Photos_of_HVAC_systems_at_B26_0001.pdf

PDF 2 MB Posted

Attached to
GATE-TROUBLESHOOT & REPAIR HVAC-BLDG 26
Solicitation number
140P4526Q0010
Issued by

About this file

This is a photographic documentation file for an HVAC system troubleshooting and repair project at Building 26, Sandy Hook Unit, Gateway National Recreation Area, located within the National Park Service Northeast Region, dated February 2026.

The project involves two Daikin VRV IV heat pump units serving the first and second floors of Building 26. The outdoor units are identified with specific model numbers: RXYQ144XATJA (first floor unit) and RXYQ168TTJU (second floor unit), both manufactured by Daikin Manufacturing Company. The first floor unit has a serial number 31075409 and was manufactured in July 2021, while the second floor unit has serial number 15053009 and was manufactured in May 2015. Both units operate on three-phase, 208/230V, 60Hz power supply with 60A maximum overcurrent protective devices and utilize R410A refrigerant (17.2 LBS and 8.2 LBS respectively). The system includes multiple indoor air handler units distributed throughout both floors, connected via refrigerant piping runs located in the building basement. The photographic documentation shows the exterior mounted heat pump units on a platform at the backdoor, typical interior air handler units installed on both floors, and the basement piping infrastructure connecting the outdoor units to the indoor handlers. The images provide visual reference for the system configuration and current operational condition to support troubleshooting and repair activities.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gateway National Recreation Area Sandy Hook Unit

PHOTOS

Troubleshoot and Repair HVAC System at Building 26

DATED:

February 2026

NATIONAL PARK SERVICE

NORTHEAST REGION

2 x Daikin VRV IV Units Heat Pumps units – 1st floor unit on Left - B26- 2nd Floor unit on Right

Informational label of the Daikin VRV IV Unit outside the backdoor of Building 26 that serves the 1st and 2nd floor

Air handlers (typical) that servers the 1st floor of B-26

Piping Run in Basement that goes to 1st floor Air Handler Units

Air handlers (typical) that servers the 2nd floor of B-26

Piping Run in Basement that goes to 2nd floor Air Handler Units

File details come from the government source that posted it. Updated .