This is an Amendment to Solicitation (Amendment 0002) issued by the Department of Interior, National Park Service, Northeast Region (NPNH) for a Request for Quotation (RFQ) related to HVAC system troubleshooting and repair services at the Gate-SAHO facility. The solicitation number is 140P4526Q0010, dated February 13, 2026, with an effective date of February 27, 2026. The contracting office is located at 210 New York Avenue, Staten Island, NY 10305, and all correspondence should be directed to Linda Richardson via email at linda_richardson@nps.gov.
The amendment responds to nine contractor questions regarding the scope of work described in the Statement of Work (SOW). Key clarifications include: confirmation that the revised SOW addresses all condenser units and line sets requiring testing and repair across basement, first floor, and second floor locations; clarification that contractors are responsible for diagnosing and troubleshooting the entire building's HVAC systems, including evaluation of press fittings; confirmation that all piping must be left insulated with existing insulation reused where possible and new insulation installed by the contractor where necessary; and confirmation that the chase containing line sets is not expected to be removed during investigation work. The government declined to add coil cleaning and hail guard installation to the scope or provide separate line items for insulation materials. The submission deadline remains March 11, 2026, at 2:00 PM Eastern Daylight Time, and all other terms and conditions remain unchanged.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Roselyn Sessoms
See continuation page
NPS, NER - NPNH
210 New York Ave.
Contracting Office Staten Island NY 10305
DOI, NPS, NER - NPNH
210 New York Ave.
Staten Island NY 10305
PNP
PNP
140P4526Q0010
02/27/2026
02/13/2026
1 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140P4526Q0010/0002
140P4526Q0010 - GATE-SAHO TROUBLESHOOT AND
REPAIR HVAC SYSTEM
DIRECT ALL CORRESPONDENCE RELATED TO THIS
REQUEST FOR QUOTATION (RFQ) TO LINDA RICHARDSON
VIA EMAIL AT linda_richardson@nps.gov.
The purpose of this amendment is to as follows:
1. To respond to Questions: See the following
I have the following questions that I hope can be answered.
Q1. Attached SOW on page 2 calls out 1 or 2 condenser units tech information yet at today¿s walk through there was another condenser unit on site that needed to be address can we have that information?
A1. Revised SOW covers this
Q2. Attached SOW on {Page 2 calls out 4 units tech information, but I believe at today¿s work though there had been other units not mentioned in the SOW can their tech information be provided as well?
A2. All information the park has was put in PR package, the model numbers were given if available.
Q3. Today I was in the basement, 1st floor &
2nd floor viewing the equipment and line sets can the SOW be updated to reflect all line sets on each floor be tested and repaired.
A3. Revised SOW covers this -
Q4. I saw that there had been pro press fittings used on this project and I see that the fittings are not zoom lock ( meaning these are the wrong press fittings and that is why you have leaks). With that said all the fittings on this job should be checked out and evaluated so you have a complete project when completed. Will the government revise the SOW for this matter?
A4. This is covered under the statement "The
Contractor is responsible for the diagnosis and troubleshooting of the entire buildings HVAC systems." in the SOW
Continued...
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
Q5. Most of the fittings on site have insulation on them. To test and figure out what is leaking said insulation must be removed and put back, can we have the sow updated to reflect this, so all bidders are bidding apples to apples? Also noticed were the repairs that had been made had no insulation on the copper pipe nor copper fittings are we the contractor to put insulation back on the items we did not touch? If so, can there be an allowance of insulation (footage) we can use to bid on so all contractors bid alike?
A5. Revised SOW will state that all piping will need to be left insulated, if the existing piping is usable, it can be reused, if not the contractor will be responsible for installing new insulation. The amount of pipes that is not insulated due to the repairs the park made are minimal but the need to insulate those pipes will be included. There will not be a separate line item for this material.
Q6. The existing condensers need their coils cleaned and Hail Guards are missing as well, these items not only extend the life of the equipment, but these units will function better as well. Can the SOW be updated to reflect this?
A6. No, not at this time.
Q7. In the current SOW there was a mention of valves to change out. What size are these valves and what is their location please.
A7. The scope states there may be valves and/or fittings that need to be replaced. There is no known valves that needs to be replaced.
Q8. There is a lot of papers, files, and items in areas where we are to use a torch to silver braze these lines can the contract have the SOW updated to state the Park service will move these items. I am pretty sure the government doesn¿t want contractors accessing touching their records.
A8. The Park will move any items the contractor requests us to.
Q9. There is a chase that lines sets run from basement to second floor is the contractor expected to remove this chase to test all joints and will the contractor be expected to put in back? If so, can the SOW be updated to
Continued...
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C) reflect this.
A9. The chase is not expected to be removed for the investigation work.
2. The due date remains as March 11, 2026, at
2:00 PM ED.
All other terms and conditions remain unchanged.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .