Question 4. The specifications mention that the onsite power available is 200A at 240V. It is not specified whether this is single-phase or three-phase power. Given that our AC equipment operates on 480V 3-phase power, would the customer prefer to use a transformer with their available power, or a generator?
Answer: Transformer specified in scope of work to avoid high decibel equipment.
Question 5. If a transformer is preferred, will the customer arrange for an electrician to handle this connection, or should we provide this service?
Answer: Offeror/Contractor is responsible for providing a licensed electrician per the statement of work.
Question 6. If a generator is preferred, would the customer like to include a fuel tank to extend the runtime between fuel services?
Answer: No generator.
Question 7. A scissor lift will be necessary for the installation of ductwork throughout the building.
Does the customer have one available, or should we arrange a rental?
Amendment 0001; RFP #140P5124Q0019 Attachment 0007
Answer: Offeror/Contractor supplied.
Question 8. A crane will be required for positioning the equipment as specified. Will this be managed by the customer, or should we include this in our proposal?
Answer: Offeror/Contractor responsible for all equipment, setup, and logistics, etc. related to this solicitation.
File details come from the government source that posted it. Updated .